Your SlideShare is downloading. ×

Kissy maternity hospital

80
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
80
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. February 2013 MATERNAL AND CHILD HEALTH (MCH) CENTER AT UMC GENERAL HOSPITAL, KISSY, FREETOWN
  • 2.  Maternal and Child Health (MCH) Center at UMC General Hospital, Kissy, Freetown : a. 42-bed Hospital complete with:  An OR  A Neonatal ICU (NICU)  Prenatal and postnatal wards  Two labor and delivery rooms  Pediatric ward  Isolation ward  Children’s play/toy room  Office spaces and consultation rooms
  • 3. :  Facility will be fully air-conditioned with hot and cold water/bath and several restroomsd. Hospital Equipment:  Provided by the Indiana Conference & Brothers Brother. Includes standard hospital beds, bedside lockers, over-the-bed tables, oxygen concentrators, OR light, OR beds, electronic and manual scales, delivery beds etc
  • 4. Funded by  The United States Agency for International Development (USAID) and the United Methodist Committee on Relief (UMCOR
  • 5. SUBSTRUCTURE AND SUPERSTRUCTURE:100% COMPLETE
  • 6. SUB-AND SUPER-STRUCTUREREAR VIEW
  • 7. SUB-& SUPERSTRUCTUREMAIN ENTRANCE
  • 8. SUPERSTRUCTURE: RIGHT VIEW SHOWINGRAMP
  • 9. AERIAL VIEW
  • 10. RIGHT VIEW
  • 11. CEILING: 94% COMPLETE
  • 12. EXTERNAL WORKS: 30% COMPLETE SHOWINGPAVEMENT
  • 13. RECEPTION AREA
  • 14. PRENATAL WARD
  • 15. PRENATAL WARD SHOWING WINDOWS
  • 16. ELECTRICAL INSTALLATION: 70% COMPLETEAC UNIT
  • 17. PLUMBING INSTALLATION: 75% COMPLETESHOWING WC
  • 18. CEILING: 94% COMPLETE
  • 19. STAIRCASE
  • 20. SCREEDING: 10% COMPLETE-RAMP
  • 21. KITCHEN WORKTOP
  • 22. TILING: 95% COMPLETE
  • 23. SCREEDING: 10% COMPLETEROOFTOP
  • 24. ROOFTOP: STORAGE AND WATER TANK
  • 25. POSTNATAL WARD RECEPTION
  • 26. DOORS: 60% COMPLETE
  • 27. OPENING SOON