Your SlideShare is downloading. ×
0
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Bengkel kik 3.2011.8
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Bengkel kik 3.2011.8

99

Published on

Slide untuk Bengkel Kumpulan Inovatif & kreatif (KIK) (8)

Slide untuk Bengkel Kumpulan Inovatif & kreatif (KIK) (8)

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
99
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Terlibat
  • 2. PENILAIAN DIBUAT MENGGUNAKAN BORANG PENILAIAN YANG DIEDARKAN KEPADA SETIAP AHLI DI AKHIR PROJEK BORANG DI ISI SEBELUM DAN SELEPAS PROJEK
  • 3. KUALITI HASIL KERJA KEBERKESANAN KOMUNIKASI PROAKTIF, KREATIF, INOVATIF KEBOLEHAN BUAT KEPUTUSAN KEPIMPINAN JALINAN HUBUNGAN 8.5 9 9 9 9 9.5 Selepas Sebelum 0 – 205 = Sangat Lemah 21 – 40% = Lemah 41 – 60% = Sederhana 61 – 80% = Baik 81 – 100% = Cemerlang 7.5 8 7 7.5 8 8

×