Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
27
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Proposition K.I.D.S.S. - April 2, 2013Keep Improving District Schools and Safety
  • 2. $2.5 Million Bond Issue no tax increase• Prolongs the current debt from 24/25 to 32/33• Priorities for funds: – Middle School classrooms and security – High School new entry, renovations and security – 8-lane track – Multi-purpose synthetic field
  • 3. April vs. August Why Now?• April 2013 4/7ths = 57% vote• August 2013 2/3rds = 67% vote• Additional Cost for August election• Interest rates at all time low• Material cost increase• Safety and Security
  • 4. Additional Classrooms to Middle SchoolThis view shows the existing school facilities and the land ownedby the school district
  • 5. Proposed Middle School Classroom Addition and Security Upgrades 7th Grade 8th Grade Resource & 7 8 Sp. Ed. Areas 6 6th Grade1 2 3 Art Entry Security Expo Wing Upgrades 3-Classroom Addition for: •Careers •Computer Lab •Health
  • 6. Current layout of high school and football field
  • 7. High school with front door moved to Seymour Street and mock-up Auditorium Note the pedestrian walkway leading from the new entry at the high school down to the multipurpose complex.
  • 8. New High School Entry & Administrative OfficesNote – this is not the final mock-up. Moving the entry to Seymour will greatly improve safety forstudents before and after school. A single entry will also improve safety and security overall.
  • 9. One mockup of High School Entry & Offices Addition New Main Lobby Entry Connecting Office Corridor New ‘Welcome Center’ Offices & Secure 1 2 Admin. Vestibule Convert office areas to Classrooms
  • 10. A sample 8-lane regulation track with grass field
  • 11. A synthetic field would allow many organizations to use it
  • 12. This is a sample synthetic field which is striped black for soccer andwhite for football.
  • 13. PROPOSITION K.I.D.S.S. 2013Please remember to vote on April 2nd!