2012.11 C V Social Spaces

  • 409 views
Uploaded on

2012.11 C V Social Spaces

2012.11 C V Social Spaces

More in: Real Estate
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
409
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. 2012 Jingdezhen Porcelain Culture Centre, shopping centre Auditorium and 4D theatre. Test project for Crystal Architecture Design, based in China. Location: Jingdezhen, China. Estimated budget: 220,000,000 Chinese yuan. Design test project: 2012. Built area: 18.400 m2. First, second and auditorium level. Image.
  • 2. 2012 Spanish Royal Collections Museum, Madrid. Colaboration in architecture competition, 2002. FIRST PRIZE. Mansilla + Tuñon architects. Client: Patrimonio Nacional. Location: Palacio Real, Madrid, Spain. Budget: 37,000,000 euros. Competition 2002, Design project: 2003 -05. Currently under construction. Built area: 33.000 m2. Tapestries and painting floor, exterior view.
  • 3. 2011 Regional Theatre-Auditorium. Architecture competition, 2011. Location: Azuqueca de Henares, Guadalajara, Spain. Client: Regional Government of Castilla La Mancha. Estimated budget: 9,300,000 euros. Competition: 2011. Built area: 6.200 m2. Ground floor and image.
  • 4. 2009 Villa 08, Nanjing. Colaboration in Design development, 2003. Mansilla + Tuñon architects. Client: China Internacional Practical Exhibition of Architecture. Location: Nanjing, China. Budget: 700,000 euros. Design project: 2003-04. Currently under construction. Built area: 470 m2. Ground floor, exterior view and model.
  • 5. 2006 Museum of Cantabria, Santander. Colaboration in architecture competition, 2002. FIRST PRIZE. Mansilla + Tuñon architects. Client: Regional Government of Cantabria. Location: Santander, Cantabria, Spain. Budget: 32,000,000 euros. Competition: 2002. Design project: 2003-05. Built area: 17.000 m2. First floor and model.
  • 6. 2004 Castilla and Leon Museum of Contemporary Art (MUSAC), León. Colaboration in Design development and Construction documents, 2000-01. Mansilla + Tuñon architects. Client: Regional Government of Castilla y Leon. Location: Avenida de los Reyes Leoneses, Leon, Spain. Budget: 24,000,000 euros. Design project: 2000-01. Work completion: 2004. Built area: 11.000 m2. Ground floor and exterior view.
  • 7. 2003 Regional Government of Madrid Documentation Center in the Former El Aguila Brewery, Madrid. Colaboration in Construction documents, 1998-99 and site supervision, 2001-03. Mansilla + Tuñon architects. Client: Regional Government of Madrid. Location: Calle del General Lacy, Madrid, Spain. Budget: 36,000,000 euros. Competition: 1994. Design project: 1998-99. Work completion: 2003. Built area: 27.000 m2. Ground floor and exterior view.
  • 8. 2003 Sanfermines Museum, Pamplona. Colaboration in architecture competition, 2001. FIRST PRIZE. Mansilla + Tuñon architects. Client: Town Hall of Pamplona. Location: Pamplona, Spain. Estimated budget: 18,000,000 euros. Competition: 2001. Design project: 2002-03. Built area: 8.000 m2. General floor and model.
  • 9. 2003 Urban planning, Logroño. Colaboration in architecture competition, 2003. FIRST PRIZE. Mansilla + Tuñon architects. Client: Town Hall of Logroño. Location: Valbuena, Logroño, Spain. Estimated budget: 45,000,000 euros. Competition: 2003. Built area: 45.000 m2. General floor and image.
  • 10. 2003 History museum, La Coruña. Colaboration in architecture competition, 2003. Mansilla + Tuñon architects. Client: Town Hall of La Coruña. Location: Castro Elvira, La Coruña, Spain. Estimated budget: 18,500,000 euros. Competition: 2003. Built area: 10.000 m2. Ground floor and model.
  • 11. 2003 Visitor center of the National Park of Cabañeros, Ciudad Real. Colaboration in architecture competition, 2003. Architect: Mariano Bayón. Client: Parques Nacionales. Location: Horcajo de los Montes, Ciudad Real, Spain. Estimated budget: 4,100,000 euros. Competition: 2003. Built area: 4.300 m2. Ground floor and section.
  • 12. 2003 Offices building, commercial premises with parking lot, Madrid. Colaboration in architecture competition, 2003. Mansilla + Tuñon architects. Client: Fomento de Construcciones y Contratas (FCC). Location: Las Tablas, Madrid, Spain. Estimated budget: 36,000,000 euros. Competition: 2003. Built area: 30.000 m2. Ground floor and image.
  • 13. 2002 Regional Government of Madrid Regional Library in the Former El Aguila Brewery, Madrid. Colaboration in site supervision, 2001-02. Mansilla + Tuñon architects. Client: Regional Government of Madrid. Location: Calle del General Lacy, Madrid, Spain. Budget: 12,000,000 euros. Competition: 1994. Design project: 1995-96. Work completion: 2002. Built area: 12.000 m2. Ground floor and exterior view.
  • 14. 2002 Madrid tennis stadium, Madrid. Colaboration in architecture competition, 2002. Mansilla + Tuñon architects. Client: Empresa Municipal del Suelo, Town Hall of Madrid. Location: Parque del Manzanares, Madrid, Spain. Estimated budget: 70,000,000 euros. Competition: 2002. Built area: 70.000 m2. General floor and image.
  • 15. 2002 Civic Centre, Sabadell. Colaboration in architecture competition, 2002. Mansilla + Tuñon architects. Client: Town Hall of Sabadell. Location: Sabadell, Barcelona, Spain. Estimated budget: 42,000,000 euros. Competition: 2002. Built area: 76.000 m2. Ground floor and image.
  • 16. 2002 Hotel-Parador in the former Santo Tomás School, Alcalá de Henares. Colaboration in architecture competition, 2002. Mansilla + Tuñon architects. Client: Paradores de Turismo. Location: Alcalá de Henares, Madrid, Spain. Estimated budget: 24,000,000 euros. Competition: 2002. Built area: 35.000 m2. First floor and image.
  • 17. 2002 New Ademuz Parish Centre, Valencia. Colaboration in architecture competition, 2002. Mansilla + Tuñon architects. Client: Archdiocese of Valencia. Location: Ademuz, Valencia, Spain. Estimated budget: 4,000,000 euros. Competition: 2002. Built area: 3.300 m2. First floor and image.
  • 18. 2001 Cross Plan Construction, Teruel. Colaboration in architecture competition, 2001. SECOND PRIZE. Mansilla + Tuñon architects. Client: Regional Government of Aragon. Location: Teruel, Spain. Estimated budget: 34,000,000 euros. Competition: 2001. Built area: 43.000 m2. General floor and model.
  • 19. 2001 Public Library, Jerez. Colaboration in architecture competition, 2001. Mansilla + Tuñon architects. Client: Town Hall of Jerez de la Frontera. Location: Jerez de la Frontera, Cadiz, Spain. Estimated budget: 4,300,000 euros. Competition: 2001. Built area: 3.500 m2. Ground floor, model and image.
  • 20. 2000 Castellón Museum of Fine Arts. Colaboration in site supervision, 1999-2000. Mansilla + Tuñon architects. Client: Castellón Cultural S.A. Location: Avenida de los Hermanos Bou, Castellón, Spain. Budget: 21,000,000 euros. Competition: 1996. Design project: 1997. Work completion: 2000. Built area: 12.000 m2. Ground floor and cross view.
  • 21. 2000 Brescia Centre for Contemporary Art. Colaboration in competition, 1999, FIRST PRIZE, and Design development, 2000. Mansilla + Tuñon architects. Client: Comune di Brescia. Location: Crocera de San Luca, Brescia, Italy. Budget: 6,000,000 euros. Competition: 1999. Design project: 2000. Built area: 4.000 m2. Ground floor, model and image.
  • 22. 2000 Conference Centre, Peñíscola. Colaboration in architecture competition, 2000. Mansilla + Tuñon architects. Client: Castellón Cultural S.A.. Location: Peñíscola, Castellón, Spain. Estimated budget: 4,200,000 euros. Competition: 2000. Built area: 6.800 m2. Ground floor and model.
  • 23. 1999 Extension of the Centro de Arte Reina Sofia Museum, Madrid. Colaboration in architecture competition, 1999. Honorable mention. Mansilla + Tuñon architects. Client: Museo Nacional Centro de Arte Reina Sofía (MNCARS). Location: Madrid, Spain. Estimated budget: 42,000,000 euros. Competition: 1999. Built area: 21.000 m2. Ground floor and model.
  • 24. 1999 Extension of Thyssen-Bornemisza Museum, Madrid. Colaboration in architecture competition, 1999. Mansilla + Tuñon architects. Client: Fundación Thyssen-Bornemisza. Location: Paseo del Prado, Madrid, Spain. Estimated budget: 14,000,000 euros. Competition: 1999. Built area: 9.900 m2. Detail plan and model.
  • 25. 1999 Urban development, Sarriguren. Colaboration in architecture competition, 1999. Mansilla + Tuñon architects. Client: Regional Government of Navarra. Location: Sarriguren, Navarra, Spain. Estimated budget: 21,000,000 euros. Competition: 1999. Built area: 12.780 m2. General plan and image.