Design, Testing, and Use of an Innovative Prestress Concrete Pile Joint
Long Pile Handling  ,[object Object],[object Object],[object Object]
Driving Long Piles ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Up to 65 ft-long pile segments: (4 Fork-truck and spreader for unloading & staging Spliced-Pile Alternative
Spliced-Pile Alternative ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Emeca Pile Joint  Male Stud Female Socket Locking pin  hole Cover Plate Reinforcing
Emeca Pile Joint  Automated Robotic Fabrication
Tension  Limit States 3. & 7.:   Weld rupture at reinforcing/locking mechanism interface Note:  Welds are designed to develop reinforcing Butt-Joint at female socket Lap-Joint at Male Stud
Structural Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Compression  Compression is transferred  directly through bearing of faying  surfaces Assembly Diagram of Emeca Joint
Shear  ,[object Object],[object Object],Shear failure plane
Tension  Tensile Limit States 1.&9.  Transfer tensile force from  prestress to mild reinforcing  2.&8.  Tensile yield of mild reinforcing 3.  Weld rupture at female socket  4.  Tensile rupture of female socket 5.  Shear rupture of pin 6.  Tensile rupture male stud 7.  Weld rupture at male stud
Tension  Limit States 1 & 2: CASE 2:  L embed.  <   L d  for strand: * Bond Limit (Strand) OR Mild Reinforcing Steel Limit * Ref: ACI 12.9.1  CASE 1:  L embed.  ≥   L d  for strand: Rupture Limit (Strand) OR Mild Reinforcing Steel Limit
Tension  In General: ,[object Object],[object Object],[object Object],[object Object]
Auxiliary Reinforcing Auxiliary Reinforcing Auxiliary Reinforcing
Tension  Summary: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Bending Analysis at Joint Critical Sections: S2-Prestress Section S1-Section at Joint
Bending Analysis at Joint S1- Reinforced Section (12-in. pile)
Bending Analysis at Joint S1- Reinforced Section (12-in. pile) M n  = 41.7 ft-k
Bending Analysis at Joint max. stress in strand = f ps  = 173 ksi  S2- Prestress Section (12-in. pile)
Bending Analysis at Joint S2- Prestress Section (12-in. pile) PCI  Figure 4.12.4 (p. 4-122) 30 in. 173 ksi
Bending Analysis at Joint f ps  = 173 ksi M n  = 33.5 ft-k S2- Prestress Section (12-in. pile)
Analysis at Joint  Summary: Unreduced Capacities of Pile at Joint 12-in.  Pile Splice 14-in.  Pile Splice Limit Tension - T n 95.6 kips 150 kips Yield of Mild Reinforcing Bending  - M n 33.5 ft-kips 55.2 ft-kips Strand Slip reinforcing added -  M n 41.5 ft-kips 73.7 ft-kips Yield of Mild Reinforcing Shear - V n 19.0 kips 26.4 kips Shear Capacity of Pile
Interaction of 12-inch Piles vs. Emeca Joint Cross Section
Interaction of 14-inch Piles vs. Emeca Joint Cross Section
Bending Tests – University of South Carolina Test Set-up: Recorded Data: - Load - Displacement at ¼ points - Rotation at Joint Loading Protocol: - Quasi-static loading
Bending Tests – University of South Carolina Test Specimens (12 Total): I. Splice only (6) 28-ft. long piles, spliced at midpoint  (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) II. Splices with “Auxiliary Reinforcing” (6) 28-ft. long piles, spliced at midpoint  (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) Auxiliary reinforcing – (4) #5’s x 60”
Bending Tests Results: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Bending Tests  Moment Strength Results  (ft-kips): M n ′  –Calculated theoretical moment using tested material strength: F y  = 73 ksi  f c ′ = 7,000 psi Theoretical  Test Results Mean Low M n M n ′ Mean Low M n ′ M n ′ Splice Only 12 in. 37 47 53.6 52.7 114% 111% 14 in. 61 79 85.4 77 108% 97% Auxiliary Reinforcing Added 12 in. 37 53 63 59.7 119% 112% 14 in. 67 93 99.3 90.5 107% 97%
Recommendations for Use ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],General:
[object Object],[object Object],[object Object],[object Object],Emeca Pile Joint  PDCA  National Project of the Year, 2008
Casting Splices ,[object Object],[object Object],[object Object],[object Object],[object Object]
Casting Splices ,[object Object],[object Object],[object Object]
Casting Splices ,[object Object],[object Object],[object Object]
Casting Splices ,[object Object],[object Object],[object Object]
Installation  ,[object Object],[object Object],[object Object]
Installation  ,[object Object],[object Object],[object Object]
Projects  Owner:  Vitol Oil Company Contractor:  Sun Marine Project Status: Complete Emeca Product:  12-in. Pile Joints Notes:  6300, 100-ft-long piles installed Vitol Oil Tank Farm, Seaport Canaveral, FL
Projects  Owner:  Northrup Grumman Contractor:  Ford Pile Foundations Project Status: Active Emeca Product:  12-in. Pile Joints Notes:  Piles and splices designed to resist hydrostatic tension Northrup Grumman Naval Shipyard - Dry Dock Facility, Newport News, VA
Projects  Contractor:  Junttapojat Oy Emeca Product:  14-in. Pile Joints Notes:  -  8000 Emeca Pile Joints used on project -  656,000 total pile length  -  Up to 105 foot long piles driven in 3 sections -  Battered piles driven at 4V:1H Vousaari Harbor Project for the Port of Helsinki, Helsinki, Finland
Projects  Contractor:  Aarsleff Piling Status:  Complete Emeca Product:  16-in. Pile Joints Notes:  50 wind turbine foundations constructed  using 85-ft-long,16-in. spliced piles Wind Farm, Ransonmoor, Finland
Projects  Contractor:  Kiewit Construction Project Status:  Active Emeca Product:  14-in. Rock Points customized for 30-in.-square concrete piles  Notes:  Piles driven through concrete mooring anchors at approximately 30-ft. Brayton Point Cooling Tower, Summerset, MA
Projects  Anacostia Naval Station Drainage Phase IV, Washington, DC Owner: NAVFAC Project Status:  Completed August 2008 General Contractor:  Corinthian Contractors Pile Contractor:  Coastal Pile Driving, Inc. Property Manager:  Whiting-Turner Contracting Product:  12-in. Pile Joints Notes:  Up to 83-ft-long spliced piles

More Related Content

What's hot

Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening Yash Patel
 
Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Digvijaysinh Gohil
 
Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODyasir Khan
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system9033124117
 
Tension members
Tension membersTension members
Tension memberssky hawk
 
Structural engineering basics
Structural engineering basicsStructural engineering basics
Structural engineering basicsRam N
 
Calculation of dead load
Calculation of dead loadCalculation of dead load
Calculation of dead loadRidhdhi Gandhi
 
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...Hossam Shafiq II
 
Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Vikas Kumar Kushwaha
 
Buckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structuresBuckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structuresMahdi Damghani
 
Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )Digvijaysinh Gohil
 
Design of short circular axially loaded column
Design of short circular axially loaded columnDesign of short circular axially loaded column
Design of short circular axially loaded columngecnads
 
design of knuckle joint may 2020
design of knuckle joint may 2020design of knuckle joint may 2020
design of knuckle joint may 2020Gaurav Mistry
 
DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020Gaurav Mistry
 

What's hot (20)

Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Singly R.C beam
Singly R.C beamSingly R.C beam
Singly R.C beam
 
Flanged beams analysis - type 1
Flanged beams   analysis - type 1Flanged beams   analysis - type 1
Flanged beams analysis - type 1
 
Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )
 
Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHOD
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system
 
Cotter joint
Cotter jointCotter joint
Cotter joint
 
Tension members
Tension membersTension members
Tension members
 
Structural engineering basics
Structural engineering basicsStructural engineering basics
Structural engineering basics
 
Calculation of dead load
Calculation of dead loadCalculation of dead load
Calculation of dead load
 
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
 
Connections
Connections Connections
Connections
 
Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)
 
Buckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structuresBuckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structures
 
Compression member
Compression memberCompression member
Compression member
 
Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )
 
Design of short circular axially loaded column
Design of short circular axially loaded columnDesign of short circular axially loaded column
Design of short circular axially loaded column
 
Beam buckling
Beam bucklingBeam buckling
Beam buckling
 
design of knuckle joint may 2020
design of knuckle joint may 2020design of knuckle joint may 2020
design of knuckle joint may 2020
 
DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020
 

Similar to Emeca SPE-USA Pile Joint Product

IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET Journal
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)RAHMATULLAH MERCY FEAT
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET Journal
 
Multi-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener DesignMulti-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener DesignMark Brooks
 
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOADBriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOADmichael mabrouk
 
Design of Simple Machine Parts
Design of Simple Machine PartsDesign of Simple Machine Parts
Design of Simple Machine PartsMahesh Shinde
 
Design mini-project for TY mechanical students
Design mini-project for TY mechanical studentsDesign mini-project for TY mechanical students
Design mini-project for TY mechanical studentsRavindra Shinde
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
 
Deaton aci-fall2010
Deaton aci-fall2010Deaton aci-fall2010
Deaton aci-fall2010bendeaton
 
UPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical InvestigationsUPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical InvestigationsPetrus Cristian
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorIRJET Journal
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog Latifs Chile
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog Latifs Chile
 
Coupling and flange coupling and its design
Coupling and flange coupling and its designCoupling and flange coupling and its design
Coupling and flange coupling and its designRupesh Kumar
 
Analysis of Lifting Machine
Analysis of Lifting MachineAnalysis of Lifting Machine
Analysis of Lifting MachineAhsen Parwez
 

Similar to Emeca SPE-USA Pile Joint Product (20)

IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
 
Multi-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener DesignMulti-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener Design
 
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOADBriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
 
Design of Simple Machine Parts
Design of Simple Machine PartsDesign of Simple Machine Parts
Design of Simple Machine Parts
 
Design mini-project for TY mechanical students
Design mini-project for TY mechanical studentsDesign mini-project for TY mechanical students
Design mini-project for TY mechanical students
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
Deaton aci-fall2010
Deaton aci-fall2010Deaton aci-fall2010
Deaton aci-fall2010
 
UPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical InvestigationsUPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical Investigations
 
Screw piles
Screw pilesScrew piles
Screw piles
 
Caeser II manual
Caeser II manualCaeser II manual
Caeser II manual
 
Engineering and Design Webinar - September
Engineering and Design Webinar - SeptemberEngineering and Design Webinar - September
Engineering and Design Webinar - September
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure Accumulator
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog
 
Prestressed pipes,tanks,poles
Prestressed pipes,tanks,polesPrestressed pipes,tanks,poles
Prestressed pipes,tanks,poles
 
Coupling and flange coupling and its design
Coupling and flange coupling and its designCoupling and flange coupling and its design
Coupling and flange coupling and its design
 
Analysis of Lifting Machine
Analysis of Lifting MachineAnalysis of Lifting Machine
Analysis of Lifting Machine
 

Recently uploaded

Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Nikki Chapple
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfAarwolf Industries LLC
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxAna-Maria Mihalceanu
 
Accelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with PlatformlessAccelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with PlatformlessWSO2
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkPixlogix Infotech
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024TopCSSGallery
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesManik S Magar
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 

Recently uploaded (20)

Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdf
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance Toolbox
 
Accelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with PlatformlessAccelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with Platformless
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App Framework
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 

Emeca SPE-USA Pile Joint Product

  • 1. Design, Testing, and Use of an Innovative Prestress Concrete Pile Joint
  • 2.
  • 3.
  • 4. Up to 65 ft-long pile segments: (4 Fork-truck and spreader for unloading & staging Spliced-Pile Alternative
  • 5.
  • 6. Emeca Pile Joint Male Stud Female Socket Locking pin hole Cover Plate Reinforcing
  • 7. Emeca Pile Joint Automated Robotic Fabrication
  • 8. Tension Limit States 3. & 7.: Weld rupture at reinforcing/locking mechanism interface Note: Welds are designed to develop reinforcing Butt-Joint at female socket Lap-Joint at Male Stud
  • 9.
  • 10. Compression Compression is transferred directly through bearing of faying surfaces Assembly Diagram of Emeca Joint
  • 11.
  • 12. Tension Tensile Limit States 1.&9. Transfer tensile force from prestress to mild reinforcing 2.&8. Tensile yield of mild reinforcing 3. Weld rupture at female socket 4. Tensile rupture of female socket 5. Shear rupture of pin 6. Tensile rupture male stud 7. Weld rupture at male stud
  • 13. Tension Limit States 1 & 2: CASE 2: L embed. < L d for strand: * Bond Limit (Strand) OR Mild Reinforcing Steel Limit * Ref: ACI 12.9.1 CASE 1: L embed. ≥ L d for strand: Rupture Limit (Strand) OR Mild Reinforcing Steel Limit
  • 14.
  • 15. Auxiliary Reinforcing Auxiliary Reinforcing Auxiliary Reinforcing
  • 16.
  • 17. Bending Analysis at Joint Critical Sections: S2-Prestress Section S1-Section at Joint
  • 18. Bending Analysis at Joint S1- Reinforced Section (12-in. pile)
  • 19. Bending Analysis at Joint S1- Reinforced Section (12-in. pile) M n = 41.7 ft-k
  • 20. Bending Analysis at Joint max. stress in strand = f ps = 173 ksi S2- Prestress Section (12-in. pile)
  • 21. Bending Analysis at Joint S2- Prestress Section (12-in. pile) PCI Figure 4.12.4 (p. 4-122) 30 in. 173 ksi
  • 22. Bending Analysis at Joint f ps = 173 ksi M n = 33.5 ft-k S2- Prestress Section (12-in. pile)
  • 23. Analysis at Joint Summary: Unreduced Capacities of Pile at Joint 12-in. Pile Splice 14-in. Pile Splice Limit Tension - T n 95.6 kips 150 kips Yield of Mild Reinforcing Bending - M n 33.5 ft-kips 55.2 ft-kips Strand Slip reinforcing added - M n 41.5 ft-kips 73.7 ft-kips Yield of Mild Reinforcing Shear - V n 19.0 kips 26.4 kips Shear Capacity of Pile
  • 24. Interaction of 12-inch Piles vs. Emeca Joint Cross Section
  • 25. Interaction of 14-inch Piles vs. Emeca Joint Cross Section
  • 26. Bending Tests – University of South Carolina Test Set-up: Recorded Data: - Load - Displacement at ¼ points - Rotation at Joint Loading Protocol: - Quasi-static loading
  • 27. Bending Tests – University of South Carolina Test Specimens (12 Total): I. Splice only (6) 28-ft. long piles, spliced at midpoint (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) II. Splices with “Auxiliary Reinforcing” (6) 28-ft. long piles, spliced at midpoint (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) Auxiliary reinforcing – (4) #5’s x 60”
  • 28.
  • 29. Bending Tests Moment Strength Results (ft-kips): M n ′ –Calculated theoretical moment using tested material strength: F y = 73 ksi f c ′ = 7,000 psi Theoretical Test Results Mean Low M n M n ′ Mean Low M n ′ M n ′ Splice Only 12 in. 37 47 53.6 52.7 114% 111% 14 in. 61 79 85.4 77 108% 97% Auxiliary Reinforcing Added 12 in. 37 53 63 59.7 119% 112% 14 in. 67 93 99.3 90.5 107% 97%
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. Projects Owner: Vitol Oil Company Contractor: Sun Marine Project Status: Complete Emeca Product: 12-in. Pile Joints Notes: 6300, 100-ft-long piles installed Vitol Oil Tank Farm, Seaport Canaveral, FL
  • 39. Projects Owner: Northrup Grumman Contractor: Ford Pile Foundations Project Status: Active Emeca Product: 12-in. Pile Joints Notes: Piles and splices designed to resist hydrostatic tension Northrup Grumman Naval Shipyard - Dry Dock Facility, Newport News, VA
  • 40. Projects Contractor: Junttapojat Oy Emeca Product: 14-in. Pile Joints Notes: - 8000 Emeca Pile Joints used on project - 656,000 total pile length - Up to 105 foot long piles driven in 3 sections - Battered piles driven at 4V:1H Vousaari Harbor Project for the Port of Helsinki, Helsinki, Finland
  • 41. Projects Contractor: Aarsleff Piling Status: Complete Emeca Product: 16-in. Pile Joints Notes: 50 wind turbine foundations constructed using 85-ft-long,16-in. spliced piles Wind Farm, Ransonmoor, Finland
  • 42. Projects Contractor: Kiewit Construction Project Status: Active Emeca Product: 14-in. Rock Points customized for 30-in.-square concrete piles Notes: Piles driven through concrete mooring anchors at approximately 30-ft. Brayton Point Cooling Tower, Summerset, MA
  • 43. Projects Anacostia Naval Station Drainage Phase IV, Washington, DC Owner: NAVFAC Project Status: Completed August 2008 General Contractor: Corinthian Contractors Pile Contractor: Coastal Pile Driving, Inc. Property Manager: Whiting-Turner Contracting Product: 12-in. Pile Joints Notes: Up to 83-ft-long spliced piles