Update of  Coral Bay Nickel Corporation’sHydrometallurgical Processing Plant   For Low Grade Nickel Ores
The Project is located within theindustrial facility of Rio Tuba NickelMining Corporation (RTNMC) in Brgy.Rio Tuba, Batara...
HPP SIMPLIFIED FLOWSHEET                                                        Flash                              Demin  ...
HPP LINE 1 (ECC granted July 10, 2002)             PERFORMANCE AFTER 4 YEARS                                              ...
HPP LINE 2 (ECC granted Feb. 1, 2007)           COMBINED PRODUCTION CAPACITY  June, 2006 to Jan. 2009 – Construction     D...
Million US Dollars                                   Line 1        Line 2Total Investment                    200          ...
   Environmental Protection and Enhancement Program    (EPEP)   Social Development and Management Program    (SDMP)   F...
Particulars        Requirements         Compliance            Remarks1. CLRF             Php 5.25 M          Now > Php 6 M...
Tailings Storage Facility                       Water Treatment
Pier Site Facilities                                         Rio Tuba River                                           Maca...
ELECTROSTATIC                             STACK   PRECIPITATOR            BOILER              GENERATOR                   ...
Particulars             Parameters            Standards         Actual1. Effluent Siltation       pH                  @   ...
Particulars            Parameters             Standards         Actual2. Air       Plant          CO                  < 50...
Continuous Monitoring Systems                          D                          C                          S       CEMS ...
Marine Waters         24 HR TSP                      samplerInland Waters   NO2, SO2          Acid                sampler ...
Annual CoastalResources AssessmentFindings:A healthy marine ecosystem wasmaintained at the primary impact zoneof CBNC’s c...
Trestle pile with soft coralsTrestle area teeming with fishes
The results of the study showed thatthe flora and vegetation within theproject site and its vicinities are stillintact. Ge...
pH?   ppm?   mg/L?Biodiversity?  We just want to know if the fish,the birds, the bees, the animals, and  people will not  ...
Bees as Air Quality Bio-Indicators
Fish (Fresh and Salt Water) as Water Bio-Indicators
For TESTING........For TASTING........
TREE                      BUFFERPLANTING                     ZONE           CBNC Personnel           And           Contrac...
Mangrove Planting at Nagoya Beach Area       Eastern side of causeway      Western side of causeway
Vermi-compostingproject toproduceorganicfertilizer
By: BMP Environment and Community Care, Inc.          June 16-19, 2006 Site Visit
bmp E    NVIRONMENT & COMMUNITY CARE, INC.“The Environmental Audit highlighted   the HPP Project’s REMARKABLE     the HPP ...
Particulars    Requirements         Compliance           Commitment            Remarks1. Financial      > 1 % of Direct   ...
SDMP COVERAGE OR IMPACT AREAS
SDMP COVERAGE OR IMPACT AREASNon- IP Communities : 11IP Communities : 24
SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM                                     SDMP I Expenses vs SDMP II Budget           ...
SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM                                         SDMP I Expenses vs SDMP II Budget       ...
SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM                                       SDMP I Expenses vs SDMP II Expenses       ...
RTNFOUNDATION, INC.                    HOSPITAL                                           Number of patientsStatus     : P...
Leonides S. Virata Memorial SchoolStatus : Private school, supervised by De La             Number of Students         Sall...
Indigenous Learning System (ILS)   Concept      :         Arnold Jansen Catholic                     Enrolment Profile (0...
Gawad Kalinga   Aim : 1,000 houses in 10 years   2009 : 100 houses turned over       Established sites       Sites being...
GK Concept +                             The IPs “SWEAT” Equity  CBNC/RTNMC Funding                            (At least 1...
Gawad Kalinga – Kulantuod   35 Units
Gawad Kalinga – Bongkol-Bongkol                      48 Units
Gawad Kalinga – Ocayan      17 Units
SDMP I Accomplishments (2004-2008)Infrastructure:                     Social Services: 16 Day Care Center                ...
SDMP I Accomplishments (2004-2008) Livelihood:                           SUMMARY OF SCHOLARS   NON-IP   IP    TOTAL   No. ...
INFRASTRUCTURE PROJECTS
LIVELIHOOD PROJECTS
COMMUNITY SERVICES
OTHER COMMUNITY SERVICES
EDUCATIONAL ASSISTANCESDMP scholars during a team building seminar. 77 graduated. Some of the 7 school buildings, 14 class...
SDMP II Accomplishments (2009)        Infrastructure:       1 Road Concreting       2 Construction of Bridges       1 T...
SDMP II Accomplishments (2009)Social Services: 4 units Hi-Lux Vehicle 2 units Ford Everest 1 unit Ford Ranger 4 units ...
SDMP II Accomplishments (2009)
SDMP II Accomplishments (2009)       Livelihood:    86 units Spraycan    3 Fishing boats & accessories    6 units Hand ...
SDMP II Accomplishments (2009)    Education:   2,316 Elem. pupils assisted   84 Elementary Scholar   243 High School Sc...
RTN FOUNDATION, INC.Garnierite Avenue, RTNMC Town site, Rio Tuba, Bataraza, Palawan 5306Mobile No.: 09175750135
Particulars      Requirements          Compliance        Remarks1. Financial      Php 106 Million      To implement      A...
HPP Project        Area    End-of-Project Land    Site            (ha)            UseHPP Complex          35    Forestland...
Environmental Management Office
Daghang Salamat, Arigato Guzaimasu, Maraming Salamat Po!
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
Upcoming SlideShare
Loading in...5
×

Coral Bay Update on the Palawan HPAL Project

3,779

Published on

Coral Bay Update on the Palwan HPAL Project

Coral Bay Nickel Corporation’s
Hydrometallurgical Processing Plant
For Low Grade Nickel Ores

Published in: Investor Relations, Travel
3 Comments
2 Likes
Statistics
Notes
  • binuhay kmi ng aming ama ng maayos at matiwasay dahil sa mina....... mamamatay ako para dito...... lahat ng nag sasabi ng NO TO MINING ay ang mga TAO n hindi taga rito sa PALAWAN.... ginagamit nyo lang ito para kumita kayo ng pera ng di niyo pinaghirapan... subukan niyo mamuhay sa minahan para malaman niyo pinagsasabi niyo....
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • NO TO POVERTY.... YES TO RESPONSIBLE MINING
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Write a comment...www.no2mininginpalawan.com
    and VOTE to stop large-scale
    open-pit mining in PALAWAN
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
No Downloads
Views
Total Views
3,779
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
3
Likes
2
Embeds 0
No embeds

No notes for slide

Transcript of "Coral Bay Update on the Palawan HPAL Project"

  1. 1. Update of Coral Bay Nickel Corporation’sHydrometallurgical Processing Plant For Low Grade Nickel Ores
  2. 2. The Project is located within theindustrial facility of Rio Tuba NickelMining Corporation (RTNMC) in Brgy.Rio Tuba, Bataraza, Palawan.Since 1977, RTNMC has been miningsaprolitic nickel ores selling them toferro-nickel smelters abroad. In more Coral Bay Nickel Corporationthan 25 years of operation, it alsogenerated mine wastes of about 25million tonnes. Called low gradelimonitic mine wastes, these arestockpiled around the mine area. Rio Tuba Nickel Mining CorpCBNC will process these stockpilesusing the technology called HPAL orhigh pressure acid leach.
  3. 3. HPP SIMPLIFIED FLOWSHEET Flash Demin H2 O Tanks Scrubber H2SO4Low grade nickel ore AUTOCLAVE 1.26 % Ni, 0.15 % Co HPAL 245oC, 4 Mpa Leached Slurry High Pressure Acid Leaching (HYDROMETALLURGICAL) Steam H2S CCD NiSO4,CoSO4 Limestone Lime Reactor Tails Dam Fe2O3,CaSO4, Cr2O3 NaOH Scrubber Other Solid Oxides And Hydroxides NiS,CoS Effluent 56 % Ni, 4.5 % Co
  4. 4. HPP LINE 1 (ECC granted July 10, 2002) PERFORMANCE AFTER 4 YEARS (April 2005 – April 2009) July, 2002 to August, 2004 – ConstructionAugust, 2004 to March, 2005 – Commissioning Ore Processed – 3,487,000 DMT April, 2005 – Start of Commercial Operation Ore Grade – 1.26 % Ni, .089 % Co Production – 37,700 DMT Ni & 2,800 DMT Co Annual Production Metal Recoveries – 87.2 %Ni, 84.9 % Co Employed – 2,125 (7.5% Female, 71.3 % Locals) 10,000 MT Nickel, 750 MT Cobalt Taxes Paid – Php 993 Million
  5. 5. HPP LINE 2 (ECC granted Feb. 1, 2007) COMBINED PRODUCTION CAPACITY June, 2006 to Jan. 2009 – Construction Designed: Feb. 2009 to May, 2009 – Commissioning Annual Nickel Production – 20,000 DMT/yrJune, 2009 – Start of Commercial Operation Annual Cobalt Production – 1,500 DMT/yr Annual Production Upgraded: Annual Nickel Production – 24,000 DMT/yr 10,000 MT Nickel, 750 MT Cobalt Annual Cobalt Production – 1,860 DMT/yr
  6. 6. Million US Dollars Line 1 Line 2Total Investment 200 308 Environmental ProtectionWastewater Treatment Facilities 9 10Air Pollution Control Facilities 6 15Tailings Dam Construction 5 26Total Million US $ (Percent) 20 (10) 51 (16)
  7. 7.  Environmental Protection and Enhancement Program (EPEP) Social Development and Management Program (SDMP) Final Mine Rehabilitation and Development Program (FMR/DP)
  8. 8. Particulars Requirements Compliance Remarks1. CLRF Php 5.25 M Now > Php 6 M At DBP in 20042. CAPEX on 10 % of Project 16% or Php 3.5B, InstalledPollution Control CAPEX of Php 25 B CAPEX modernFacilities facilities3. OPEX on 3-5% of Operating 18-20% or Php 1.2 - Used topPollution Control Costs 1.4 B/yr, of OPEX qualityFacilities materials4. MRFC 9 Members 10 Members Plus ERDS rep5. MMT 10 Members 16 (+ 4 samplers) Plus add’l 1MGB,1EMB,1 PCSD,2LGU and Church6. EMO 1 Officer (MEPEO) 1 Office of EMO Provided staff plus 10 staffs for all areas
  9. 9. Tailings Storage Facility Water Treatment
  10. 10. Pier Site Facilities Rio Tuba River Macadam Road RTN Townsite Airstrip
  11. 11. ELECTROSTATIC STACK PRECIPITATOR BOILER GENERATOR STACK STACK STACK HEATERS SCRUBBERSFLASH TANKS SCRUBBER AUTOCLAVE
  12. 12. Particulars Parameters Standards Actual1. Effluent Siltation pH @ 6.5 – 9.0 8.0 – 8.5 Qualities pond TSS < 70 mg/L < 10 effluent Temperature < 3 deg C rise < 1 deg C Oil and grease < 5 mg/L < 1.0 Cr +6 < .2 mg/L < .15 Pb < .3 mg/L < .05 Tailings pH @ 6.0 – 9.0 8.0 – 8.5 dam TSS < 150 mg/L < 10 supernatant Temperature < 3 deg C rise < 1 deg C Oil and grease < 5 mg/L < 1.0 Cr +6 < .2 mg/L < .15 Pb < .3 mg/L < .05Notes:a) Quality of water from the pond and dam are well within the standards.b) As, Hg and Cd contents are also analyzed and are below detection levels.
  13. 13. Particulars Parameters Standards Actual2. Air Plant CO < 500 mg/Ncm 60-100 Qualities Emissions NOx < 1,000 mg/Ncm 60-100 SOx < 700 mg/Ncm 60-80 Opacity < 20 Percent 10-15 H2S < 7mg/Ncm <1 Acid mist < .3 mg/Ncm <.07 Ambient Air TSP, at plant < 300ug/Ncm 50-250 TSP, at houses < 230ug/Ncm 10-150 Noise, at plant < 85 Decibels 60-75 Noise, at houses < 60 Decibels 45-50Notes:a) Actual air quality considerably lower than maximum allowable levels.b) Monitoring done in plant site (for source specific standards) and populated areas (for ambient air quality standards).
  14. 14. Continuous Monitoring Systems D C S CEMS CEMS pH, H2S Detectors H2SCO, Nox, SOx, Opacity Temp
  15. 15. Marine Waters 24 HR TSP samplerInland Waters NO2, SO2 Acid sampler mist sampler
  16. 16. Annual CoastalResources AssessmentFindings:A healthy marine ecosystem wasmaintained at the primary impact zoneof CBNC’s coastal operations.Regular patrol prevented illegalfishing practices and kept the area as ade-facto sanctuary.
  17. 17. Trestle pile with soft coralsTrestle area teeming with fishes
  18. 18. The results of the study showed thatthe flora and vegetation within theproject site and its vicinities are stillintact. Generally the type of vegetationis secondary forest in a large extent,grassland and a disturbance issomewhat minimal and considered asinsignificant considering theparameters used by the monitoring andassessing team. Generally the type ofvegetation is secondary forest in a largeextent, grassland and brushlandformation which is dominated by thepioneer species. In some observationsagricultural areas and agroforest wereobserved including old follow orabandoned kaingin.The dominant plant form around thearea is trees followed by herbs, vinesand shrubs.
  19. 19. pH? ppm? mg/L?Biodiversity? We just want to know if the fish,the birds, the bees, the animals, and people will not die!
  20. 20. Bees as Air Quality Bio-Indicators
  21. 21. Fish (Fresh and Salt Water) as Water Bio-Indicators
  22. 22. For TESTING........For TASTING........
  23. 23. TREE BUFFERPLANTING ZONE CBNC Personnel And Contractors
  24. 24. Mangrove Planting at Nagoya Beach Area Eastern side of causeway Western side of causeway
  25. 25. Vermi-compostingproject toproduceorganicfertilizer
  26. 26. By: BMP Environment and Community Care, Inc. June 16-19, 2006 Site Visit
  27. 27. bmp E NVIRONMENT & COMMUNITY CARE, INC.“The Environmental Audit highlighted the HPP Project’s REMARKABLE the HPP Project’s remarkable COMPLIANCE with conditions of the compliance with the the conditions of the Environmental ComplianceEnvironmental Compliance Certificate.Certificate. Of the 33 major and 8 sub- Of the 33 major conditions conditionsand 8 sub-conditions, 40 conditions hadconditions, only 4 major Full Compliance (98 % Performance).Partial Compliance and the rest had Full Compliance.”
  28. 28. Particulars Requirements Compliance Commitment Remarks1. Financial > 1 % of Direct 1. 02%, or P149 M 1. 00%, or P439 M 2.9 times higherAllocations Processing Cost for SDMP 1 for SDMP 2 (for CBNC) (2004-2008) (2009-2013) > 1 % of Gross 1.12 %, or P103 M 1.68 %, or P177 M 1.7 times higher Rev./Direct for SDMP 1 for SDMP 2 Mining Cost (2004-2008) (2009-2013) (for RTNMC)2. Community Com-Rel Sections Com-Rel Sections ComplianceOrganizational Relations Office created to monitor created to monitorRequirement Rio Tuba Nickel Rio Tuba Nickel Implementor Foundation Inc. Foundation Inc.3. Coverage 5 Host and 5 5 Host and 6 5 Host and 6 Additional brgy Neighboring Neighboring Neighboring of MNLF rebel Barangays Barangays Barangays returnees Interested ICCs Twelve (12 ) ICCs Twenty four (24) Double pro- ICCs mining group
  29. 29. SDMP COVERAGE OR IMPACT AREAS
  30. 30. SDMP COVERAGE OR IMPACT AREASNon- IP Communities : 11IP Communities : 24
  31. 31. SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM SDMP I Expenses vs SDMP II Budget COMBINED CBNC/RTNMC SDMP I SDMP II 2004-2008 2009-2013ITEM PARTICULARS Expenses Share Budget Share Million Php Percent Million Php PercentA Legal obligation (>1% of DMMC) 238.16 1.00 544.38 1.00D Total Social Development Program 251.83 1.06 615.91 1.13
  32. 32. SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM SDMP I Expenses vs SDMP II Budget COMBINED CBNC/RTNMC SDMP I SDMP II 2004-2008 2009-2013ITEM PARTICULARS Expenses Share Budget Share Million Php Percent Million Php PercentA Legal obligation (>1% of DMMC) 238.16 1.00 544.38 1.00B Social Development Expenses/Budgets 1 RTNFI Hospital Services for Non-dependents 57.38 0.24 70.00 0.13 2 LSVMS School Subsidies for Non-dependents 48.62 0.20 60.00 0.11 3 Community Relations Assistance 14.00 0.06 70.00 0.13 4 Gawad Kalinga Housing 10.00 0.04 50.00 0.09 5 Indigenous Learning System 6.00 0.02 30.00 0.06C SDMP Proper 6.1 SDMP I - Community Development (Todate) 95.43 0.40 6.2 SDMP II - Community Development (New) 289.72 0.53 7 SDMP II -Training and IEC 20.40 0.09 46.19 0.08D Total Social Development Program 251.83 1.06 615.91 1.13
  33. 33. SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM SDMP I Expenses vs SDMP II Expenses COMBINED CBNC/RTNMC SDMP I SDMP II 2004-2008 1st Year - 2009ITEM PARTICULARS Expenses Share Expenses Share Million Php Percent Million Php PercentA Legal obligation (>1% of DMMC) 238.16 1.00 78.47 1.00B Social Development Expenses/Budgets 1 RTNFI Hospital Services for Non-dependents 57.38 0.24 22.28 0.28 2 LSVMS School Subsidies for Non-dependents 48.62 0.20 14.60 0.19 3 Community Relations Assistance 14.00 0.06 15.23 0.19 4 Gawad Kalinga Housing 10.00 0.04 7.11 0.09 5 Indigenous Learning System 6.00 0.02 6.83 0.09C SDMP Proper 6.1 SDMP I - Community Development (Balance) 95.43 0.40 2.58 0.03 6.2 SDMP II - Community Development (New) 50.01 0.64 7 SDMP II -Training and IEC 20.40 0.09 18.08 0.23D Total Social Development Program 251.83 1.06 136.70 1.74
  34. 34. RTNFOUNDATION, INC. HOSPITAL Number of patientsStatus : Primary Hospital 40000 38015 31279Workforce : 38 Staff 30000 Doctors : 9 19228 20000 Nurses : 14 Other Staff: 15 10000 0 2007 2008 2009
  35. 35. Leonides S. Virata Memorial SchoolStatus : Private school, supervised by De La Number of Students Salle University, Bacolod City 1260 1252 1240 1233Workforce : 52 staff 1220 a. School Principal : 1 1200 1188 b. Primary & Elementary Faculty: 25 1180 c. Secondary : 17 d. Other Staff : 9 1160 1140 SY 07-08 SY 08-09 Sy 09-10
  36. 36. Indigenous Learning System (ILS) Concept : Arnold Jansen Catholic Enrolment Profile (06-09) Mission Foundation 09-10 Implementor: St. Jude’s Parish, SVD Order 08-09 Level 3 Levels: Level 1: Non-literate Level 2 07-08 Level 1 Level 2: Elementary undergraduate No. of sites Level 3: Secondary undergraduate 06-07 Work force: 14 staff 0 100 200 300
  37. 37. Gawad Kalinga Aim : 1,000 houses in 10 years 2009 : 100 houses turned over Established sites Sites being developed Site Dev’t. Programs (Sibol, Sagip, Productivity, Orderliness, Health, Neighborliness, & Cleanliness) Workforce: 5 Volunteers: 30
  38. 38. GK Concept + The IPs “SWEAT” Equity CBNC/RTNMC Funding (At least 1000 manhours)(Php 100 M = 1000 houses)
  39. 39. Gawad Kalinga – Kulantuod 35 Units
  40. 40. Gawad Kalinga – Bongkol-Bongkol 48 Units
  41. 41. Gawad Kalinga – Ocayan 17 Units
  42. 42. SDMP I Accomplishments (2004-2008)Infrastructure: Social Services: 16 Day Care Center  20 Medical Outreach 11 Health Center  1 unit Ambulance 13 Tribal Hall  1 unit Fire Truck 30 Road construction and repair  2 units Pick-up 2 Gymnasium  11 Multi-cab 3 Public library  14 Motorcycle with sidecar 3 Irrigation system  19 Generator set 26 Multi-purpose pavement  62 Petromax 18 Church & Mosque repair  65 ICOM radio 13 Other communal building  26 Cellular phone  2 Water system  15 Water tank  115 Jetmatic pump
  43. 43. SDMP I Accomplishments (2004-2008) Livelihood: SUMMARY OF SCHOLARS NON-IP IP TOTAL No. of Grads 2005-2006  13 Handtractors w/trailers College High School 82 41 29 66 111 107  10 Fishing boats Elementary 11 71 82  37 Carabaos 134 166 300 2006-2007  17 Cows College 131 48 179 11  113 Swine High School 74 95 169 33 170 203  4 Trainings & Seminars Elementary 238 313 551 11  12 Cooperatives funded 2007-2008 College 153 56 209 27 Education: High School Elementary 86 36 119 170 205 206 275 345 620 27 2008-2009  Scholarship Program College 161 37 198 39  7 School buildings constructed High School 82 123 205  14 Classrooms constructed Elementary 21 264 167 327 188 591 39  2 Classrooms repaired TOTAL NO. OF COLLEGE GRADUATES 77
  44. 44. INFRASTRUCTURE PROJECTS
  45. 45. LIVELIHOOD PROJECTS
  46. 46. COMMUNITY SERVICES
  47. 47. OTHER COMMUNITY SERVICES
  48. 48. EDUCATIONAL ASSISTANCESDMP scholars during a team building seminar. 77 graduated. Some of the 7 school buildings, 14 classrooms constructed.
  49. 49. SDMP II Accomplishments (2009) Infrastructure:  1 Road Concreting  2 Construction of Bridges  1 Tribal Hall  7 Road improvements  2 Bahay Tarukan  1 Basketball Court  2 Barangay Hall Improvement  2 School Bldg. Construction  1 School Bldg. Repair  2 School Stage
  50. 50. SDMP II Accomplishments (2009)Social Services: 4 units Hi-Lux Vehicle 2 units Ford Everest 1 unit Ford Ranger 4 units Sarao Jeepney 11 Jetmatic pump installed 8 Grass trimmers ICOM radio 222 units Cellular phones 2 units Typewriter 27 units Mountain Bikes 27 units Motorcycle (5 TMX; 22 XRM) 3 sets of Books Funding of various activities & celebrations 26 Churches/Mosque assisted 70 Families Assisted (Medical/Calamity) 1 unit Laptop (Lenovo) 2 units Canon digital camera 1 set Musical instruments 2 sets Sound System 19 units Generator set & electrical materials
  51. 51. SDMP II Accomplishments (2009)
  52. 52. SDMP II Accomplishments (2009) Livelihood:  86 units Spraycan  3 Fishing boats & accessories  6 units Hand tractors  72 heads Carabaos  15 sacks Urea  21 quarts Cymbush  15 sacks 16-20  70 pieces Shovel  10 pieces Hoe  52 units Plough & Harrow
  53. 53. SDMP II Accomplishments (2009) Education: 2,316 Elem. pupils assisted 84 Elementary Scholar 243 High School Scholar 214 College Scholar 10 Lakbay-Aral Trips 8 Annual Convention Attended
  54. 54. RTN FOUNDATION, INC.Garnierite Avenue, RTNMC Town site, Rio Tuba, Bataraza, Palawan 5306Mobile No.: 09175750135
  55. 55. Particulars Requirements Compliance Remarks1. Financial Php 106 Million To implement Approved by Budget within 10 years MGB on Dec. after closure. 14, 20092. Coordination Must align with After MGB LGU still with LGU their CLUP approval. preparing their CLUP3. Fund To be deposited in To comply. MGB Allocation a gov’t-assigned requirement bank for 7 years, from 2012 to 2019
  56. 56. HPP Project Area End-of-Project Land Site (ha) UseHPP Complex 35 ForestlandTailings Dam 1&2 Impoundment 187 Industrial tree plantation area Embankments 29 Reconstructed shrublandWater storage 28 AquacultureSanitary Landfill 4 Sports ground or public open spacePort area 36 Coconut landincludingcauseway
  57. 57. Environmental Management Office
  58. 58. Daghang Salamat, Arigato Guzaimasu, Maraming Salamat Po!

×