Sr710 study update_power_point final final

156 views
110 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
156
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Sr710 study update_power_point final final

  1. 1. SR-710 STUDY UPDATE SEPTEMBER 18, 2013 City of South Pasadena
  2. 2. No Build • This option would have no effect on South Pasadena in terms of the SR-710 • The term no build refers to the SR-710 project, but other projects in this scenario would still be built (e.g. Gold Line Foothill Extension).
  3. 3. Bus Rapid Transit (BRT)
  4. 4. Bus Rapid Transit (BRT) There would be a significant effect on local businesses with the removal of on-street parking, elimination of bulbouts on Fair Oaks Ave
  5. 5. Light Rail Transit (LRT)
  6. 6. Light Rail Transit (LRT) The City would have 2 stations one near Huntington Drive/Fremont Ave and the other Mission St/Fair Oaks Ave. The entire segment would be underground. Construction impacts and business interruption and/or relocation
  7. 7. Light Rail Transit (LRT)
  8. 8. TDM/TSM In the City: • There would be 5 intersection improvements • 2 Local Street Improvements • The Fair Oaks/SR-110 Improvement Project (Hook and off Ramp) is included
  9. 9. TDM/TSM “Consists of strategies and improvements to increase efficiency and capacity for all modes in the transportation system with lower capital cost investments and/or lower potential impacts.” Transportation Demand Management/ Transportation System Management Recent addition of “reversible lanes,” between Grevalia and Monterey, would have a significant impact to South Pasadena. The center median would be removed and converted into a travel lane whereby depending on traffic patters would function as a 3rd travel lane…
  10. 10. Freeway Tunnel (F-7x) - Vibrations (digging/boring) - Emergency Response - Air Quality - Property Values - Historic Inventory - 3p –Public – Private Partnership - Tolls - Trucks - Tunnel/Toll Avoiding Traffic
  11. 11. Freeway Tunnel (F-7x)
  12. 12. Bundle/multi-mode •Tunnel/BRT •Tunnel/LRT •Tunnel/TDM/TSM •BRT/LRT/TDM/TSM All of these bundles will be further evaluated
  13. 13. Next Steps • City Resolution • Working Groups • Continue to work with other cities • Continue to monitor and participate in the SR-710 Study

×