NEW ADMIN/ARCHIVE & DISPLAY BLDG2007-2013
2007 The pad was poured in late 2006 and in 2007the lower section was raised by the local highschool carpentry crew.
2008 In 2008 museum visitors and local wildlifeenjoyed the new structure at the rear of the site.
2008 The roof was installed in the fall of 2008.
2009 In 2009 we learned that the roof would needsnow stops
2010 By 2010 thewindows and snowstops wereinstalled
2011 2011 saw much activity in behind the cedars.The new porch was added….
2011 and water/electricity were roughed in.
2012 The Services Upgrade(water, sewer, power, communications) was
2012 The Exterior siding was donated andinstalled in the summer of 2012
2012 Landscaping work was completed and the sitewas extended to its legal survey line in the NE
2012 The site was graded and gravel was spreadand the equipment was placed
2013 The porch deck was laid and the work on theinterior began over the winter
2013 The insulation was completed over thewinter.
2013 The interior was dry-walled after the HVACsystem was installed.
2013 The exterior doors were painted andinstalled.
2013 Painting, trim and carpet installation isunderway and the fire system components.
2013 The interior finishing upper level includes an Office, Processing Rm, and Archive Rm
2013 The lower level includes a Display space, Washroom, and Utility closet
2013 This project was made possible with funding fromHeritage Canada. Seed money was provided by localgovernment and loca...
Upcoming SlideShare
Loading in...5
×

Newbldg 2007 2013

240

Published on

Slide Show about the New Administration Archives and Display building at the Pemberton Museum.
Powered by Volunteerism and Heritage Canada

Published in: Education, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
240
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Newbldg 2007 2013"

  1. 1. NEW ADMIN/ARCHIVE & DISPLAY BLDG2007-2013
  2. 2. 2007 The pad was poured in late 2006 and in 2007the lower section was raised by the local highschool carpentry crew.
  3. 3. 2008 In 2008 museum visitors and local wildlifeenjoyed the new structure at the rear of the site.
  4. 4. 2008 The roof was installed in the fall of 2008.
  5. 5. 2009 In 2009 we learned that the roof would needsnow stops
  6. 6. 2010 By 2010 thewindows and snowstops wereinstalled
  7. 7. 2011 2011 saw much activity in behind the cedars.The new porch was added….
  8. 8. 2011 and water/electricity were roughed in.
  9. 9. 2012 The Services Upgrade(water, sewer, power, communications) was
  10. 10. 2012 The Exterior siding was donated andinstalled in the summer of 2012
  11. 11. 2012 Landscaping work was completed and the sitewas extended to its legal survey line in the NE
  12. 12. 2012 The site was graded and gravel was spreadand the equipment was placed
  13. 13. 2013 The porch deck was laid and the work on theinterior began over the winter
  14. 14. 2013 The insulation was completed over thewinter.
  15. 15. 2013 The interior was dry-walled after the HVACsystem was installed.
  16. 16. 2013 The exterior doors were painted andinstalled.
  17. 17. 2013 Painting, trim and carpet installation isunderway and the fire system components.
  18. 18. 2013 The interior finishing upper level includes an Office, Processing Rm, and Archive Rm
  19. 19. 2013 The lower level includes a Display space, Washroom, and Utility closet
  20. 20. 2013 This project was made possible with funding fromHeritage Canada. Seed money was provided by localgovernment and local businesses and members. Thanksto all who have supported this project since 2007.
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×