Upper Laguna Creek Eva Butler
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
795
On Slideshare
789
From Embeds
6
Number of Embeds
1

Actions

Shares
Downloads
8
Comments
0
Likes
0

Embeds 6

http://sustainh2o.org 6

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • Slide 1 – Upper Laguna Creek Collaborative Update On _____________, the Board voted in favor of a Resolution to participate in the Upper Laguna Creek Collaborative process. This presentation will: Describe the ULCC vision; Provide an update on the Collaborative’s activities since the Resolution; and Outline the ULCC’s plans for the next two years.

Transcript

  • 1. Upper Laguna Creek Planning Process
  • 2. ULCC Mission
    • To collaborate in the
    • design of a multi-use
    • corridor along Upper
    • Laguna Creek
  • 3. The Vision: The Laguna Creek Regional Parkway
  • 4.  
  • 5. Broad Participation
      • Planning departments
      • Public works agencies
      • Park districts
      • Regulatory agencies
      • Environmental advocates
      • Residents
      • Landowners/Developers
  • 6. Benefits of a Coordinated Watershed Approach
    • Avoids inter-project conflicts
    • Reduces duplication of effort
    • Avoids late-stage redesigns and delays
    • Provides space for future infrastructure
    • Streamlines environmental permitting
    • Conserves riparian habitat and connects multiple preserves
  • 7. Upper Laguna Creek Corridor Sample Section
  • 8. Trails and Bridges Vernal Pool Preserves Riparian Habitat Corridor Corridor for Future Infrastructure Interceptor Sewer Stormwater Treatment/ Flood Control Facilities Corridor Elements
  • 9. Stormwater Management Goals
    • Manage Runoff
    • Pre = Post
    • Goal: Match the pre-development hydrograph
    • How?
  • 10. Hydrogeomorphic Model
    • Assess existing conditions
    • Project future impacts
    • Set performance standards
    • Identify management strategies
      • Decrease impervious surface area
      • Promote retention & infiltration (on-site and off-site)
      • Use flow duration controls to meter flows to creek
  • 11. High-value Resource Area
  • 12. Integrating LID & flow-duration control strategies Flow Duration Control Basin Urban Runoff Laguna Creek FDC Basin Bio-infiltration Swale LID On-Site BMPs LID On-Site BMPs On-Site BMPs Wetlands Urban Runoff Urban Runoff Off-Site BMPs Wetlands
  • 13. Facilitating the Paradigm Shift
    • Support collaboration & info sharing
    • Create incentives
    • Use pilot project to demonstrate approach
    • Assist practitioners with their projects
    • Evaluate economics: cost/benefit analysis
    • Contribute to solution-oriented permits