Presentation  On INDIAN   RAILWAYS
Route Kms. Broad Gauge  45099 Metre Gauge  14776 Narrow Gauge  3265 Total  63140 IR SYSTEM MAP  CHENNAI KOLKATA MUMBAI NEW...
Overview of Indian Railways.... <ul><li>  </li></ul><ul><li>Route Kilometres :    63,140  </li></ul><ul><li>Track Kilometr...
.... Overview of Indian Railways <ul><li>No. of Stations  (as on 1.4.2002 ) 6856 </li></ul><ul><li>No. of Staff  (as on 1....
Performance of Indian Railways  Passenger & Freight Business
System of maintenance Workshops (50 +) Overhaul Locomotive sheds(30+) Routine maintenance Coaching depots(75+) Passenger c...
Maintenance schedules In workshops Periodic Over Haul(POH) Dsl / Elec locos once in 6 yrs. Coaches 12, 18, 24 mnths Wagons...
Maintenance schedules In Sheds – routine maintenance Trip schedule – every trip 10, 30, 90, 180, 360 For Dsl / Elec locos....
Upcoming SlideShare
Loading in...5
×

Ind Rly

4,385

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
4,385
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
42
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ind Rly

  1. 1. Presentation On INDIAN RAILWAYS
  2. 2. Route Kms. Broad Gauge 45099 Metre Gauge 14776 Narrow Gauge 3265 Total 63140 IR SYSTEM MAP CHENNAI KOLKATA MUMBAI NEW DELHI
  3. 3. Overview of Indian Railways.... <ul><li> </li></ul><ul><li>Route Kilometres : 63,140 </li></ul><ul><li>Track Kilometres : 109,227 </li></ul><ul><li>Electrified Route Kms. : 16,001 </li></ul><ul><li>Locomotives : 7,739 </li></ul><ul><ul><ul><li>Diesel : 4,815 </li></ul></ul></ul><ul><ul><ul><li>Electric : 2,871 </li></ul></ul></ul><ul><ul><ul><li>Steam : 53 </li></ul></ul></ul><ul><li>Wagons (Vehicle Units) : 216,717 </li></ul><ul><li>Coaches (Vehicle Units) : 44,063 </li></ul>
  4. 4. .... Overview of Indian Railways <ul><li>No. of Stations (as on 1.4.2002 ) 6856 </li></ul><ul><li>No. of Staff (as on 1.4.2002 ) 15,10,759 </li></ul><ul><li>IR Operated (in 2001-02) 8702 passenger trains daily </li></ul><ul><li>IR Carried (in 2001-02) 492.3 million tonnes of freight traffic & 5189 </li></ul><ul><li>million passengers </li></ul>
  5. 5. Performance of Indian Railways Passenger & Freight Business
  6. 6. System of maintenance Workshops (50 +) Overhaul Locomotive sheds(30+) Routine maintenance Coaching depots(75+) Passenger carrying coaches Wagon Depots(70+) Freight wagons EMU Car sheds(15/20) Elec Multiple Units Production Units(6) Dsl, Elec., coaches
  7. 7. Maintenance schedules In workshops Periodic Over Haul(POH) Dsl / Elec locos once in 6 yrs. Coaches 12, 18, 24 mnths Wagons 4.5/6 yrs Elec Multiple Units 18mnths, 24 mnths
  8. 8. Maintenance schedules In Sheds – routine maintenance Trip schedule – every trip 10, 30, 90, 180, 360 For Dsl / Elec locos. Coaches – km based and type of service –pasenger, Mail express, Spl type-high speed. EMUs - km/link based
  1. Gostou de algum slide específico?

    Recortar slides é uma maneira fácil de colecionar informações para acessar mais tarde.

×