Your SlideShare is downloading. ×
0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Bje final present-v.1.0
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Bje final present-v.1.0

468

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
468
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Thanakit Sapmamoon 532115035 Noppasart Fongkham 532115041 Project Advisor Mr.Kittitouch Suteeca
  • 2.       Project Overview Project Planning ISO29110 Software Demo Video Problem Comments and Suggestions from ShowPro event
  • 3.  Beginning JAVA By E-Learning  Convenience for user - can use everywhere - learning via text and video - exercise for practice java skill
  • 4.  Limitation  Google Chrome is the most effectiveness browser.  Require internet connection
  • 5.  Project Overall Status : 100% Progress I URS 1,2,3,4,6,7 Progress II URS 5,9 Progress III URS 8,10,11
  • 6.  ISO29110 is the Software Life Cycle Profiles and Guidelines for enterprise,organization,department or project having up to 25 people.  Project Management activities:      PM.1 Project Planning PM.2 Project Plan Execution PM.3 Project Assessment and Control PM.4 Project Closure Software Implementation activities       SI.1 Software Implementation Initiation SI.2 Software Requirements Analysis SI.3 Software Architectural and Detailed Design SI.4 Software Construction SI.5 Software Integration and Tests SI.6 Product Delivery
  • 7.  Project Management Activity
  • 8.    Identify project scope with project advisor Estimate time for each task Plan the schedule
  • 9.   Define the project repository as Dropbox Identify the software configuration item
  • 10. Configuration Item Table No. Work Item Repository Baseline Version 1. Proposal / BJE/Proposal 1.5 2. Project Management Plan / BJE /Project Plan 3.0 3. Software Requirement Specification / BJE /SRS 3.0 4. Software Design Document / BJE /SDD 3.0 5. Traceability Record / BJE/Traceability Record 3.0 6. Test Plan / BJE /Testing 3.0 7. Test Record / BJE / Testing 3.0 8. SourceCode / BJE / Software Source Code 1.0 9 Project Status Record / BJE / Etc 1.0 10 Self Assessment / BJE / Etc 1.0
  • 11.  Create Project Status Report for each progress report  Progress I , Progress II and Progress III
  • 12.  Create Verification Record for recording the verification results  Check by the checklist  The checklist is from the tasks in the quality planning in Project Plan
  • 13.  Software Implementation
  • 14.  Identify  Development Tools  Hardware and Material Resource  Responsibilities
  • 15.    Gathering the requirements from project advisors and team members Analyze the requirements Establish Software Requirements Specification (SRS)  11 URS and 25 SRS  Including these diagrams : ▪ 11 Use Case diagrams ▪ 16 Activity diagrams
  • 16.  Establish Software Design Document  Including : ▪ System Architecture ▪ Class Diagram ▪ Sequence Diagram ▪ User Interface  Create Traceability Record
  • 17.   Construction software follow SRS and SDD Perform unit testing
  • 18.  Design the test cases and establish Test Plan  22 unit test cases, 18 system test cases   Perform the test cases Record the test results in the Test Record
  • 19.  Get acceptance by project advisor
  • 20. Software Demo Video
  • 21.  Take a long time for part of coding assignment and checking assignment system
  • 22. Thank you for your kind attention Q&A

×