Slide 1: Check the sizes of all four supports..They keep varying in diameter as well as the height
Slide 2: Only one support. That too off- centered.
Slide 3: The pillar in perspective. See the next column having two supports.
Slide 4: If the previous support was for banking, then this pillar should not have two supports of different heights.
Slide 5: The Concrete blocks are not of the same width through the stretch. The single support column under a thinner slab.
Slide 6: The pillars differ in sizes from one to the next. This perspective is of the bridge running at the same level (supposed to be) but the pillar sizes differ.
Slide 7: Again Single support. Weight distribution is questionable.
Slide 8: Banking is wrong! Exact opposite. Yellow is just to indicate the correct tilt/banking. This is the section that’s next to the one that collapsed. (this pic was taken before it was erected – see iron columns)
Slide 9: Same section .. Just closer
Slide 11: Exactly how it was about two months back!
Slide 14: After disaster
Slide 26: • ITS NOT A DISASTER. -- IT’S A BLUNDER CAUSED BY SEVERAL CONTRACTERS, ENGINEERS, BUILDERS, LABOURERS AND NEVER THE LESS… A CONTRACT AGENCY. THE GOVERNMENT OFFICIAL WHO SANCTIONED THEM THE CONTRACT – THE GOVT OFFICIAL WHO EXAMINED THE PROGRESS OF THE FLYOVER REGULARLY. IT MAY BE HUMANE TO ERR. BUT IT IS INHUMAN TO IGNORE THEM REMEMBER FRIENDS – ILLEGAL EXCHANGE OF ONE RUPEE CAN COST TOO MANY LIVES – SAVE INDIA – ITS OURS.