Cleaner production center and the montreal protocol
1. CLEANER PRODUCTION CENTRE OF SERBIA
AND MONTREAL PROTOCOL
ECA network meeting, Belgrade, Serbia, May 2011
2. NCPC SERBIA INAUGURATION
• The CPC is inaugurated on October 11,
2007 during 6th Ministerial Conference
“Environment for Europe”, Belgrade
ECA network meeting, Belgrade, Serbia, May 2011
3. Context
Jobs
Climate
change
Resource
Use
Productivity and
Pollution, competitiveness
chemicals
and waste
3
ECA network meeting, Belgrade, Serbia, May 2011
4. Cleaner Production
– Continuous application of an integrated preventive environmental strategy
to processes, products and services to increase efficiency and reduce risks
to humans and environment
low high
complexity of environmental issues
Sustainable
Development
high
UNEP (1994), Government Strategies for
Cleaner Production, United Nations
Environment Programme, Paris Cleaner Production
and Eco-Efficiency
Van Berkel (2007), Cleaner Production and
Eco-Efficiency, in International Handbook for environmental
Environmental Technology Management
Pollution
preference Prevention
Recycling
low Pollution
Control
Pollution
Dispersion
1960 1980 1990 4
ECA network meeting, Belgrade, Serbia, May 2011
5. CPC Serbia, Belgrade
MAIN SERVICES AND
TARGET INDUSTRIES
Technical Assistance and In-plant
Assessments
Training
CP Technology and Investment Promotion
Information Dissemination
CP Policy Advice
Chemical Leasing (ChL)
IPPC consulting
Waste management
Corporate Social Responsibility (CSR)
Target industries:
All industry sectors, focus on chemical,
metalworking and food-processing industry
ECA network meeting, Belgrade, Serbia, May 2011
6. Serbian CPC have not been involved directly in MP
implementation but the key advantages of CPCs
that would facilitate MP implementation at the
national level include:
• excellent rapport with local industries, governments and academia
and other stakeholders;
• ability to adjust and adopt environmental strategies to suit the
local conditions, the culture and manufacturing practices of their
country; and
• support of national and inter-CPC networks of qualified
professionals.
ECA network meeting, Belgrade, Serbia, May 2011
12. MODUL 2: COMPANY VISITS
ECA network meeting, Belgrade, Serbia, May 2011
13. MODUL 3: EVALUATION AND OPTION IMPLEMENTATION
BEFORE AFTER
ECA network meeting, Belgrade, Serbia, May 2011
14. FINAL CONFERENCE AND AWARD CEREMONY
ECA network meeting, Belgrade, Serbia, May 2011
15. RESULTS:
•So far, (2006-2010) total of 42 companies participated
with about 8,000 employees
•54 NE trained and certified
•Average savings per company: 100,000 EUR/year
•Average decrease of water consumption: 50,000 m3/year
•Average decrease in electrical power consumption: 500
MWh/year
•Average decrease in CO2 emission: 500 t/year
ECA network meeting, Belgrade, Serbia, May 2011
16. CHEMICAL LEASING – BUSINESS MODEL FOR
SUSTAINABLE MANAGEMENT OF CHEMICALS
ECA network meeting, Belgrade, Serbia, May 2011
17. Chemical Leasing in a nutshell
Chemical Leasing is a service-oriented business model. It suggests new
Principle forms of payments for chemicals that direct the economic interests of all
partners towards process optimisation and reduction of chemicals
consumption.
Environmental Economic
Objectives/ Reduction of emissions/waste Cost reduction/ added value for
Benefits all involved partners
Costs
Costs chemical
waste load
air pollution others producer
water
≈ pollution
Costs
Users
Chemical Chemical Equipment/plant Recycling/disposal Others
Actors
supplier/producer user supplier companies
ECA network meeting, Belgrade, Serbia, May 2011
18. Chemical Leasing: Motivations
Traditional business models: Chemical leasing models:
Contradictory motivations Bundled motivations
supplier Delivery of goods consumer supplier Delivery of services consumer
Material Life cycle costs
(material, work, waste
(costs, volume) management)
"the more the "less is more" "less is more" "less is more"
better"
ECA network meeting, Belgrade, Serbia, May 2011
19. FACTORY OF ROLLING BEARINGS AND
CARDAN SHAFTS (FKL) - SAFECHEM
The chemical will be substituted
Process will be optimized
ECA network meeting, Belgrade, Serbia, May 2011
20. CLEANING OF METAL PARTS BY
TRICHLOROETHYLENE
ECA network meeting, Belgrade, Serbia, May 2011
21. THE UNIT OF PAYMENT
NUMBER OF
WORKING HOURS
of the cleaning equipment
ECA network meeting, Belgrade, Serbia, May 2011
22. EXPECTED RESULTS
• The best practice risk management which is a unique state-of-the art
closed loop delivery system
• Consumption of carcinogenic solvent should be 60% less while there is
no solvent emissions and lifespan of the product is significantly increased
• Better occupational health and safety, as the cleaning system will be
completely closed
• Waste take-back and recovery
ECA network meeting, Belgrade, Serbia, May 2011
23. Regional RECP Network:
Albania, Armenia, Bulgaria, Croatia, Czech Republic, Hungary, Montenegro, Republic of
Moldova, Romania, Russian Federation, Serbia, Slovakia, Macedonia, Ukraine and
Uzbekistan
ECA network meeting, Belgrade, Serbia, May 2011
24. CONCLUSION:
•CPC SERBIA SUPPORTS MANUFACTURING SECTOR
•PERFORMED OVER 50 CPA
•IMPLEMENTING PROJECT “CHEMICAL LEASING”
•INCLUDING HPMP SUPPORT IN CPC PORTFOLIO BASED ON
THE EXPERIENCE AND NETWORK WE HAVE WITH THE
INDUSTRY SECTOR.
•POTENTIAL AT THE REGIONAL LEVEL AS A MEMBER OF
UNIDO/UNEP RECP Net
ECA network meeting, Belgrade, Serbia, May 2011
25. Thank you
for your
attention!!!
ECA network meeting, Belgrade, Serbia, May 2011