Streamlining Cleanup Decisions at the Filled Coal Ash Pond Oak Ridge Tennessee
Upcoming SlideShare
Loading in...5
×
 

Streamlining Cleanup Decisions at the Filled Coal Ash Pond Oak Ridge Tennessee

on

  • 142 views

This project received the National Pollution Engineering Award to USDOE for Eco-Sensitive Remediation

This project received the National Pollution Engineering Award to USDOE for Eco-Sensitive Remediation

Statistics

Views

Total Views
142
Views on SlideShare
142
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Streamlining Cleanup Decisions at the Filled Coal Ash Pond Oak Ridge Tennessee Streamlining Cleanup Decisions at the Filled Coal Ash Pond Oak Ridge Tennessee Document Transcript

  • Page 1 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 2 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 3 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 4 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 5 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 6 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 7 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 8 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 9 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 10 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013
  • Page 11 of 11 http://www.trumpetcall.org/resume/awma.htm 11/20/2013