Pan Gulf Products                    MODEL-K FIRE PUMP TEST METER                                               - RATING 5...
OPERATING INSTRUCTIONS FOR GERAND FIRE PUMP TEST METER1. Close system OSY Valve "A".2. Open By-Pass valve and "B" Butterfl...
For More Detail Please CONTACT US                   Saudi Arabia                    Al KhobarPhone:     +966 (0)3 897 2919...
Upcoming SlideShare
Loading in...5
×

Gerand Flow Meter

1,765

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,765
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Gerand Flow Meter

  1. 1. Pan Gulf Products MODEL-K FIRE PUMP TEST METER - RATING 500 PSI - (BUTT WELD, GROOVED ENDS & 300 # FLANGED) - RATING 275 PSI - (FOR 150 # FLANGED UNITS ONLY) A calibrated venturi and attached GPM meter installed on the discharge of a fire pump to accurately determine pump performance. 4-1/2" dial meter is shipped for mounting on venturi bracket. If meter is to be remote mounted, consult factory on special hose lengths. Dual LPM/GPM Scales Available. MODEL-M FIRE PUMP TEST METER - RATING 175 PSI - A calibrated venturi and attached GPM meter installed on the discharge of a fire pump to accurately determine pump performance. 6" dial meter is shipped for mounting on venturi bracket. If meter is to be remote mounted, consult factory on special hose lengths. Dual LPM/GPM Scales Available. MODEL-M/MODEL-K FIRE PUMP TEST METER INSTALLATION INSTRUCTIONS
  2. 2. OPERATING INSTRUCTIONS FOR GERAND FIRE PUMP TEST METER1. Close system OSY Valve "A".2. Open By-Pass valve and "B" Butterfly Throttle Valve.3. Purge meter located on venturi as follows: • Open station shut-off valves (below meter) and vent valves (above meter). • When a steady stream of water is passing through each plastic hose, meter is purged of air. Close vent valves after air purging.4. Start fire pump and read meter in GPM.5. Refer to pump GPM requirement and adjust Throttle Valve for this requirement. 6. After test, open OSY Valve "A" and close By-Pass and "B" Valves.
  3. 3. For More Detail Please CONTACT US Saudi Arabia Al KhobarPhone: +966 (0)3 897 2919/20/27Fax: +966 (0)3 897 5654E-mail: sales@pangulfproducts.comWebsite: http://www.pangulfproducts.com

×