Your SlideShare is downloading. ×
Cockermouth 8 Mnths On
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Cockermouth 8 Mnths On

1,135
views

Published on

A return to Cockermouth after the floods on on the eve of the visit by Princess Anne

A return to Cockermouth after the floods on on the eve of the visit by Princess Anne

Published in: Education

1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total Views
1,135
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
50
Comments
1
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Cockermouth Eight Months On
  • 2.  
  • 3.  
  • 4. Main Street Abandonment
  • 5. Restoration
  • 6. Adaptation
  • 7. Wordsworth House Flood Level
  • 8. Education
  • 9. Riverside Despair Hope
  • 10.  
  • 11.  
  • 12. Brewery Bridge
  • 13.  
  • 14. Defence 1 Million from the EA
  • 15. Workington North Station
    • At the end of September 2010 Workington North Railway Station closed
    • Serving 2000 passengers following the bridge collapse this has now dropped to 60.
  • 16. Credits
    • Photos
    • Mark OLLIS
    • based on the Cockermouth flood trail leaflet – purchased to raise funds for town’s recovery