Your SlideShare is downloading. ×
0
Schedule line catgiry
Schedule line catgiry
Schedule line catgiry
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Schedule line catgiry

119

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
119
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. SCHEDULE LINE CATGIRY•THE DATA AT SCHEDULE LINE LEVEL IN A SALESDOCUMENT IS CONTROLLED BY SCHEDULE LINECATOGIRY•DEPENDING ON THE REQUIREMENT WE NEED TODEFINE DIFFERENT SCHEDULE LINE CATOGIRYSWITH THE CORRESPONDING FUNCTONALITIES TOBE USED IN THE RESPECTIVE SALES DOCUMENT•DEFINE SCHEDULE LINE CATOGIRIES
  • 2. DEFINING SCHEDULE LINE CATGIRIES SPRO SALES DOCUMENTSALES AND DISTRIBUTION SCHEDULE LINES SALES DEFINE SCHEDULE LINE CATOGIRIES
  • 3. DEFINING SCHEDULE LINE CATGIRIES• EX AT INQUIRY SCHEDULE LINE BN QUATATION SCHEDULE LINE CP ORDER SCHEDULE LINE CV ORDER SCHEDULE LINE CN ORDER SCHEDULE LINE DN RETURN SCHEDULE LINE

×