Design of National Highway-13
Upcoming SlideShare
Loading in...5
×
 

Design of National Highway-13

on

  • 687 views

The horizontal alignment, vertical alignment and pavement were designed using MX Roads and survey data for NH-13.

The horizontal alignment, vertical alignment and pavement were designed using MX Roads and survey data for NH-13.

Statistics

Views

Total Views
687
Views on SlideShare
687
Embed Views
0

Actions

Likes
1
Downloads
18
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Design of National Highway-13 Design of National Highway-13 Presentation Transcript

  • MX Roads Design Project National Highway - 13 Group #5 CE10B021 Gaurav Agarwal CE10B082 Nijansh Verma CE10B090 Kumar Neelotpal Shukla CE10B091 Manish Kumar Shakya
  • Horizontal Alignment | Vertical Alignment | Carriageway & Super-elevation | Pavement Design Total 7 Intersection Points chosen. Design Speed: - taken as 100 kmph (Radius of Curve = 360 m) - changed to 65 kmph near obstacles (at IP 5 and IP 6) CE3010 | Transportation Engineering I 2
  • Horizontal Alignment | Vertical Alignment | Carriageway & Super-elevation | Pavement Design - Total 3 Intersection Points Chosen - Cut and Fill balanced by middle IP adjustment CE3010 | Transportation Engineering I 3
  • Horizontal Alignment | Vertical Alignment | Carriageway & Super-elevation | Pavement Design - Edited 4 lane divided Carriageway, Rural section used - Rule based super-elevation provided for design speed of 70 kmph CE3010 | Transportation Engineering I 4
  • CE3010 | Transportation Engineering I 5
  • Horizontal Alignment | Vertical Alignment | Carriageway & Super-elevation | Pavement Design Thickness as per IRC-37 (150 MSA Load and 5% CBR) CE3010 | Transportation Engineering I 6
  • CE3010 | Transportation Engineering I 7
  • Cost Analysis • Sample values*: – – – – – – – – Cut : 1000 Fill: 400 Seal Coat: 88320 Bituminous concrete: 12700 Tack coat: 14850 Dense Bituminous Macadam: 12400 Prime Coat: 16300 Granular Layers: 11200 • Total Cost: – Earthwork: 14 crore – Pavement: 33 crore *All values for 1 m3 of material CE3010 | Transportation Engineering I 8
  • Thank You CE3010 | Transportation Engineering I 9