• Like
RFNY2013: Invest In Moscow - Zelenograd
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

RFNY2013: Invest In Moscow - Zelenograd

  • 99 views
Published

Presentation was made during the Russia Forum New York 2013 series - “Invest in Moscow: Doing Business in Russia’s Capital” which was held at the Princeton Club of New York on October 28th.

Presentation was made during the Russia Forum New York 2013 series - “Invest in Moscow: Doing Business in Russia’s Capital” which was held at the Princeton Club of New York on October 28th.

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
99
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. L/O/G/O
  • 2. High-­‐Tech  Cluster  Zelenograd:  Structure  
  • 3. System  Pass-­‐Through  Supports  Innovation  in  Business   Lease term unlimited Lease term unlimited Lease term unlimited 1st stage (250,100 sq.ft) Lease term 3 years 2nd stage (290,000 sq.ft) Lot area- 146.5 ha Floor area – 60,700 sq.ft 3rd & 4th stage Lot area– 5.5 ha Lot area– 60 ha
  • 4. 1.  Technopolis  «Zelenograd»   The  main  purpose  of  Technopolis  «Zelenograd»  is  to  create  proper  environment  for   the  development  of    innovative  entrepreneurship           Total  lot   area:     12  ha   Total floor area: ​1,1 mln. sq. ft.   Total investment up to  $200   mln   Electronics,  energy   saving  equipment   Navigation,  aerospace   technology   Automation  and  control   systems   IT,   telecommunications   Medical  equipment   Electronic   components  and   equipment   4
  • 5. Technopolis  Construction  Plan   State   funding     Construction   stages   1st  stage   Period  –  2006-­‐2009     Five-­‐storey  ofJice  building  to   accommodate:        -­‐  Managing  Company's  staff  and   engineering  functions.          -­‐  Public  premises.          -­‐  Residents’  ofJices.   Floor  area  250,100  sq.ft   Stage  1   Industrial  facilities  –  60%   R&D  facilities  –  20%     OfJices  and  parking  –  20%     Cap.  investments  –  €36.1  million   Floor  area  –  290,400  sq.ft   Stage  2    2nd  stage   Period  –  2013-­‐2015      3rd  stage   Period  —  2014-­‐2016     4th  stage   State  funding,  loans,   investors   R&D  facilities  –  15%   Industrial  facilities  –  70%   OfJices  and  parking  –  15%     Cap.  investments  –  €74  million   Floor  area  –  410,200  sq.ft   Loans,   investors   Community  Center  –  25%   Industrial  facilities  –  35%   Storage  facilities  –  40%     Cap.  investments  –  €34.1  million   Area  –  150,400  sq.ft   Period  —  2015-­‐2017   Stage  3   Stage  4  
  • 6. 2.  Industrial  Park   The goal: To create up-to-date production zone for IT & electronics To create 20 thousand new high-tech jobs and attract front-edge companies from abroad.
  • 7. Industrial  Park  Construction  Plan   1st  Stage   15.5  ha   2nd  Stage   13.7  ha   3rd  Stage   12.4  ha   4th  Stage   5.6  ha   5th  Stage   5.9  ha  
  • 8. Industrial  Park  Construction  Plan       Construction   stages   1st  Stage   Period  –  2014-­‐2018     State  funding,   investors     -­‐  Research  and  production,  ofJices;   -­‐  Storage  facilities;   -­‐  Technological  infrastructure,  public   utilities;   -­‐ Customs  terminal   Construction  area  –  1  300  000  sq.ft   Cap.  investments  –  €163.6  million   Stage1   Investors   -­‐  R&D,  ofJices;   -­‐  Warehouses;     Construction  area  –  1  180  000  sq.ft   Cap.  Investments  –  €160.9  million   Stage  2    2nd  Stage   Period  –  2016-­‐2020      3rd  Stage   Period  —  2017-­‐2021     4th  &  5th  Stages   Investors   -­‐  Research  and  production,  ofJices;   -­‐  Educational  center;   -­‐   Exhibition  center,  conference  room   Construction  area–  1  100  000  sq.ft   Cap.  Investments  –  €150  million.   Investors   -­‐  Research  and  production,  ofJices;   -­‐  Residential  buildings;   -­‐   Hotel,  Jitness  center  and     shopping  center   Construction  area–  1  100  000  sq.ft   Cap.  Investments  –  €136.36  million.   Period  —  2018-­‐2022   Stage  3   Stages  4  &  5  
  • 9. Support  for  residents   5%   government   procurement   quota   for   innovative  products     Tax  reduction:   Income  tax  -­‐  13.5%  (instead  of  20%)   Property  tax  -­‐  0%     Partial   coverage   of   interest   rates   for   innovative  projects