SlideShare a Scribd company logo
1 of 2
Download to read offline
06-Feb-2012




                                       Session 6

                                Project management system




Group work assignment                                        The triple constraints
• Design a web based project management system
• Create processes, templates and describe the
  functionality of the system.                                                                                         Time
• Use diagrams, flow charts and drawings rather than
  text whenever possible
• Your design should be as complete as possible
• Think with the head of your clients – what’s in it for
  them?                                                                                         Scope                                          Cost

• Present to the group
                                                            Project Plan, measurements, reporting and progress
                                                             4                                   Centre for the Promotion of Imports from developing
                                                                                                 countries




Processes without brain create;                              Project control and oversight
                                                             •   CRM
      - un-efficiencies                                      •
                                                             •
                                                                 Integrated communication interface, project BoK, WIKI
                                                                 Status, progress and (re)estimation
      - bureaucracy                                          •
                                                             •
                                                                 Deliverables and version management
                                                                 Timesheets and time management
      - resistance                                           •
                                                             •
                                                                 Issue tracking and resolution
                                                                 Risk management
                                                             •   Change management
      - chaos                                                •   Scope and requirements management
                                                             •   Resource management
                                                             •   (Cost management)
                                                             •   Contract and SLA management
                                                             •   Lessons learnt




                                                                                                                                                       1
06-Feb-2012




Why did we do this assignment?

• Group work is essential
• Clear, simple, fast, professional presentation of ideas
• Charts, pictures, drawings are easier to understand and
  remembered of
• Questions and proper questioning are also important
• Use various techniques, such as prioritization,
  brainstorming, mindmaps, reasoning, etc.




                                                                     2

More Related Content

What's hot

Horn thomas
Horn thomasHorn thomas
Horn thomasNASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
Terry.conroy
Terry.conroyTerry.conroy
Terry.conroyNASAPMC
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution SelectionLeanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahaniNASAPMC
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
 
CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...
CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...
CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...QAI
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beeneNASAPMC
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
Richard.laws
Richard.lawsRichard.laws
Richard.lawsNASAPMC
 
Sally godfreyheatherrarick
Sally godfreyheatherrarickSally godfreyheatherrarick
Sally godfreyheatherrarickNASAPMC
 
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...QAI
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paulNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management Ahmad Maharma, PMP,RMP
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateLeanleaders.org
 

What's hot (20)

Horn thomas
Horn thomasHorn thomas
Horn thomas
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Terry.conroy
Terry.conroyTerry.conroy
Terry.conroy
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...
CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...
CMMI High Maturity Best Practices HMBP 2010: Demystifying High Maturity Imple...
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
Richard.laws
Richard.lawsRichard.laws
Richard.laws
 
Sally godfreyheatherrarick
Sally godfreyheatherrarickSally godfreyheatherrarick
Sally godfreyheatherrarick
 
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management
 
Killing the Myth: Agile & CMMI
Killing the Myth: Agile & CMMIKilling the Myth: Agile & CMMI
Killing the Myth: Agile & CMMI
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE Tollgate
 

Viewers also liked

Unidad II - Seminario
Unidad II - SeminarioUnidad II - Seminario
Unidad II - SeminarioGermaina
 
Instalación, agenda del evento y expectativas de los participantes
Instalación, agenda del evento y expectativas de los participantesInstalación, agenda del evento y expectativas de los participantes
Instalación, agenda del evento y expectativas de los participantesProColombia
 
Planificación del proyecto estimación
Planificación del proyecto   estimaciónPlanificación del proyecto   estimación
Planificación del proyecto estimaciónProColombia
 
Planificación del proyecto plan de comunicación
Planificación del proyecto   plan de comunicaciónPlanificación del proyecto   plan de comunicación
Planificación del proyecto plan de comunicaciónProColombia
 
Planificación del proyecto estimación - precio
Planificación del proyecto   estimación - precioPlanificación del proyecto   estimación - precio
Planificación del proyecto estimación - precioProColombia
 
Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1
Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1
Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1tutor03770
 
Software de aplicación
Software de aplicaciónSoftware de aplicación
Software de aplicacióneduardo lopez
 

Viewers also liked (10)

Unidad II - Seminario
Unidad II - SeminarioUnidad II - Seminario
Unidad II - Seminario
 
Instalación, agenda del evento y expectativas de los participantes
Instalación, agenda del evento y expectativas de los participantesInstalación, agenda del evento y expectativas de los participantes
Instalación, agenda del evento y expectativas de los participantes
 
Planificación del proyecto estimación
Planificación del proyecto   estimaciónPlanificación del proyecto   estimación
Planificación del proyecto estimación
 
Planificación del proyecto plan de comunicación
Planificación del proyecto   plan de comunicaciónPlanificación del proyecto   plan de comunicación
Planificación del proyecto plan de comunicación
 
Planificación del proyecto estimación - precio
Planificación del proyecto   estimación - precioPlanificación del proyecto   estimación - precio
Planificación del proyecto estimación - precio
 
Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1
Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1
Introducción al Seminario de Proyectos Empresariales de Inversión_Semana1
 
Software De Aplicacion
Software De AplicacionSoftware De Aplicacion
Software De Aplicacion
 
Sofware Aplicacion
Sofware AplicacionSofware Aplicacion
Sofware Aplicacion
 
Software de aplicación
Software de aplicaciónSoftware de aplicación
Software de aplicación
 
Fundamentos de ingenieria del software (2)
Fundamentos de ingenieria del software (2)Fundamentos de ingenieria del software (2)
Fundamentos de ingenieria del software (2)
 

Similar to Simulación del proyecto

Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groupsvanessahartsfield
 
Project management
Project managementProject management
Project managementSameer Kumar
 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTAlpha Sirius
 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTAlpha Sirius
 
Service catalogue
Service catalogueService catalogue
Service catalogueAlex Rea
 
ERP Implementation cycle
ERP Implementation cycleERP Implementation cycle
ERP Implementation cycleMantavya Gajjar
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?Mark Roman
 
Implementing Enterprise PPM for Multi-Maturity Organizations
Implementing Enterprise PPM for Multi-Maturity Organizations Implementing Enterprise PPM for Multi-Maturity Organizations
Implementing Enterprise PPM for Multi-Maturity Organizations EPM Live
 
Bpr Process Modeling
Bpr Process ModelingBpr Process Modeling
Bpr Process Modelingrlynes
 
Warren Marquis Value Summary
Warren Marquis Value SummaryWarren Marquis Value Summary
Warren Marquis Value Summarywbm1701
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capabilitysmcasas
 
Career Pyramid - Charles Fain
Career Pyramid - Charles FainCareer Pyramid - Charles Fain
Career Pyramid - Charles FainCharles D Fain
 
PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...
PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...
PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...EPM Live
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidyNASAPMC
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
Lean Management Excellence Brochure
Lean Management Excellence BrochureLean Management Excellence Brochure
Lean Management Excellence BrochurePartner
 

Similar to Simulación del proyecto (20)

Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
 
Project management
Project managementProject management
Project management
 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
 
Service catalogue
Service catalogueService catalogue
Service catalogue
 
Service catalogue
Service catalogueService catalogue
Service catalogue
 
ERP Implementation cycle
ERP Implementation cycleERP Implementation cycle
ERP Implementation cycle
 
Project management office value
Project management office valueProject management office value
Project management office value
 
IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?
 
Implementing Enterprise PPM for Multi-Maturity Organizations
Implementing Enterprise PPM for Multi-Maturity Organizations Implementing Enterprise PPM for Multi-Maturity Organizations
Implementing Enterprise PPM for Multi-Maturity Organizations
 
Bpr Process Modeling
Bpr Process ModelingBpr Process Modeling
Bpr Process Modeling
 
Warren Marquis Value Summary
Warren Marquis Value SummaryWarren Marquis Value Summary
Warren Marquis Value Summary
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capability
 
Career Pyramid - Charles Fain
Career Pyramid - Charles FainCareer Pyramid - Charles Fain
Career Pyramid - Charles Fain
 
PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...
PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...
PPM Challenge #4: Improving PPM Maturity – 2012 PPM Challenge and Opportunity...
 
PhD Disputation
PhD DisputationPhD Disputation
PhD Disputation
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
Lean Management Excellence Brochure
Lean Management Excellence BrochureLean Management Excellence Brochure
Lean Management Excellence Brochure
 

More from ProColombia

8 Inversiones para el desarrollo sostenible (1).pdf
8 Inversiones para el desarrollo sostenible (1).pdf8 Inversiones para el desarrollo sostenible (1).pdf
8 Inversiones para el desarrollo sostenible (1).pdfProColombia
 
7 Iniciativas Innovadoras (1).pdf
7 Iniciativas Innovadoras (1).pdf7 Iniciativas Innovadoras (1).pdf
7 Iniciativas Innovadoras (1).pdfProColombia
 
6 Territorios como destino de inversión (1).pdf
6 Territorios como destino de inversión (1).pdf6 Territorios como destino de inversión (1).pdf
6 Territorios como destino de inversión (1).pdfProColombia
 
5 Estrategia de Procolombia (3).pdf
5 Estrategia de Procolombia (3).pdf5 Estrategia de Procolombia (3).pdf
5 Estrategia de Procolombia (3).pdfProColombia
 
4 Tendencias Globales (3).pdf
4 Tendencias Globales (3).pdf4 Tendencias Globales (3).pdf
4 Tendencias Globales (3).pdfProColombia
 
3 Política de Reindustrialización (2).pdf
3 Política de Reindustrialización (2).pdf3 Política de Reindustrialización (2).pdf
3 Política de Reindustrialización (2).pdfProColombia
 
2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdf2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdfProColombia
 
2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdf2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdfProColombia
 
boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...
boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...
boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...ProColombia
 
Bodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdfBodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdfProColombia
 
perfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdfperfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdfProColombia
 
perfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdfperfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdfProColombia
 
El negocio de las bodas destino .pdf
El negocio de las bodas destino .pdfEl negocio de las bodas destino .pdf
El negocio de las bodas destino .pdfProColombia
 
Congreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdfCongreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdfProColombia
 
Congreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdfCongreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdfProColombia
 
Bodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdfBodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdfProColombia
 
La cadena de valor de las bodas de destino y el impacto social en las comunid...
La cadena de valor de las bodas de destino y el impacto social en las comunid...La cadena de valor de las bodas de destino y el impacto social en las comunid...
La cadena de valor de las bodas de destino y el impacto social en las comunid...ProColombia
 
Diseño de la experiencia en una boda destino.pdf
Diseño de la experiencia en una boda destino.pdfDiseño de la experiencia en una boda destino.pdf
Diseño de la experiencia en una boda destino.pdfProColombia
 

More from ProColombia (20)

8 Inversiones para el desarrollo sostenible (1).pdf
8 Inversiones para el desarrollo sostenible (1).pdf8 Inversiones para el desarrollo sostenible (1).pdf
8 Inversiones para el desarrollo sostenible (1).pdf
 
7 Iniciativas Innovadoras (1).pdf
7 Iniciativas Innovadoras (1).pdf7 Iniciativas Innovadoras (1).pdf
7 Iniciativas Innovadoras (1).pdf
 
6 Territorios como destino de inversión (1).pdf
6 Territorios como destino de inversión (1).pdf6 Territorios como destino de inversión (1).pdf
6 Territorios como destino de inversión (1).pdf
 
5 Estrategia de Procolombia (3).pdf
5 Estrategia de Procolombia (3).pdf5 Estrategia de Procolombia (3).pdf
5 Estrategia de Procolombia (3).pdf
 
4 Tendencias Globales (3).pdf
4 Tendencias Globales (3).pdf4 Tendencias Globales (3).pdf
4 Tendencias Globales (3).pdf
 
3 Política de Reindustrialización (2).pdf
3 Política de Reindustrialización (2).pdf3 Política de Reindustrialización (2).pdf
3 Política de Reindustrialización (2).pdf
 
2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdf2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdf
 
2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdf2 Plan Nacional de Desarrollo (2).pdf
2 Plan Nacional de Desarrollo (2).pdf
 
boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...
boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...
boletin_de_actualidad_de_procolombia_en_materia_de_inversion_para_todas_las_r...
 
Bodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdfBodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdf
 
perfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdfperfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdf
 
perfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdfperfilcannabis2023australia-230602005622-b48a4aaa.pdf
perfilcannabis2023australia-230602005622-b48a4aaa.pdf
 
LACADE~1.PDF
LACADE~1.PDFLACADE~1.PDF
LACADE~1.PDF
 
El negocio de las bodas destino .pdf
El negocio de las bodas destino .pdfEl negocio de las bodas destino .pdf
El negocio de las bodas destino .pdf
 
Congreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdfCongreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdf
 
DEQUMA~1.PDF
DEQUMA~1.PDFDEQUMA~1.PDF
DEQUMA~1.PDF
 
Congreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdfCongreso de Bodas LAT 2023.pdf
Congreso de Bodas LAT 2023.pdf
 
Bodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdfBodas Multiculturales y la oportunidad para Colombia.pdf
Bodas Multiculturales y la oportunidad para Colombia.pdf
 
La cadena de valor de las bodas de destino y el impacto social en las comunid...
La cadena de valor de las bodas de destino y el impacto social en las comunid...La cadena de valor de las bodas de destino y el impacto social en las comunid...
La cadena de valor de las bodas de destino y el impacto social en las comunid...
 
Diseño de la experiencia en una boda destino.pdf
Diseño de la experiencia en una boda destino.pdfDiseño de la experiencia en una boda destino.pdf
Diseño de la experiencia en una boda destino.pdf
 

Simulación del proyecto

  • 1. 06-Feb-2012 Session 6 Project management system Group work assignment The triple constraints • Design a web based project management system • Create processes, templates and describe the functionality of the system. Time • Use diagrams, flow charts and drawings rather than text whenever possible • Your design should be as complete as possible • Think with the head of your clients – what’s in it for them? Scope Cost • Present to the group Project Plan, measurements, reporting and progress 4 Centre for the Promotion of Imports from developing countries Processes without brain create; Project control and oversight • CRM - un-efficiencies • • Integrated communication interface, project BoK, WIKI Status, progress and (re)estimation - bureaucracy • • Deliverables and version management Timesheets and time management - resistance • • Issue tracking and resolution Risk management • Change management - chaos • Scope and requirements management • Resource management • (Cost management) • Contract and SLA management • Lessons learnt 1
  • 2. 06-Feb-2012 Why did we do this assignment? • Group work is essential • Clear, simple, fast, professional presentation of ideas • Charts, pictures, drawings are easier to understand and remembered of • Questions and proper questioning are also important • Use various techniques, such as prioritization, brainstorming, mindmaps, reasoning, etc. 2