Cockermouth 8 Mnths On

1,367 views
1,251 views

Published on

A return to Cockermouth after the floods on on the eve of the visit by Princess Anne

Published in: Education
1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total views
1,367
On SlideShare
0
From Embeds
0
Number of Embeds
8
Actions
Shares
0
Downloads
51
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

Cockermouth 8 Mnths On

  1. 1. Cockermouth Eight Months On
  2. 4. Main Street Abandonment
  3. 5. Restoration
  4. 6. Adaptation
  5. 7. Wordsworth House Flood Level
  6. 8. Education
  7. 9. Riverside Despair Hope
  8. 12. Brewery Bridge
  9. 14. Defence 1 Million from the EA
  10. 15. Workington North Station <ul><li>At the end of September 2010 Workington North Railway Station closed </li></ul><ul><li>Serving 2000 passengers following the bridge collapse this has now dropped to 60. </li></ul>
  11. 16. Credits <ul><li>Photos </li></ul><ul><li>Mark OLLIS </li></ul><ul><li>based on the Cockermouth flood trail leaflet – purchased to raise funds for town’s recovery </li></ul>

×