Submit Search
Upload
33 service gate panel-1
•
0 likes
•
308 views
Nikhil Jaipurkar
Follow
Drawing
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 1
Recommended
29 stop log panel-1
29 stop log panel-1
Nikhil Jaipurkar
SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014
Nikhil Jaipurkar
Sample drawings (dpr)
Sample drawings (dpr)
Nikhil Jaipurkar
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Nikhil Jaipurkar
51 switchyard(2 of 2)
51 switchyard(2 of 2)
Nikhil Jaipurkar
49 single line diagram
49 single line diagram
Nikhil Jaipurkar
50 switchyard (1 of 2)
50 switchyard (1 of 2)
Nikhil Jaipurkar
43 penstock gate embedment-1
43 penstock gate embedment-1
Nikhil Jaipurkar
Recommended
29 stop log panel-1
29 stop log panel-1
Nikhil Jaipurkar
SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014
Nikhil Jaipurkar
Sample drawings (dpr)
Sample drawings (dpr)
Nikhil Jaipurkar
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Nikhil Jaipurkar
51 switchyard(2 of 2)
51 switchyard(2 of 2)
Nikhil Jaipurkar
49 single line diagram
49 single line diagram
Nikhil Jaipurkar
50 switchyard (1 of 2)
50 switchyard (1 of 2)
Nikhil Jaipurkar
43 penstock gate embedment-1
43 penstock gate embedment-1
Nikhil Jaipurkar
39 shingle gate embedment-1
39 shingle gate embedment-1
Nikhil Jaipurkar
23 diversion weir trash-1
23 diversion weir trash-1
Nikhil Jaipurkar
20 plan of power house
20 plan of power house
Nikhil Jaipurkar
19 plan & section of penstock
19 plan & section of penstock
Nikhil Jaipurkar
17 forebay plan
17 forebay plan
Nikhil Jaipurkar
10 section of tunnel (1 of 4)
10 section of tunnel (1 of 4)
Nikhil Jaipurkar
9 power channel - section
9 power channel - section
Nikhil Jaipurkar
14 desilting tank-plan & section details
14 desilting tank-plan & section details
Nikhil Jaipurkar
8 section of trench weir
8 section of trench weir
Nikhil Jaipurkar
7 plan of trench weir
7 plan of trench weir
Nikhil Jaipurkar
6 general layout of project (6 of 6)
6 general layout of project (6 of 6)
Nikhil Jaipurkar
1 general layout of project (1 of 6)
1 general layout of project (1 of 6)
Nikhil Jaipurkar
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
Nikhil Jaipurkar
Indicative budget for SHP development
Indicative budget for SHP development
Nikhil Jaipurkar
SHP development in India - A roadmap
SHP development in India - A roadmap
Nikhil Jaipurkar
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
Chandu841456
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
jennyeacort
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
ssuser7cb4ff
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
Madan Karki
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes examples
Dr. Gudipudi Nageswara Rao
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
irfanmechengr
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
sdickerson1
More Related Content
More from Nikhil Jaipurkar
39 shingle gate embedment-1
39 shingle gate embedment-1
Nikhil Jaipurkar
23 diversion weir trash-1
23 diversion weir trash-1
Nikhil Jaipurkar
20 plan of power house
20 plan of power house
Nikhil Jaipurkar
19 plan & section of penstock
19 plan & section of penstock
Nikhil Jaipurkar
17 forebay plan
17 forebay plan
Nikhil Jaipurkar
10 section of tunnel (1 of 4)
10 section of tunnel (1 of 4)
Nikhil Jaipurkar
9 power channel - section
9 power channel - section
Nikhil Jaipurkar
14 desilting tank-plan & section details
14 desilting tank-plan & section details
Nikhil Jaipurkar
8 section of trench weir
8 section of trench weir
Nikhil Jaipurkar
7 plan of trench weir
7 plan of trench weir
Nikhil Jaipurkar
6 general layout of project (6 of 6)
6 general layout of project (6 of 6)
Nikhil Jaipurkar
1 general layout of project (1 of 6)
1 general layout of project (1 of 6)
Nikhil Jaipurkar
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
Nikhil Jaipurkar
Indicative budget for SHP development
Indicative budget for SHP development
Nikhil Jaipurkar
SHP development in India - A roadmap
SHP development in India - A roadmap
Nikhil Jaipurkar
More from Nikhil Jaipurkar
(15)
39 shingle gate embedment-1
39 shingle gate embedment-1
23 diversion weir trash-1
23 diversion weir trash-1
20 plan of power house
20 plan of power house
19 plan & section of penstock
19 plan & section of penstock
17 forebay plan
17 forebay plan
10 section of tunnel (1 of 4)
10 section of tunnel (1 of 4)
9 power channel - section
9 power channel - section
14 desilting tank-plan & section details
14 desilting tank-plan & section details
8 section of trench weir
8 section of trench weir
7 plan of trench weir
7 plan of trench weir
6 general layout of project (6 of 6)
6 general layout of project (6 of 6)
1 general layout of project (1 of 6)
1 general layout of project (1 of 6)
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
Indicative budget for SHP development
Indicative budget for SHP development
SHP development in India - A roadmap
SHP development in India - A roadmap
Recently uploaded
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
Chandu841456
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
jennyeacort
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
ssuser7cb4ff
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
Madan Karki
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes examples
Dr. Gudipudi Nageswara Rao
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
irfanmechengr
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
sdickerson1
Earthing details of Electrical Substation
Earthing details of Electrical Substation
stephanwindworld
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
JasonTagapanGulla
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
VICTOR MAESTRE RAMIREZ
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
Nikhil Raut
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
RajuKanojiya4
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
Dr SOUNDIRARAJ N
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
VelmuruganTECE
Transport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
GOPINATHS437943
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
siddharthjain2303
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
ssuser2ae721
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
aditya806802
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
DILIPKUMARMONDAL6
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
Narmatha D
Recently uploaded
(20)
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes examples
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
Earthing details of Electrical Substation
Earthing details of Electrical Substation
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
Transport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt