0
GLOBAL RESOURCESINVESTMENT FORUM          Andrew Cranswick – CEO, African Consolidated ResourcesIRONMONGERS’ HALL, CITY OF...
AFRICAN CONSOLIDATED RESOURCES PLC - AIM: AFCR   High grade, 4.3 million ounce, JORC–certified deposit    2.4m Inferred; 1...
Pickstone Open Pit : BFS SIMPLIFIED                                      OPTIMIZATION METHODOLOGY
PICKSTONE SECTION: GRADE DISTRIBUTION MODELState-of-the-Art Technology Applied – BFS simplified
State-of-the-Art Technology Applied – BFS simplified           Peerless ore shell with Pickstone to right
AFRICAN CONSOLIDATED RESOURCES PLC - AIM: AFCR   High grade, 4.3 million ounce, JORC–certified deposit    2.4m Inferred; 1...
Upcoming SlideShare
Loading in...5
×

'In the elevator'

612

Published on

Objective Capital's Global Resources Investment Forum 2012
Ironmongers' Hall, City of London
25 September 2012
Speaker: Andrew Cranswick, ACR

Published in: Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
612
On Slideshare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "'In the elevator'"

  1. 1. GLOBAL RESOURCESINVESTMENT FORUM Andrew Cranswick – CEO, African Consolidated ResourcesIRONMONGERS’ HALL, CITY OF LONDON TUESDAY, 25 SEP 2012www.ObjectiveCapitalConferences.com
  2. 2. AFRICAN CONSOLIDATED RESOURCES PLC - AIM: AFCR High grade, 4.3 million ounce, JORC–certified deposit 2.4m Inferred; 1.9m Measured & Indicated 1.6m troz Pit @ 2g/t Au > 50% Measured / Indicated1.6m Underground @ 4+g/t Au > 50% Measured / Indicated BFS commencing - 2012 Q4
  3. 3. Pickstone Open Pit : BFS SIMPLIFIED OPTIMIZATION METHODOLOGY
  4. 4. PICKSTONE SECTION: GRADE DISTRIBUTION MODELState-of-the-Art Technology Applied – BFS simplified
  5. 5. State-of-the-Art Technology Applied – BFS simplified Peerless ore shell with Pickstone to right
  6. 6. AFRICAN CONSOLIDATED RESOURCES PLC - AIM: AFCR High grade, 4.3 million ounce, JORC–certified deposit 2.4m Inferred; 1.9m Measured & Indicated 1.6m troz Pit @ 2g/t Au > 50% Measured / Indicated1.6m Underground @ 4+g/t Au > 50% Measured / Indicated BFS commencing - 2012 Q4
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×