SlideShare a Scribd company logo
1 of 11
Download to read offline
Attachment
                    To the decision of the City Councilon
                                      December 25, 2012




          THE CONCEPT OF
KREMENCHUK "CENTRAL" INDUSTRIAL PARK
The concept of Industrial Park

1. Name of Industrial Park: Kremenchuk "Central" Industrial Park

2. The initiator of Industrial Park: Kremenchug City Council, "Kremenchug
Center for International Relations and Economic Development "Kremenchug
Invest".

3. The goal, objective and functional purpose of Industrial Park:
        The goal of Kremenchuk "Central" Industrial Park is to ensure economic
development and competitiveness of Kremenchuk city, stimulate investment, job
creation, development of modern industrial and market infrastructure.
        Development of Industrial Park will play an important role in meeting the
needs of domestic and foreign investment companies. The Industrial Park will
mainly employ local citizens. Industrial Park in Kremenchuk have regional
significance and will have an impact on the development of Poltava region
industry.
        The creation of Industrial Park will solve such problems of local importance:
        1. Create new production capacity through innovative technology with a
high level of competitiveness.
        2. Develop a social and cultural infrastructure of the city.
        3. Revive investment activity.
        4. Reduce unemployment by creating new jobs.
        5. Promote the development of small and medium-sized, mostly innovation
business.
        6. Increase export potential.
        7. Market saturation of new national competitive products.
        8. Improving the prosperity and living standards of the population.
        Functional purpose:
        Creation of Industrial Park includes detailed building of allotted land with
facilities of modern engineering and transport infrastructure for placement of
manufacturing, warehouse and administrative buildings.
        Land may be leased or purchased. Profit from companies, incorporated
under the Industrial Industrial Park, will ensure return on investment.

      4. The location and size of the land:

      Land for the establishment and functioning of the Kremenchuk "Central"
Industrial Park located in northern industrial area bounded by lands of North
industrial unit - Kahamlytska station - railways Kryukiv - Kremenchuk.
      Roads: On the west side of land (approximately 100m) is str. Ernst
Thalmann, the expansion of which is provided by the general plan Kremenchuk
Approximately 4 km (M-03 Kyiv-Kharkiv-Dovzhanskiy (in Rostov-on-Don).
      Railway: Approximately 2.3 km to the Kremenchuk railway station. At a
distance of about 652 m there are railway access to the industrial enterprises
which are the subject of removal.
Distance to railway: railway runs along the land (railway station Kahamlytska-
200m)
        River access: Kremenchuk river port on the Flotska street and Kremenchuk
River Station are at the distance of 12 km.
        Total area: 168.55 ha;
        In accordance to the approved resolution of Kremenchuk City Council
session of 25.12.2007, the master plan of the city of Kremenchuk this land belongs
to the area of industrial and construction companies, municipal areas.
        According to the approved on the Kremenchuk City Council session
28.12.2010, the "Rules of Kremenchuk city building" area refers to the area of
promising ecological safe and industrial facilities, facilities for small and medium
business, scientific, industrial facilities, warehouses and bases objects municipal
facilities (according to urban studies or other planning documentation).
        The land partially falls in the buffer zone of industrial and noise protection
railway zone. On Southeast and western (from the. E.Telman street) side areas
communication networks are located. Partially network data included in the scope
of land (from the E.Telman street). Partially provide landscaping specials. Special
landscaping should also be provided.

      5. Approximate term for the established Industrial Park: 30 years;

      6. Requirements for the participants of Industrial Park:
          Creating a legal entity, separate units (branches, representative
            offices).
          The company must be profitable.
          Minimum new jobs created - 20.
          Comply with of current tax, labor, environmental legislation.
          Having a plan of the enterprise development for at least 5 years.
          Predicting positive economic and social effects of the project.

      7. The estimated total consumption of energy, water, etc.:
  1. gas
Q = 28046720 x 1,3 = 36,460,736 m3/year
  2. Electricity
Q = 33710 * 1.4 = 47.194 MW
  3. Water
Q = (168.55 + 10) x 1,3 =up to 232.12 l/sec
  4. Wastewater:
Q = 168,55 x 1,3 = up to 219.12 l/sec
  5. Surface water
Q = 7079,1+ 0,2 = 7079,3 l/sec
Water supply: 163 m d-600mm, 137m d-200;
Sewerage: 164m d-300 mm;
Gas supply: 149 m d-150 mm;
Power supply: 107 m;
8. Development plan of the Industrial Park:
       Within the Industrial Park placement of office and business and office-
laboratory complex – “Business City” is planned, which may include free office
planning, ceremonies halls, press center, meeting room, data-center, branch
banking, post office, cafe or dining room, printing center, business hotel, outdoor
and underground parking. The Kremenchuk "Central" Industrial Park is divided
into 5 sectors of economic activity areas:

      Sektor 1 - «Hi-Tech» ...................................................................... 50,05 ha
      (direction of economic activity - engineering):
Instrumentation facility placement, engineering and other areas of production,
created through the introduction of new technologies.
 The approximate size of the expected investments - $ 150 million.
Estimated number of jobs created - 1250 people.

      Sector 2 - «Logistics» .................................................................... 19.76 ha
      (direction of economic activity - Logistics):
Warehousing and packing buildings, automobile companies and customs
warehouses.
The approximate size of the expected investment - $ 60 million.
Estimated number of jobs created - 510 people.

       Section 3 - «TechnoPolis» .............................................................. 27.35 ha
(direction economical. activity - IT technology and electronics):
Platform for development of advanced information and telecommunications
technology and nanotechnology, electronics manufacturing.
The approximate size of the expected investments - 82 million.
Estimated number of jobs created - 680 people.

       Sector 4 - «EcoLife» ........................................................................ 26,78 ha
(direction of economic activity - food and processing industry):
Food and processing industry, enterprise development and manufacture of high-
tech medical devices, biotechnology and pharmaceuticals.
The approximate size of the expected investment - $ 80 million.
Estimated number of jobs created - 670 people.

Section 5 - "Energetics" .... ............................................................. 44.61 ha
(direction of economic activity - alternative energy and engineering):
Companies working in the field of energy efficiency and energy-saving
technologies, production tools and equipment. Agricultural machinery
manufacture.
The approximate size of the expected investments - 130 million.
Estimated number of jobs created - 1115 people.

      9. The estimated resources required for the establishment and operation
of the Industrial Park, expected sources of their involvement.
According to preliminary calculations of Poltava Regional Center of Investment
and Development to create partial Infrastructure of Kremenchuk "Central"
Industrial Park it is needed about $ 3.2 million. For a complete infrastructure of
Industrial Park it is needed about $ 20 million. Anticipated sources of funding:
state, regional, municipal budgets, funds of investors and donors.

      10. Organizational model of Industrial Park;

       Position                                    Duties
  Head                 1. Resolve issues between business entities and local
                       government.
                       2. Attract foreign investors and collaborates with members
                       of the industrial park.
  Jurisconsult         1. Provides advice on preparing the necessary
                       documentation.
                       2. Regulating land relations.
                       3. Organize competitions on sale (lease) of land.
  Engineer             1. Promote industrial park.
                       2. Organize process of engineering equipment at the site of
                       the industrial park, construction of routes, territory fence,
                       solve land issues.

   11. Expected results of Industrial Park operation:
    Increase the amount and quality of foreign direct investment in real
      economy, necessary to ensure dynamic economic development of
      Kremenchuk;
    Increase economic productivity of the city;
    Create new jobs with potential of training of local citizens;
    Increase opportunities for local small and medium enterprises with the
      introduction of new production needs and relationships, creation of
      engineering and transport infrastructure for business;
    Increase lifelevel and social protection of citizens.


Director of Kremenchuk center
of investment and
city development "Kremenchuk Invest"                             Melnik А. V.


Approved
Vice Mayor                                                       Pohribnyi A.M.

Concept developers: APIBD, Kremenchuk center of investment and city
development "Kremenchuk Invest"

Advisory assistance: Poltava Regional Center of Investment and Development
The area plan of Kremenchuk "Central" Industrial Park (top view)




Kremenchuk "Central" Industrial Park building plan (Perspective)
Placement of solar panels modules on the roofs of industrial buildings.
Placement of solar panels modules on the roofs of industrial buildings.
Acting Director of "Kremenchuk Center
of International Relations and
Economic Development
"Kremenchug Invest"

Bulik K.M.



APPROVED:

Vice Mayor
Pohribnyi A.M.

More Related Content

Similar to Industrial Park Plan

Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproYaroslav Yaroshenko
 
Presentation "Aurora Park" multifunctional high-tech campus english
Presentation "Aurora Park" multifunctional high-tech campus englishPresentation "Aurora Park" multifunctional high-tech campus english
Presentation "Aurora Park" multifunctional high-tech campus englishbelinpark
 
Innopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of RussiaInnopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of RussiaDerrick Staten
 
Shekou Development Plan 2011-2020
Shekou Development Plan 2011-2020Shekou Development Plan 2011-2020
Shekou Development Plan 2011-2020shenzhenparty
 
Presentation of investment potential of Astana
Presentation of investment potential of AstanaPresentation of investment potential of Astana
Presentation of investment potential of AstanaAlzhan Nurtaza
 
липатова дарья. наноцентра конструкционных материалов
липатова дарья. наноцентра конструкционных материаловлипатова дарья. наноцентра конструкционных материалов
липатова дарья. наноцентра конструкционных материаловVeeRoute
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproYaroslav Yaroshenko
 
Waste management perspectives_ in st.petersburg
Waste management perspectives_ in st.petersburgWaste management perspectives_ in st.petersburg
Waste management perspectives_ in st.petersburgTeam Finland Future Watch
 
Environment Protection and Regulations in Industrial Cluster (IC) Development...
Environment Protection and Regulations in Industrial Cluster (IC) Development...Environment Protection and Regulations in Industrial Cluster (IC) Development...
Environment Protection and Regulations in Industrial Cluster (IC) Development...AI Publications
 
2012 11-20 industrial parks of ukraine brief
2012 11-20 industrial parks of ukraine brief2012 11-20 industrial parks of ukraine brief
2012 11-20 industrial parks of ukraine briefPeter Koshukov
 
Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)guest5aac0e
 
Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)guest5aac0e
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproYaroslav Yaroshenko
 
Project portfolio Rinat Sakhipov
Project portfolio Rinat SakhipovProject portfolio Rinat Sakhipov
Project portfolio Rinat SakhipovRinatSakhipov
 

Similar to Industrial Park Plan (20)

Prezentatsiia 2021 19.05._--_buklet_eng
Prezentatsiia 2021 19.05._--_buklet_engPrezentatsiia 2021 19.05._--_buklet_eng
Prezentatsiia 2021 19.05._--_buklet_eng
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
 
Presentation "Aurora Park" multifunctional high-tech campus english
Presentation "Aurora Park" multifunctional high-tech campus englishPresentation "Aurora Park" multifunctional high-tech campus english
Presentation "Aurora Park" multifunctional high-tech campus english
 
Innopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of RussiaInnopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of Russia
 
Shekou Development Plan 2011-2020
Shekou Development Plan 2011-2020Shekou Development Plan 2011-2020
Shekou Development Plan 2011-2020
 
METRIC v14.8.6
METRIC v14.8.6METRIC v14.8.6
METRIC v14.8.6
 
District industrial estates
District  industrial  estatesDistrict  industrial  estates
District industrial estates
 
20140403 IP eng
20140403 IP eng20140403 IP eng
20140403 IP eng
 
Presentation of investment potential of Astana
Presentation of investment potential of AstanaPresentation of investment potential of Astana
Presentation of investment potential of Astana
 
липатова дарья. наноцентра конструкционных материалов
липатова дарья. наноцентра конструкционных материаловлипатова дарья. наноцентра конструкционных материалов
липатова дарья. наноцентра конструкционных материалов
 
Strategic Investment Projects in Kazakhstan
Strategic Investment Projects in KazakhstanStrategic Investment Projects in Kazakhstan
Strategic Investment Projects in Kazakhstan
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
 
Waste management perspectives_ in st.petersburg
Waste management perspectives_ in st.petersburgWaste management perspectives_ in st.petersburg
Waste management perspectives_ in st.petersburg
 
Environment Protection and Regulations in Industrial Cluster (IC) Development...
Environment Protection and Regulations in Industrial Cluster (IC) Development...Environment Protection and Regulations in Industrial Cluster (IC) Development...
Environment Protection and Regulations in Industrial Cluster (IC) Development...
 
2012 11-20 industrial parks of ukraine brief
2012 11-20 industrial parks of ukraine brief2012 11-20 industrial parks of ukraine brief
2012 11-20 industrial parks of ukraine brief
 
Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)
 
Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)Investment Projects Of Icbc Khorgos (Presentation)
Investment Projects Of Icbc Khorgos (Presentation)
 
How to ensure market ready property for industrial investors?
How to ensure market ready property for industrial investors?How to ensure market ready property for industrial investors?
How to ensure market ready property for industrial investors?
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
 
Project portfolio Rinat Sakhipov
Project portfolio Rinat SakhipovProject portfolio Rinat Sakhipov
Project portfolio Rinat Sakhipov
 

More from Poltava Regional Center of Investment and Development

стратСЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткуегія на ...
стратСЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткуегія на ...стратСЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткуегія на ...
стратСЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткуегія на ...Poltava Regional Center of Investment and Development
 
СЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткустратегія на ...
СЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткустратегія на ...СЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткустратегія на ...
СЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткустратегія на ...Poltava Regional Center of Investment and Development
 

More from Poltava Regional Center of Investment and Development (20)

Strategic development plan
Strategic development planStrategic development plan
Strategic development plan
 
Strategic development plan
Strategic development planStrategic development plan
Strategic development plan
 
Стратегічний план розвитку
Стратегічний план розвиткуСтратегічний план розвитку
Стратегічний план розвитку
 
стратСЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткуегія на ...
стратСЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткуегія на ...стратСЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткуегія на ...
стратСЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткуегія на ...
 
СЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткустратегія на ...
СЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткустратегія на ...СЕЛО МАЛЮТИНЦІ  Пирятинського району  Стратегічний план розвиткустратегія на ...
СЕЛО МАЛЮТИНЦІ Пирятинського району Стратегічний план розвиткустратегія на ...
 
інвестпаспорт полтавської обл 2
інвестпаспорт полтавської обл 2інвестпаспорт полтавської обл 2
інвестпаспорт полтавської обл 2
 
инвест полт обл рус 2
инвест полт обл рус 2инвест полт обл рус 2
инвест полт обл рус 2
 
Investment passport of poltava oblast 2
Investment passport of poltava oblast 2Investment passport of poltava oblast 2
Investment passport of poltava oblast 2
 
3
3 3
3
 
2
2 2
2
 
1
1 1
1
 
4
4 4
4
 
инвест полт обл
инвест полт облинвест полт обл
инвест полт обл
 
poltava
poltavapoltava
poltava
 
інвестпаспорт полтавської обл
інвестпаспорт полтавської облінвестпаспорт полтавської обл
інвестпаспорт полтавської обл
 
Journal 1 2013_en
Journal 1 2013_enJournal 1 2013_en
Journal 1 2013_en
 
Journal 1 2013_ru
Journal 1 2013_ruJournal 1 2013_ru
Journal 1 2013_ru
 
Postanova industrialparks ukr
Postanova industrialparks ukrPostanova industrialparks ukr
Postanova industrialparks ukr
 
Investment atlas2013(ukr)
Investment atlas2013(ukr)Investment atlas2013(ukr)
Investment atlas2013(ukr)
 
Potential of poltava region it industry market eng
Potential of poltava region it industry market engPotential of poltava region it industry market eng
Potential of poltava region it industry market eng
 

Industrial Park Plan

  • 1. Attachment To the decision of the City Councilon December 25, 2012 THE CONCEPT OF KREMENCHUK "CENTRAL" INDUSTRIAL PARK
  • 2. The concept of Industrial Park 1. Name of Industrial Park: Kremenchuk "Central" Industrial Park 2. The initiator of Industrial Park: Kremenchug City Council, "Kremenchug Center for International Relations and Economic Development "Kremenchug Invest". 3. The goal, objective and functional purpose of Industrial Park: The goal of Kremenchuk "Central" Industrial Park is to ensure economic development and competitiveness of Kremenchuk city, stimulate investment, job creation, development of modern industrial and market infrastructure. Development of Industrial Park will play an important role in meeting the needs of domestic and foreign investment companies. The Industrial Park will mainly employ local citizens. Industrial Park in Kremenchuk have regional significance and will have an impact on the development of Poltava region industry. The creation of Industrial Park will solve such problems of local importance: 1. Create new production capacity through innovative technology with a high level of competitiveness. 2. Develop a social and cultural infrastructure of the city. 3. Revive investment activity. 4. Reduce unemployment by creating new jobs. 5. Promote the development of small and medium-sized, mostly innovation business. 6. Increase export potential. 7. Market saturation of new national competitive products. 8. Improving the prosperity and living standards of the population. Functional purpose: Creation of Industrial Park includes detailed building of allotted land with facilities of modern engineering and transport infrastructure for placement of manufacturing, warehouse and administrative buildings. Land may be leased or purchased. Profit from companies, incorporated under the Industrial Industrial Park, will ensure return on investment. 4. The location and size of the land: Land for the establishment and functioning of the Kremenchuk "Central" Industrial Park located in northern industrial area bounded by lands of North industrial unit - Kahamlytska station - railways Kryukiv - Kremenchuk. Roads: On the west side of land (approximately 100m) is str. Ernst Thalmann, the expansion of which is provided by the general plan Kremenchuk Approximately 4 km (M-03 Kyiv-Kharkiv-Dovzhanskiy (in Rostov-on-Don). Railway: Approximately 2.3 km to the Kremenchuk railway station. At a distance of about 652 m there are railway access to the industrial enterprises which are the subject of removal.
  • 3. Distance to railway: railway runs along the land (railway station Kahamlytska- 200m) River access: Kremenchuk river port on the Flotska street and Kremenchuk River Station are at the distance of 12 km. Total area: 168.55 ha; In accordance to the approved resolution of Kremenchuk City Council session of 25.12.2007, the master plan of the city of Kremenchuk this land belongs to the area of industrial and construction companies, municipal areas. According to the approved on the Kremenchuk City Council session 28.12.2010, the "Rules of Kremenchuk city building" area refers to the area of promising ecological safe and industrial facilities, facilities for small and medium business, scientific, industrial facilities, warehouses and bases objects municipal facilities (according to urban studies or other planning documentation). The land partially falls in the buffer zone of industrial and noise protection railway zone. On Southeast and western (from the. E.Telman street) side areas communication networks are located. Partially network data included in the scope of land (from the E.Telman street). Partially provide landscaping specials. Special landscaping should also be provided. 5. Approximate term for the established Industrial Park: 30 years; 6. Requirements for the participants of Industrial Park:  Creating a legal entity, separate units (branches, representative offices).  The company must be profitable.  Minimum new jobs created - 20.  Comply with of current tax, labor, environmental legislation.  Having a plan of the enterprise development for at least 5 years.  Predicting positive economic and social effects of the project. 7. The estimated total consumption of energy, water, etc.: 1. gas Q = 28046720 x 1,3 = 36,460,736 m3/year 2. Electricity Q = 33710 * 1.4 = 47.194 MW 3. Water Q = (168.55 + 10) x 1,3 =up to 232.12 l/sec 4. Wastewater: Q = 168,55 x 1,3 = up to 219.12 l/sec 5. Surface water Q = 7079,1+ 0,2 = 7079,3 l/sec Water supply: 163 m d-600mm, 137m d-200; Sewerage: 164m d-300 mm; Gas supply: 149 m d-150 mm; Power supply: 107 m;
  • 4. 8. Development plan of the Industrial Park: Within the Industrial Park placement of office and business and office- laboratory complex – “Business City” is planned, which may include free office planning, ceremonies halls, press center, meeting room, data-center, branch banking, post office, cafe or dining room, printing center, business hotel, outdoor and underground parking. The Kremenchuk "Central" Industrial Park is divided into 5 sectors of economic activity areas: Sektor 1 - «Hi-Tech» ...................................................................... 50,05 ha (direction of economic activity - engineering): Instrumentation facility placement, engineering and other areas of production, created through the introduction of new technologies. The approximate size of the expected investments - $ 150 million. Estimated number of jobs created - 1250 people. Sector 2 - «Logistics» .................................................................... 19.76 ha (direction of economic activity - Logistics): Warehousing and packing buildings, automobile companies and customs warehouses. The approximate size of the expected investment - $ 60 million. Estimated number of jobs created - 510 people. Section 3 - «TechnoPolis» .............................................................. 27.35 ha (direction economical. activity - IT technology and electronics): Platform for development of advanced information and telecommunications technology and nanotechnology, electronics manufacturing. The approximate size of the expected investments - 82 million. Estimated number of jobs created - 680 people. Sector 4 - «EcoLife» ........................................................................ 26,78 ha (direction of economic activity - food and processing industry): Food and processing industry, enterprise development and manufacture of high- tech medical devices, biotechnology and pharmaceuticals. The approximate size of the expected investment - $ 80 million. Estimated number of jobs created - 670 people. Section 5 - "Energetics" .... ............................................................. 44.61 ha (direction of economic activity - alternative energy and engineering): Companies working in the field of energy efficiency and energy-saving technologies, production tools and equipment. Agricultural machinery manufacture. The approximate size of the expected investments - 130 million. Estimated number of jobs created - 1115 people. 9. The estimated resources required for the establishment and operation of the Industrial Park, expected sources of their involvement.
  • 5. According to preliminary calculations of Poltava Regional Center of Investment and Development to create partial Infrastructure of Kremenchuk "Central" Industrial Park it is needed about $ 3.2 million. For a complete infrastructure of Industrial Park it is needed about $ 20 million. Anticipated sources of funding: state, regional, municipal budgets, funds of investors and donors. 10. Organizational model of Industrial Park; Position Duties Head 1. Resolve issues between business entities and local government. 2. Attract foreign investors and collaborates with members of the industrial park. Jurisconsult 1. Provides advice on preparing the necessary documentation. 2. Regulating land relations. 3. Organize competitions on sale (lease) of land. Engineer 1. Promote industrial park. 2. Organize process of engineering equipment at the site of the industrial park, construction of routes, territory fence, solve land issues. 11. Expected results of Industrial Park operation:  Increase the amount and quality of foreign direct investment in real economy, necessary to ensure dynamic economic development of Kremenchuk;  Increase economic productivity of the city;  Create new jobs with potential of training of local citizens;  Increase opportunities for local small and medium enterprises with the introduction of new production needs and relationships, creation of engineering and transport infrastructure for business;  Increase lifelevel and social protection of citizens. Director of Kremenchuk center of investment and city development "Kremenchuk Invest" Melnik А. V. Approved Vice Mayor Pohribnyi A.M. Concept developers: APIBD, Kremenchuk center of investment and city development "Kremenchuk Invest" Advisory assistance: Poltava Regional Center of Investment and Development
  • 6. The area plan of Kremenchuk "Central" Industrial Park (top view) Kremenchuk "Central" Industrial Park building plan (Perspective)
  • 7. Placement of solar panels modules on the roofs of industrial buildings.
  • 8. Placement of solar panels modules on the roofs of industrial buildings.
  • 9.
  • 10.
  • 11. Acting Director of "Kremenchuk Center of International Relations and Economic Development "Kremenchug Invest" Bulik K.M. APPROVED: Vice Mayor Pohribnyi A.M.