Mexico: the land of silver
Upcoming SlideShare
Loading in...5
×
 

Mexico: the land of silver

on

  • 941 views

Objective Capital's Global Resources Investment Conference 2011...

Objective Capital's Global Resources Investment Conference 2011
Stationers' Hall, City of London
27-28 September 2011
Day 1- Session 6: Americas' focus
Speaker: George Cavey, Orko Silver

Statistics

Views

Total Views
941
Views on SlideShare
587
Embed Views
354

Actions

Likes
0
Downloads
4
Comments
0

4 Embeds 354

http://www.objectivecapitalconferences.com 350
http://objectivecapitalconferences.com 2
http://localhost 1
http://translate.googleusercontent.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Mexico: the land of silver Mexico: the land of silver Presentation Transcript

  • Mexico: the land of silver
    George Cavey – Orko Silver
  • @Objectivelive
    GLOBAL RESOURCESINVESTMENT CONFERENCE 2011
    Lead sponsor:
    Media partners:
    Other sponsors & participating organisations:
  • On the Fast Track to Silver Production at La Preciosa
    September 14, 2011
    View slide
  • Key Management & Directors
    Gary Cope - President, CEO, and Director – Gary Cope has more than 30 years experience in corporate finance and corporate strategy, as well as significant experience with the financing of publicly held companies. Mr. Cope arranged the financing and was instrumental in the negotiations and sale of the South Kemess Deposit.
    Mike Devji - Executive Vice-President and Director – Also President & CEO of Blackcomb Minerals Inc. An experienced financier of public companies, Mr. Devji led a group of investors who financed a 40% interest in the South Kemess Gold-Copper Deposit in British Columbia, Canada. That interest was subsequently sold for over $400 million.
    George Cavey, P. Geo. - Vice-President Exploration and Director –35 years in exploration and consulting as the president of OreQuest Consultants. Past President of the Canadian Council of Professional Geoscientists. The 2004 recipient of the APEGBC C.J. Westerman Award. Also the recipient of the 2010 Canadian Professional Geoscientist Award, Canada’s highest honor for a Professional Geoscientist.
    B.H. (Ben) Whiting, M.Sc., P.Geo. - Chief Geologist - 30 years experience in the international exploration and mining plus past Adjunct Professor at Queen's University. Mr. Whiting was awarded the Aaro Aho Foundation's prize in Economic Geology.
    Art Freeze, P.Geo. - Consulting Geologist, Advisory Board Member –40 years experience in international exploration and project management. Technical Advisor and Director for several public mining companies as well as a consulting geologist for Goldcorp.
    4
    View slide
  • Capital Structure September 14, 2011
    Primary Listing: TSX Venture Exchange
    Trading Symbol: OK
    US OTC Pink Sheets: OKOFF
    Frankfurt Exchange: OG3.F
    Share Structure
    Issued: 129,446,979
    Options: (average $0.55) 12,672,500          
    Fully diluted: 142,118,979
    Working Capital CDN $13,800,000
    52 Week Low/High CDN $1.40 to $3.25
    Current Price: CDN $2.57
    Share Ownership (Fully diluted)
    Institutional ~ 35% - 40%
    Management ~ 15%
    Goldcorp, Inc. (NYSE: GG) ~ 3%
    Pan American (NASDAQ: PAAS) ~ 3%
    5
  • Company Highlights
    • La Preciosa, one of the world’s largest primary silver deposits is located in Durango, Mexico, theworld’s largest silver producer – 128.6 million oz in 2010.
    • Our 43-101 compliant Resource Estimate is now 175 Million Silver Equivalent Ounces (70% Indicated, 30% Inferred)
    • On April 14th 2009 Orko Silver signed a Joint Venture Agreement with Pan American Silver (NASDAQ: PAAS) to bring the La Preciosa deposit into production.
    • Orko is fully financed.
    • Aug 10th, 2011 Orko and Pan American release a new Resource Estimate (fully diluted resources) and a Preliminary Economic Assessment (PEA)
    • Positive PEA demonstrates a long robust mine life.
    6
  • La Preciosa Mineral Resources
    (Fully Diluted)
    NI 43-101 Reserve & Resource Categories
    Reserve Categories Resource Categories
    - Proven, Probable - Measured, Indicated, Inferred
    *Estimated at a 50 :1 Silver/Gold ratio with metallurgical recoveries and refining charges assumed to be the same for Ag & Au
    7
    - The 2009 resource estimate of 146.3 million ounces was an undiluted estimate
  • Preliminary Economic Assessment (PEA)
    On Aug 10th, 2011 Orko and Pan American release a Preliminary Economic Assessment (PEA)
    • Demonstrates the potential for a 12 year mine
    • Annual production of 6.8 million oz Ag and 12,000oz Au (LOM)
    • Cash cost of $ $11.84/oz Ag
    • Capital costs of $270 million (PAA burden)
    8
  • Sensitivity Analysis of La Preciosa
    9
  • 10
    Internal Rate of Return (IRR%)
    IRR%
  • Internal Rate of Return (IRR) vs Metal prices
    Internal Rate of Return
    11
    Silver $/oz,
    Gold $/oz
  • Net Present Value (NPV @ 5%) vsMetal Prices
    Net Present Value ($ million)
    12
    Silver $/oz,
    Gold $/oz
  • Cost of Production 2010 (actual)- 2011(estimate)
    7.8 – Potential La Preciosa Production (million ounces)
    8.8
    *- Assumes the completion of a positive feasibility study
    7.2
    6.6
    • Assumes the completion of positive feasibility study
    • Assumes 91% Ag recovery and 65% Au recovery
    • Assumes Ag 250 g/t, Au 0.30 g/t
    • Assumes 10% dilution
    • Ag Eq = Ag/Au 60:1
    13
    OK
    Source: BMO Capital Markets
  • Regional Map - Durango State, Mexico
    • 45 minutes from the city of Durango
    • 45 minutes from International Airport
    • Access by paved highway
    • 8 km to national power grid
    • 8 km to rail lines
    • 2 hours by road/rail to smelter
    Located in the heart of Mexico’s prolific Sierra Madre Mining Belt,which hosts large silver deposits such as Fresnillo & Pitarrilla
    14
  • La Preciosa
    The Joint Venture consists of a large land package of 32,400 hectares (~ 80,000 acres)
    15
  • La Preciosa Deposit – Mine Plan
    Vertical Cross Section 2701980N
    16
    Vertical Cross Section 2701980N
  • La Preciosa Exploration and Development
    17
    Completed
    • Orko&Pan Am diamond drilling -245,000 metres (796,000 feet or 151 miles) of core in 717 holes.
    • Geotechnicalpit-slope and mine support design (Golder Associates )
    • Metallurgical&petrographicalstudies (SGS Mineral Services)
    • Processingplant design studies (M3 Engineering)
    • EnvironmentalImpact Assessment (Clifton Associates )
    • Resource Estimate (Snowden Mining Consultants Inc.)
    • Preliminary Economic Assessment (Snowden Mining Consultants Inc.)
    Ongoing
    • Project engineering consulting for Orko (AMEC)
    • Community relations and surface rights purchase (Pan American)
    • Feasibility Study by April 13, 2012 (Pan American/Snowden?)
  • Projected La Preciosa Timeline
    PAN
    AMERICAN
    DEAL
    SIGNED
    * The terms of the JV agreement require PAAS to complete a feasibility study by April 13, 2012.
  • Projected Annual Silver (Eq) Production
    Silver Eq Ounces (millions)
    Annual production (million ounces)
    * - Assumes an ~10% increase in productivity with final engineering study results
    La Preciosa’s potential production of more than 7 million ounces of silver annually represents more than 5% of Mexico’s annual silver production
    19
  • Potential Annual Silver (Eq) Production
    Assumes 100% Orko interest
    (Orko 45% interest = 4.2)
    20
    AgEq production estimate
    * - does not include base metal credits
  • World's Leading Primary Silver Mines
    (2010 production in millions of ounces)
    Source: The Silver Institute
    21
  • Significance of La Preciosa to PAA
    22
    * - Columns are assuming silver only (not silver equivalent - AgEq) for La Preciosa
  • Upside for Orko
    • Pan American has spent more than US$16 million on exploration and development to complete a feasibility study
    • PAAS must contribute 100% of the funds necessary to develop and construct an operating mine, in consideration for a 55% interest in the joint venture
    • Orko will be fully carried and will end up owning 45% of a producing mine
    • PAAS is fast tracking La Preciosa to production for early 2014
    • AMEC and Orko have determined that the PEA is a conservative document, with upside expected in:
    • Resource estimate (lower cut-off grades)
    • Mining methods
    • Reduced dilution of many of the veins
    • Grade
    • Financial analysis-
    • 5% management fee included will disappear if 100% PAAS ownership(~$0.80 per oz Ag)
    • ~$30 million in sustaining capital to be moved to capital costs (100 % PAAS burden)
    • Net result will be lower costs per tonne, longer mine life
    23
  • As of September 14, 2011
    24
    ECU, OK, MAG, SVL, XAG, KTN, ORM, SOLUXG, EPZ, ASM, CJOGPR, FR, EDR, SLX, FVI, IPT
  • What Others are Saying
    Byron Capital Markets – Jeff Wu, Mining Analyst – Aug 2011 “The PEA deeply underestimates La Preciosa’seconomic value.”
    GMP – Kevin Reid, Director -“We highlight Orko Silver as a unique investment opportunity in the silver sector, offering good metal price exposure to silver and exploration upside through its La Preciosa project in Durango, Mexico, but with a lower risk profile than typical for a preproduction silver play as its JV agreement with senior producer Pan American Silver offloads construction financing risk (OK is fully carried through to production) and reduces overall development risk (Pan American is an experienced mine builder). While we see good upside to our fundamental target, we also believe that the structure of the JV with Pan American makes Orko Silver a potential M&A target. ”
    Pan American Silver – Geoff Burns, President – Aug 2011 -“It is a very interesting project  for Pan American …it has a solid silver production profile, has a relatively long mine life, and is located in a good mining jurisdiction…At current silver prices, the project economics become extremely robust. We will be moving forward aggressively to complete a Feasibility Study and to position ourselves for a construction decision…”
    25
  • Orko Silver Corp. Share Price Chart – September 14, 2011
    Increase Ag $
    PAA JV announced
    Confusion over PAA JV
    Analyst Reports Released
    Soft TSX market
    Private Placement Announced
    Understanding of PAA JV
    6th Resource Estimate
    February 2011
  • Why Orko Silver?
    • La Preciosa is one of the world’s largest primary silver deposits
    • La Preciosa’s superb location offers an infrastructure advantage
    • Pan American is advancing La Preciosa to production, early 2014
    • Excellent potential to expand the silver resources
    • Orko has a fully carried interest into production
    • Better leverage in Orko shares than Pan American shares; the current share price doesn't factor in any potential takeover premium
    • Significant upside in lower costs and higher productivity when engineering studies are concluded and incorporated into the Feasibility Study
    • Orko is fully financed
    • Share price doesn't factor in an increase in the price of silver, PAAS could forward sell at today’s Ag price
    • Orko’s economic share of production is closer to 57% to reflect $0 capital cost (GMP)
    • Share price doesn't factor in increased confidence generated from a full Feasibility Study (Q2 - 2012) 
    27
  • Contact Information
    1180 - 999 West Hastings Street
    Vancouver, B.C. Canada V6C 2W2
    Phone: +1.604.687.6310
    Fax: +1.604.687.6365
    Email: info@orkosilver.com
    Web: www.orkosilver.com
    TSX Venture Exchange: OK
    US OTC Pink Sheets: OKOFF
    Frankfurt Exchange: OG3.F
    28
  • Forward-Looking Statements
    This presentation of Orko Silver Corp. (the “Company”) contains “forward-looking information” within the meaning of the United States “Private Securities Litigation Reform Act of 1995” and applicable Canadian securities legislation. Statements containing forward-looking information express, as at the date of this presentation, the Company’s plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and the Company does not intend, and does not assume any obligation to, update such statements containing the forward-looking information. Generally, forward-looking information can be identified by the use of forward-looking terminology such as “plans,” “projects” or “projected,” “expects” or “does not expect,” “is expected,” “estimates,” “forecasts,” “scheduled,” “intends,” “anticipates” or “does not anticipate,” or “believes,” or variations of such words and phrases, or statements that certain actions, events or results “may,” “can,” “could,” “would,” “might” or “will be taken,” “occur” or “be achieved.” Statements containing forward-looking information include, but are not limited to, statements with respect to the anticipated economic returns of any of the Company’s projects, the expected results from exploration activities, the economic viability of the development of newly discovered ore bodies, the accuracy of mineral resource estimates, future production levels, the requirements for additional capital, the results of drilling, and Orko Silver’s commitment to, and plans for developing, newly discovered and existing mineralized structures.
    Statements containing forward-looking information involve known and unknown risks, uncertainties, and other factors that may cause the actual results, level of activity, performance, or achievements of Orko Silver and its operations to be materially different from those expressed or implied by such statements. Such factors include, among others, the actual results of current exploration activities, future prices of silver and gold, unpredictable risks and hazards relating to the development of La Preciosa, and the speculative nature of exploration and development. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed, or intended. There can be no assurance that any statements containing forward-looking information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, undue reliance should not be placed on statements containing forward-looking information.
    This presentation has been prepared by the Company and has not been reviewed or approved by Pan American Silver.George Cavey, P.Geo., is the Qualified Person responsible for the preparation of the scientific and technical information related to the Company’s operations that is included in this presentation.
    29
  • www.orkosilver.com