    reengineer your supply chain - Presentation Transcript

    1. Introduction The project will provide the your management team with a financially • evaluated view of supply chain configuration options that can be deployed in order to fulfil the your customer service requirement targets. There will be a full assessment of the current situation and cost drivers in the • present operational business model. Identification of the sources and causes of waste in the supply chain processes, both in terms of labour and materials. A fully costed – ‘Model for Success’, based upon the SWS Virtual Hubbing • concept will be created. The business case justification for the implementation of the Virtual Hubbing • model and the on-going operation will be created. There will be a detailed implementation plan with roles and responsibilities • identified, showing the time commitment required from both SWS and your personnel. SWS will work with the your team to make a series of recommendations, with • the intention of moving quickly into an implementation phase. Scope The supply chain design will cover the entire your operating environment at • Your site. The design will cover all product including bought-In complete items and will span from suppliers of materials and component items, through the your owned manufacturing and assembly facilities and through the your owned storage locations. The transport and handling arrangements at each stage will be covered as part of the investigation. The design will consider the organisational impact of the new supply chain • design options. This will be critical to the implementation of any agreed strategy. Approach SWS will work with your employees on an as-required basis, in order to provide a multi-skilled approach to the design work. The team once mobilised will work through a number of defined work packages. These will include: Data collection and analysis • Identification and analysis of the major cost drivers • Definition of proposed service levels between your and their suppliers and • customers www.smartwarehouse.com call 07738 528 029
    2. Running of inventory modelling simulations • Base-lining the proposed model against current performance • Process mapping current and proposed models • Testing and costing the proposed supply chain model • Preparation of the business case justification to proceed • Presentation of the results and recommendations at a formal Steering Group • Meeting Development and presentation of the milestone plan for the next stage - • Detailed Design and Implementation Project Governance Project management will occur on 2 levels. A project steering group will be formed from the management team at your. The make-up of the steering group should include: General Manager of the plant • Manufacturing Operations • Purchasing • Distribution / Warehousing • Customer Service Representation • Human Resources • Engineering • Information Technology • Finance • www.smartwarehouse.com call 07738 528 029
    SlideShare Zeitgeist 2009

    + otif plusotif plus Nominate

    custom

    671 views, 0 favs, 0 embeds more stats

    first step to achieve supply chain entitlement
    www more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 671
      • 671 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 54
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories