Operations Management
Toyota Production System (TPS),
Just-in-Time (JIT),
and Lean Manufacturing
Handout
Dr. Ahmad Syamil, CFPIM, CIRM, CSCP
http://www.clt.astate.edu/asyamil/
asyamil AT yahoo DOT com
APICS
www.apics.org
• Old Name: The American Production and Inventory Control Society
• New Name: The Association for Operations Management -
Advancing Productivity, Innovation, and Competitive Success.
• APICS offers four internationally recognized professional certification
programs:
1. CPIM: Certified in Production and Inventory Management
2. CFPIM: Certified Fellow in Production and Inventory Management =
CPIM + extensive knowledge sharing with others through presenting,
teaching, publishing, and other APICS educational activities.
3. CIRM: Certified in Integrated Resource Management
4. Beginning 2006: Certified Supply Chain Professional (CSCP) designation
is designed for professionals interested in increasing their knowledge of
supply chain management, those currently working in the field of supply
chain management (SCM), and for those individuals working with
enterprise resources planning (ERP) systems.
Why Toyota?
Toyota is now the world's largest
carmaker
• Toyota sold 2.348 million vehicles in the
first three months of 2007.
• General Motors (GM) is estimated to have
sold 2.26 million cars and small trucks
during the same period.
Why Toyota?
Why Toyota?
Why not Toyota?
• GM lost $10.6 billion in 2005.
• GM's pension obligations under funded by about $31
billion
• GM will eliminate 30,000 jobs and close 12 North
American factories by 2008
• Ford earned $2 billion worldwide, but lost $1.6 billion in
its North American operations.
• Ford is shutting 10 plants and laying off 25,000 hourly
workers.
• Daimler paid $36 billion for Chrysler in 1998.
• Chrysler reported a $1.5 billion loss for the third quarter of
2006 and a $2 billion loss for the first quarter of 2007.
• DaimlerChysler finally sold 80.1% of Chrysler to Cerberus
Capital for $7.4 billion in May of 2007.
Why Toyota?
History of Manufacturing Management
History• Sakichi Toyoda, the founder of the Toyota group of
companies, started Toyota as a textile machine
company.
• Kiichiro Toyoda, son of Sakichi and founder of the
Toyota automobile business, developed the concept
of Just-in-Time in the 1930s. He decreed that Toyota
operations would contain no excess inventory and
that Toyota would strive to work in partnership with
suppliers to level production.
• Taiichi Ohno, Toyota's chief of production in the post-
WWII period. He was THE main developer of Toyota
Production System (TPS).
• Dr. Shigeo Shingo: A consultant to Toyota.
PS: Shingo Prize is the highest manufacturing
excellence award in the U.S. The prize is given both
to companies and individuals who contribute to the
History (cont.)
• Toyota Production System (TPS) drew wide attention from the industrial
community because Toyota was a profitable car company in Japan
during and after the oil embargo in 1970s.
• Outside Japan, dissemination began in earnest with the creation of the
Toyota-General Motors joint venture-NUMMI (New United Motor
Manufacturing Inc.) in California in 1984.
• Widespread recognition of TPS as the model production system grew
rapidly with the publication in 1990 of The Machine That Changed the
World: The Story of Lean Production, the result of five years of
research led by the Massachusetts Institute of Technology.
• The MIT researchers found that TPS was so much more effective and
efficient than traditional, mass production that it represented a
completely new paradigm and coined the term lean production to
indicate this radically different approach to production.
• The term was coined by John Krafcik, a research assistant at MIT with
the International Motor Vehicle Program in the late 1980s. He then
worked for General Motors and now is a Vice President of Hyundai,
U.S.
Toyota Production System (TPS)
• Definition: The production system developed by Toyota
Motor Corporation to provide best quality, lowest cost, and
shortest lead time through the elimination of waste.
• TPS is comprised of two pillars, Just-in-Time and Jidoka
(autonomation) , and is often illustrated with the "house"
shown on the next slide.
• TPS is maintained and improved through iterations of
standardized work and kaizen (continuous improvement),
following Plan–Do-Check-Act (PDCA Cycle from Dr.
Deming), or the scientific method.
House of Toyota
Toyota Production System (TPS):
Related Terms
• Ohno System
• MAN (Material as Needed) - Harley
Davidson
• MIPS (Minimum Inventory Production
Systems) - Westinghouse
• Stockless production - Hewlett Packard
• Zero inventory production system
• Lean Manufacturing/Production - MIT
How to make money?
Profit equation: Sales – Cost = Profit
Traditional pricing strategy: Cost + Profit = Selling price
Example:
When the cost goes up, the product selling price is raised to
reflect the higher costs and maintain the desired level of
profit.
Some even argues that the profit added should be large
enough to cover potential losses if the product does not
sell well.
Toyota accepts neither this formula nor these arguments!
Toyota’s philosophy
• Selling price – Cost = Profit
• Customers decide the selling price.
• Profit is what remains after subtracting the cost from it.
• The main way to increase profit is to reduce cost.
• Consequently, cost reduction through waste elimination
should have the highest priority.
• Toyota’s paradox: Reducing cost (waste), will reduce lead
time while increasing quality and customer satisfaction.
• How? We will discuss it soon.
House of Toyota
• Attacks waste
– Anything not adding value to the product
• From the customer’s perspective
• Exposes problems and bottlenecks caused by
variability
– Deviation from optimum
• Achieves streamlined production
– By reducing inventory
What Does Just-in-Time Do?
Waste (“muda” in Japanese) is
‘anything other than the minimum
amount of equipment, materials,
parts, space, and worker’s time,
which are absolutely essential to add
value to the product.’
— Shoichiro Toyoda
Founder, Toyota
© 1995 Corel Corp.
Introductory Quotation
Variability Occurs Because
• Employees, machines, and suppliers
produce units that do not conform to
standards, are late, or are not the proper
quantity
• Engineering drawings or specifications are
inaccurate
• Production personnel try to produce before
drawings or specifications are complete
• Customer demands are unknown
Continuous Flow
• Producing and moving one item at a time (or a
small and consistent batch of items) through a
series of processing steps as continuously as
possible, with each step making just what is
requested by the next step.
It is also called the one-piece flow, single-piece
flow, and make one, move one.
Continuous Flow Production
Flow with JIT
Traditional Flow
Customers
Suppliers
Customers
Suppliers
Production Process
(stream of water)
Inventory (stagnant
ponds) Material
(water in
stream)
Push versus Pull
• Push system: material is pushed into
downstream workstations regardless of
whether resources are available
• Pull system: material is pulled to a
workstation just as it is needed
Traditional U.S. Manufacturing Firm:
Push (“old style” MRP / Material
Requirements Planning System)
• The production of items at times required
by a given schedule planned in advance
Material
Information (Production Schedule)
Work
Station 1
WS 2 WS 3
Pull (JIT) System
The production of items only as demanded for
use or to replace those taken for use.
Material
Information (via Kanban/Card)
Work
Station 1
WS 2 WS 3
• Japanese word for card
– Pronounced ‘kahn-bahn’ (not ‘can-ban’)
• Authorizes production from downstream
operations
– ‘Pulls’ material through plant
• May be a card, flag, verbal signal etc.
• Used often with fixed-size containers
– Add or remove containers to change production
rate
Kanban
Triangular Kanban
Part #
Trigger (Reorder) Point
Part Description Location
Date Triggered Lot Size
Tool #
Machine #
Kanban
Figure S12.5
Basic Fixed-Order Quantity Model and
Reorder Point Behavior
R = Reorder point
Q = Economic order quantity
L = Lead time
L L
Q QQ
R
Time
Number
of units
on hand
1. You receive an order quantity Q.
2. Your start using
them up over time. 3. When you reach down to
a level of inventory of R,
you place your next Q
sized order.
4. The cycle then repeats.
Kanban
The function of Kanban ≈
The function of Inventory Reorder Point
(ROP)
Kanban System
• Single card
– Move only containers
with C (Conveyance)-
kanban)
– e.g.: Kawasaki
• Dual card
– Move only container
with C- kanban
– Produce only when
authorized by P
(Production)- kanban
– e.g.: Toyota
Transparency 17.5
• Traditional: inventory exists in case problems
arise
• JIT objective: Eliminate inventory
• JIT requires
– Small lot sizes
– Low setup time
– Containers for fixed number of parts
• JIT inventory: Minimum inventory to keep
system running
Inventory
• Reduce ripple effect of small variations in
schedules (e.g., final assembly)
• Production quantities evenly distributed over
time (e.g., 7/day)
• Build same mix of products every day
– Results in many small lots
– 1 month = 20 working days
– Item Monthly Quantity Daily Quantity
A 40 2
B 60 3
Heijunka = Leveling (Smoothing) Production
Schedule using Mixed Model Sequencing
A
A A B B B C
JIT Small Lots
Large-Lot Approach
Time
Time
A A B B B C
A A A B B B B B B C C
JIT produces same amount
in same time if setup times
are lowered
Small versus Large Lots
Small lots also increase flexibility to meet
customer demands
Photo S12.4
40 10 4
40 10 4
10 10 1
÷ =
÷ =
÷ =
Heijunka = Leveling (Smoothing) Production Schedule using
Mixed Model Sequencing = Uniform Plant Loading
Product Demand Requirements
Monthly Daily
800 20 40
800 20 40
200 20 10
÷ =
÷ =
÷ =
A
B
C
Largest integer that divides into all daily requirements evenly is 10
Product Daily Requirements Divided by 10
A
B
C
Mixed-model sequence
A-B-A-B-A-B-A-B-C Repeat 10 times per day
Transparency 17.7
Determining Production Sequence
Cycle Times
Working time per day = 480 minutes
Daily requirements: A = 40 units; B = 40 units; C = 10 units
The system cycle time = 480/(40+40+10) = 5.33 min/unit
Product Requirements Cycle Time
480 40 12
480 40 12
480 10 48
÷ =
÷ =
÷ =
A 40
B 40
C 10
Transparency 17.8
Scrap
Work in process inventory level
(hides problems)
Unreliable Vendors Capacity Imbalances
Lowering Inventory
Reduces Waste
Scrap
Reducing inventory reveals
problems so they can be solved.
Unreliable Vendors Capacity Imbalances
WIP
Lowering Inventory
Reduces Waste
Scrap
Reducing inventory reveals
problems so they can be solved.
Unreliable Vendors Capacity ImbalancesWIP
Lowering Inventory
Reduces Waste
Customer
orders 10
Lot size = 5
Lot 1 Lot 2
Lot size = 2
Lot 1 Lot 2 Lot 3 Lot 4 Lot 5
Reducing Lot Sizes Increases the
Number of Lots
…Which Increases
Inventory Costs
Lot Size
Cost
Holding Cost
Total Cost
Setup Cost
Optimal
Lot Size
Smaller
Lot Size
Unless Setup Costs are Reduced
Lot Size
Cost
Holding CostTotal Cost
Setup Cost
Original optimal
lot size
New optimal lot size
Quick setup = Quick changeover
• Reducing setup cost ≈ reducing setup time
• Setup reduction time is a prerequisite to lot size
reduction
• SMED (Single Minute Exchange of Dies)
method
• The method has been developed by Toyota and
then expanded by Dr. Shigeo Shingo (a
consultant to Toyota), and has proven its
effectiveness in many companies by reducing
changeover times (non-value added times) from
hours to a less than 10 minutes
Setup Components
• Internal Setup: consists of setup activities that must
be performed while the machine is stopped.
• External Setup: consists of setup activities that can
be carried out while the machine is still
operating.
It is desirable to:
1. Convert as much internal setup to external setup
2. Improve the setup procedure
Systematic Setup Reduction
Setup Reduction
Setup Reduction:
Standardizing die holder heights reduces the need to
exchange fastening bolts
Setup Reduction Techniques
Quality At The Source
• Doing it right at the first time.
• Jidoka allows workers to stop production
line
• Andon lights signal quality problems
• Under capacity scheduling allows for
planning, problem solving & maintenance
• Visual control makes problems visible
• Poka-yoke prevents defects
House of Toyota
Jidoka
• Toyota Production System (TPS) is supported by two pillars: Just-in-
Time and Jidoka
• Jidoka = Autonomation = Automation with “human” intelligence.
• Sakichi Toyoda, founder of the Toyota group of companies, invented
the concept of Jidoka in the early 20th Century by incorporating a
device on his automatic looms that would stop the loom from
operating whenever a thread broke. Dr. Shigeo Shingo then developed
his idea further.
• This enabled great improvements in quality and freed people up to do
more value creating work than simply monitoring machines for quality
(separating people’s work and machine’s work).
• Eventually, this simple concept found its way into every machine,
every production line, and every Toyota operation.
Jidoka Techniques
• Poka-yoke (mistake or error proofing)
– A form of device for building-in quality at each production
process.
– This device may take many shapes and designs.
– Typical types of Pokayoke are sensors, proximity switches,
stencils, light guards and alignment pins. Simple circuitry is
usually used to operate these electrical error proof devices
as they should be of low cost and simple design.
– Goal: Finding defects before they occur = Zero Defects
– Statistical Quality Control (SQC): Finding defects after they
occur
• Visual management including using Andon Lamp
Poka-Yoke Example
Exhibit 7.10
Visual Management
Andon Lamp
• Red - line stoppage
• Yellow - call for help
• Green - normal
operation
Kaizen
• Change for better = continuous
improvement
• Kaizen workshop or Kaizen event:
A group of Kaizen activity, commonly lasting
five days, in which a team identifies and
implements a significant improvement in a
process, e.g., creating a manufacturing cell.
GEMBA
• GEMBA" is a Japanese word meaning "real place", where
the real action takes place. In business, GEMBA is where
the value-adding activities to satisfy the client are carried
out.
• Manufacturing companies have three main activities in
relation to creating money: developing (designing),
producing and selling products. In a broad sense, GEMBA
means the sites of these three major activities.
• In a narrower context, however, GEMBA means the place
where the products are made.
• The term is often used to stress the that real improvement
can only take place when there is a shop-floor focus on
direct observation of current conditions where work is
done, e.g., not only in the engineering office.
Five Golden Rules of Gemba
• Masaaki Imai promoted Kaizen to people outside Japan through his two highly
acclaimed books:
1. Kaizen: The Key To Japan's Competitive Success.
2. Gemba Kaizen: A Commonsense, Low-Cost Approach to Management
• He preaches the Five Golden Rules of Gemba, the first of which is 'When a
problem (abnormality) arises, go to gemba first'. So what's gemba? It's the
shop floor, or equivalent. Once there, you apply
Golden Rule Two: check with gembutsu (relevant objects).
Three: take temporary counter-measures on the spot.
Four: find the root cause.
Five: standardize to prevent recurrence.
Standardization is the managing part of getting good gemba. You also need
good housekeeping (Imai is very keen on cleaning machines) and muda, the
elimination of waste. But all hinges on getting away from your desk. Obey the
master Imai. GO TO GEMBA!
5Whys: Finding the root cause of a
problem.
• 5 Whys analysis as an effective problem-solving technique. It is also used in Six Sigma.
Example:
• Why is our client, Hinson Corp., unhappy? Because we did not deliver our services
when we said we would.
• Why were we unable to meet the agreed-upon timeline or schedule for delivery? The job
took much longer than we thought it would.
• Why did it take so much longer? Because we underestimated the complexity of the job.
• Why did we underestimate the complexity of the job? Because we made a quick estimate
of the time needed to complete it, and did not list the individual stages needed to
complete the project.
• Why didn't we do this? Because we were running behind on other projects. We clearly
need to review our time estimation and specification procedures.
Plan-Do-Check-Act
(PDCA/Shewart /Deming Cycle)
• Plan: Go to the real place/factory flow (gemba), obverse
the real thing/product (gembutsu), get the real fact
(genjitsu). Focus on reducing response time, lead times,
exposing wastes in your process
• Do: Conduct Kaizen. Create models of excellence so
others can aspire to. Flow everything: product, information
material replenishment, services.
• Check for direction by aligning activities with long-term
business direction
• Act: Take actions to sustain and accelerate improvement
activities
Source: www.leanbreakthru.com
Similarity between 3 Gs and MBWA
• The 3 G's (Gemba, Gembutsu, and Genjitsu, which
translate into “actual place”, “actual thing”, and “actual
situation”).
• In the early days of Hewlett-Packard (H-P), Dave Packard
and Bill Hewlett devised an active management style that
they called Management By Walking Around (MBWA).
Senior H-P managers were seldom at their desks. They
spent most of their days visiting employees, customers,
and suppliers. This direct contact with key people provided
them with a solid grounding from which viable strategies
could be crafted.
5S: Workplace organization/Housekeeping
• 5s: Important part of Kaizen/Lean Manufacturing
• The S's stand for:
– Seiri - keep only what is absolutely necessary, get rid of things that
you don't need, i.e. simplify or sort.
– Seiton - create a location for everything, i.e. organize
or straighten.
– Seiso - clean everything and keep it clean, i.e. cleanliness or
sweep.
– Seiketsu - implement Seiri, Seiton and Seiso plant wide, i.e.
standardize.
– Shitsuke - assure that everyone continues to follow the rules of 5S,
i.e. stick to it or self discipline.
• 5S in the US: Sort, Straighten, Sweep, Standardize, Self Disciple
• 5S + 1S (Safety) = 6S (Hytrol, etc)
• 5S + 2S (Safety and Security) = 7 S (Agilent Technology that was part
of Hewlett Packard)
5S
• 5S is simple to begin and gives good benefits.
• Each individual in an organization is asked to get
rid of overburdening items.
• Red tag attack: A red tag attack is the strategy of
a group of people going through the plant and
putting red tags on everything that has not been
used within the last 30 days. The items that
people feel are necessary to "hold on to" must be
justified to their superior, or the item is taken out
of the plant!
5S in a Factory
Factory tour: Toyota vs.
others.
5S in Office
• Before 5 S
• After 5 S
Standard Work
When manpower, equipment, and materials are used in the most efficient
combination, this is called Standard Work.
There are three elements to Standard Work:
1) Takt Time
2) Work Sequence
3) Standard Work-in-Process
Once a Standard Work is set, performance is measured and continuously
improved.
Standard Work Sheet
Scope of From Raw mat er i al Date Reviewed:
Operations To Heat Tr eat ment Janary 7, 2000
Quality Safety Standard Work Standard WIP TAKT Cycle Crew
Check Precaution in Process Quantity Time Time Size
FG
223.4 min12.1 min10
RM
The Importance of Standardized Work:
Without it, all improvement efforts using Kaizen to eliminate
waste (muda) are not sustainable. You will go back to the
original position before Kaizen.
Manufacturing Cell
Worker Routes Lengthened as Volume
Decreases
Cell 5Cell 5
WorkerWorker
22
Cell 2Cell 2
WorkerWorker
11
Cell 1Cell 1
WorkerWorker
33
Cell 3Cell 3 Cell 4Cell 4
Figure 11.4Figure 11.4
Workload balancing
• Aims at maximizing operator utilization
based on the given takt time.
• Is the key to adjust JIT lines to demand
fluctuations
• Requires flexible operators
Production Line Balancing
Improving Lead Time:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Current Situation
Percent of Lead Time
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Approach # 1: Reducing Value Added (VA) Time by 50%
VA
Approach # 2: Reducing Non Value Added (VA) Time by 50%
NVA (Non Value Added)
NVA
NVA
VA
VA
Value Stream MappingSM
What?
Why?
Who?
When?
Where?
How?
• A visual tool for identifying all activities of the planning,
and manufacturing process to identify waste.
• Provides a tool to visualize what is otherwise usually
invisible.
• The leaders of each product family need to have a
primary role in developing the maps for their own area.
• Develop a current-state map before improvements are
made so that the efforts and benefits can be quantified.
• On the shop floor, not from your office. You need the real
information, not opinion or old data.
• Next page
Value Stream Map Symbols
Spot weld
ABC
plating
C/T = 30 sec
C/O = 10 min
3 shifts
2% scrap rate
Process
Finished
goods
Vendor Data box
3,000 units
= 1 day
Inventory
Push Supermarket:
the location of a
predetermined
standard inventory
Physical pull
Mon
and
Wed
Shipment
C/T = Cycle Time
C/O = Change over or setup time
Current Value Stream Map
Future Value Stream Map
Attributes of Lean Producers - they
• use JIT to eliminate inventory
• build systems to help employees product a
perfect part every time
• reduce space requirements
• develop close relationships with suppliers
• educate suppliers
• eliminate all but value-added activities
• develop the workforce
• make jobs more challenging
• reduce the number of job classes and build
worker flexibility
• apply Total Productive Maintenance (TPM)
The Five Steps of Lean
Production/Toyota Production
System Implementation
• Step 1: Specify Value
Define value from the perspective of the final customer. Express value in terms of a
specific product, which meets the customer's needs at a specific price and at a specific
time.
• Step 2: Value Stream Mapping.
Identify the value stream, the set of all specific actions required to bring a specific
product through the three critical management tasks of any business: the problem-
solving task, the information management task, and the physical transformation task.
Create a map of the Current State and the Future State of the value stream. Identify and
categorize waste in the Current State, and eliminate it!
• Step 3: Create Continuous Flow
Make the remaining steps in the value stream flow. Eliminate functional barriers and
develop a product-focused organization that dramatically improves lead-time.
• Step 4: Create Pull Production
Let the customer pull products as needed.
• Step 5: Perfection
There is no end to the process of reducing effort, time, space, cost, and mistakes. Return
to the first step and begin the next lean transformation, offering a product which is ever
more nearly what the customer wants.
Comparison of
MRP (Material Requirements Planning),
JIT, and TOC (Theory of Constraints)
Loading of operations
Batch sizes
Importance of data
accuracy
Speed of scheduled
development
Flexibility
Cost
Goals
Planning focus
Production basis
Checked by capacity
requirements
Planning afterward
One week or more
Critical
Slow
Lowest
Highest
Meet demand
Have doable plan
Master schedule
Plan
Controlled by kanban
system
Small as possible
Unnecessary
Very fast
Highest
Lowest
Meet demand
Eliminate waste
Final assembly schedule
Need
Controlled by
bottleneck operation
Variable to exploit
constraint
Critical for bottleneck
and feeder operations
Fast
Moderate
Moderate
Meet demand
Maximize profits
Bottleneck
Need and plan
MRP JIT TOC

More Related Content

What's hot

Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing pptSwati Luthra
 
Toyota production-system-bussiness-case-studies-plan-19345
Toyota production-system-bussiness-case-studies-plan-19345Toyota production-system-bussiness-case-studies-plan-19345
Toyota production-system-bussiness-case-studies-plan-19345nemururati
 
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Sabio Bernard
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jitajithsrc
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 

What's hot (9)

Just in Time
Just in Time Just in Time
Just in Time
 
JIT inventory
JIT inventoryJIT inventory
JIT inventory
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Toyota production-system-bussiness-case-studies-plan-19345
Toyota production-system-bussiness-case-studies-plan-19345Toyota production-system-bussiness-case-studies-plan-19345
Toyota production-system-bussiness-case-studies-plan-19345
 
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.
 
Jit in mc donald's
Jit in mc donald'sJit in mc donald's
Jit in mc donald's
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
Toyota- HBS case
Toyota- HBS caseToyota- HBS case
Toyota- HBS case
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 

Viewers also liked

Leadership Lessons - AICPA 2014 Leadership Academy
Leadership Lessons - AICPA 2014 Leadership AcademyLeadership Lessons - AICPA 2014 Leadership Academy
Leadership Lessons - AICPA 2014 Leadership AcademyTom Hood, CPA,CITP,CGMA
 
Marshmallow challenge (English)
Marshmallow challenge (English)Marshmallow challenge (English)
Marshmallow challenge (English)More Shiny Eyes
 
Marshmallow Challenge
Marshmallow ChallengeMarshmallow Challenge
Marshmallow ChallengeRick Stamm
 
31 Quotes To Celebrate Teamwork and Collaboration
31 Quotes To Celebrate Teamwork and Collaboration31 Quotes To Celebrate Teamwork and Collaboration
31 Quotes To Celebrate Teamwork and CollaborationHubSpot
 

Viewers also liked (7)

Ads.v.n
Ads.v.nAds.v.n
Ads.v.n
 
Teamwork
TeamworkTeamwork
Teamwork
 
Leadership Lessons - AICPA 2014 Leadership Academy
Leadership Lessons - AICPA 2014 Leadership AcademyLeadership Lessons - AICPA 2014 Leadership Academy
Leadership Lessons - AICPA 2014 Leadership Academy
 
Marshmallow challenge (English)
Marshmallow challenge (English)Marshmallow challenge (English)
Marshmallow challenge (English)
 
Session 9
Session 9Session 9
Session 9
 
Marshmallow Challenge
Marshmallow ChallengeMarshmallow Challenge
Marshmallow Challenge
 
31 Quotes To Celebrate Teamwork and Collaboration
31 Quotes To Celebrate Teamwork and Collaboration31 Quotes To Celebrate Teamwork and Collaboration
31 Quotes To Celebrate Teamwork and Collaboration
 

Similar to Handout tps & lean

Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTAman Singh
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
Toyota production system
Toyota production system   Toyota production system
Toyota production system kmsonam
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMPrashant thakur
 
A CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptx
A CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptxA CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptx
A CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptx3131MKARTIKEYA
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationSINGHZEE
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemAkshay Jain
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its toolAnkit Gupta
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management Siddhi Suthar
 
JUST IN TIME MANUFACTURING - module 1
JUST IN TIME MANUFACTURING -  module 1JUST IN TIME MANUFACTURING -  module 1
JUST IN TIME MANUFACTURING - module 1Rashmi Srinivas
 

Similar to Handout tps & lean (20)

Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENT
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Book Review-Toyota Production System
Book Review-Toyota Production SystemBook Review-Toyota Production System
Book Review-Toyota Production System
 
Toyota production system
Toyota production system   Toyota production system
Toyota production system
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
A CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptx
A CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptxA CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptx
A CASE STUDY ON TOYOTA PRODUCTION SYSTEM.pptx
 
Just in time
Just in timeJust in time
Just in time
 
Module-4 JIT.ppt
Module-4 JIT.pptModule-4 JIT.ppt
Module-4 JIT.ppt
 
Toyota
ToyotaToyota
Toyota
 
Just in-time
Just in-timeJust in-time
Just in-time
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
bravo opm
bravo opmbravo opm
bravo opm
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management
 
JUST IN TIME MANUFACTURING - module 1
JUST IN TIME MANUFACTURING -  module 1JUST IN TIME MANUFACTURING -  module 1
JUST IN TIME MANUFACTURING - module 1
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 

More from Tri Dung Nguyen

More from Tri Dung Nguyen (20)

Teamskills training
Teamskills trainingTeamskills training
Teamskills training
 
Team+
Team+Team+
Team+
 
S teams
S teamsS teams
S teams
 
Halim lewis cultural-values
Halim lewis cultural-valuesHalim lewis cultural-values
Halim lewis cultural-values
 
Groups, teams & teamwork
Groups, teams & teamworkGroups, teams & teamwork
Groups, teams & teamwork
 
Effective teamwork
Effective teamworkEffective teamwork
Effective teamwork
 
36041
3604136041
36041
 
529 _11._ky_nang_lam_viec_nhom
529  _11._ky_nang_lam_viec_nhom529  _11._ky_nang_lam_viec_nhom
529 _11._ky_nang_lam_viec_nhom
 
3 tt giao tiep phi ngon tu
3 tt   giao tiep phi ngon tu3 tt   giao tiep phi ngon tu
3 tt giao tiep phi ngon tu
 
Qm.9000.public
Qm.9000.publicQm.9000.public
Qm.9000.public
 
Qcdms
QcdmsQcdms
Qcdms
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean manufacturing case study
Lean manufacturing case studyLean manufacturing case study
Lean manufacturing case study
 
Tpm
TpmTpm
Tpm
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
NLP giao tiep phi ngon tu
NLP  giao tiep phi ngon tuNLP  giao tiep phi ngon tu
NLP giao tiep phi ngon tu
 
Lưu trình tài liệu ví dụ cải tiến hàng lỗi máy 9
Lưu trình tài liệu ví dụ cải tiến hàng lỗi máy 9Lưu trình tài liệu ví dụ cải tiến hàng lỗi máy 9
Lưu trình tài liệu ví dụ cải tiến hàng lỗi máy 9
 
Kinh doanh đa cấp
Kinh doanh đa cấpKinh doanh đa cấp
Kinh doanh đa cấp
 
Vn opp 0908 all 2
Vn opp 0908 all 2Vn opp 0908 all 2
Vn opp 0908 all 2
 
Vanluong blogspot-com cafewifisach
Vanluong blogspot-com cafewifisachVanluong blogspot-com cafewifisach
Vanluong blogspot-com cafewifisach
 

Recently uploaded

Mastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptxMastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptxAS Design & AST.
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationPMIUKChapter
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
Introduction to Basic Drill and Ceremonies.pdf
Introduction to Basic Drill and Ceremonies.pdfIntroduction to Basic Drill and Ceremonies.pdf
Introduction to Basic Drill and Ceremonies.pdfRonaldChuma2
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueCIToolkit
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBusiness of Software Conference
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingCIToolkit
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
5 years Business Plan for EParivahan.com
5 years Business Plan for EParivahan.com5 years Business Plan for EParivahan.com
5 years Business Plan for EParivahan.comDEEPRAJ PATHAK
 
Critical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptxCritical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptxcalinagavris17
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsCIToolkit
 
Leading meetings effectively: the secrets of authentic leadership
Leading meetings effectively: the secrets of authentic leadershipLeading meetings effectively: the secrets of authentic leadership
Leading meetings effectively: the secrets of authentic leadershipAndrea Mennillo
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 

Recently uploaded (16)

Mastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptxMastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptx
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentation
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
Introduction to Basic Drill and Ceremonies.pdf
Introduction to Basic Drill and Ceremonies.pdfIntroduction to Basic Drill and Ceremonies.pdf
Introduction to Basic Drill and Ceremonies.pdf
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines Value
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice Sharing
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
5 years Business Plan for EParivahan.com
5 years Business Plan for EParivahan.com5 years Business Plan for EParivahan.com
5 years Business Plan for EParivahan.com
 
Critical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptxCritical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptx
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of Flowcharts
 
Leading meetings effectively: the secrets of authentic leadership
Leading meetings effectively: the secrets of authentic leadershipLeading meetings effectively: the secrets of authentic leadership
Leading meetings effectively: the secrets of authentic leadership
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 

Handout tps & lean

  • 1. Operations Management Toyota Production System (TPS), Just-in-Time (JIT), and Lean Manufacturing Handout Dr. Ahmad Syamil, CFPIM, CIRM, CSCP http://www.clt.astate.edu/asyamil/ asyamil AT yahoo DOT com
  • 2. APICS www.apics.org • Old Name: The American Production and Inventory Control Society • New Name: The Association for Operations Management - Advancing Productivity, Innovation, and Competitive Success. • APICS offers four internationally recognized professional certification programs: 1. CPIM: Certified in Production and Inventory Management 2. CFPIM: Certified Fellow in Production and Inventory Management = CPIM + extensive knowledge sharing with others through presenting, teaching, publishing, and other APICS educational activities. 3. CIRM: Certified in Integrated Resource Management 4. Beginning 2006: Certified Supply Chain Professional (CSCP) designation is designed for professionals interested in increasing their knowledge of supply chain management, those currently working in the field of supply chain management (SCM), and for those individuals working with enterprise resources planning (ERP) systems.
  • 4. Toyota is now the world's largest carmaker • Toyota sold 2.348 million vehicles in the first three months of 2007. • General Motors (GM) is estimated to have sold 2.26 million cars and small trucks during the same period.
  • 7. Why not Toyota? • GM lost $10.6 billion in 2005. • GM's pension obligations under funded by about $31 billion • GM will eliminate 30,000 jobs and close 12 North American factories by 2008 • Ford earned $2 billion worldwide, but lost $1.6 billion in its North American operations. • Ford is shutting 10 plants and laying off 25,000 hourly workers. • Daimler paid $36 billion for Chrysler in 1998. • Chrysler reported a $1.5 billion loss for the third quarter of 2006 and a $2 billion loss for the first quarter of 2007. • DaimlerChysler finally sold 80.1% of Chrysler to Cerberus Capital for $7.4 billion in May of 2007.
  • 10. History• Sakichi Toyoda, the founder of the Toyota group of companies, started Toyota as a textile machine company. • Kiichiro Toyoda, son of Sakichi and founder of the Toyota automobile business, developed the concept of Just-in-Time in the 1930s. He decreed that Toyota operations would contain no excess inventory and that Toyota would strive to work in partnership with suppliers to level production. • Taiichi Ohno, Toyota's chief of production in the post- WWII period. He was THE main developer of Toyota Production System (TPS). • Dr. Shigeo Shingo: A consultant to Toyota. PS: Shingo Prize is the highest manufacturing excellence award in the U.S. The prize is given both to companies and individuals who contribute to the
  • 11. History (cont.) • Toyota Production System (TPS) drew wide attention from the industrial community because Toyota was a profitable car company in Japan during and after the oil embargo in 1970s. • Outside Japan, dissemination began in earnest with the creation of the Toyota-General Motors joint venture-NUMMI (New United Motor Manufacturing Inc.) in California in 1984. • Widespread recognition of TPS as the model production system grew rapidly with the publication in 1990 of The Machine That Changed the World: The Story of Lean Production, the result of five years of research led by the Massachusetts Institute of Technology. • The MIT researchers found that TPS was so much more effective and efficient than traditional, mass production that it represented a completely new paradigm and coined the term lean production to indicate this radically different approach to production. • The term was coined by John Krafcik, a research assistant at MIT with the International Motor Vehicle Program in the late 1980s. He then worked for General Motors and now is a Vice President of Hyundai, U.S.
  • 12. Toyota Production System (TPS) • Definition: The production system developed by Toyota Motor Corporation to provide best quality, lowest cost, and shortest lead time through the elimination of waste. • TPS is comprised of two pillars, Just-in-Time and Jidoka (autonomation) , and is often illustrated with the "house" shown on the next slide. • TPS is maintained and improved through iterations of standardized work and kaizen (continuous improvement), following Plan–Do-Check-Act (PDCA Cycle from Dr. Deming), or the scientific method.
  • 14. Toyota Production System (TPS): Related Terms • Ohno System • MAN (Material as Needed) - Harley Davidson • MIPS (Minimum Inventory Production Systems) - Westinghouse • Stockless production - Hewlett Packard • Zero inventory production system • Lean Manufacturing/Production - MIT
  • 15. How to make money? Profit equation: Sales – Cost = Profit Traditional pricing strategy: Cost + Profit = Selling price Example: When the cost goes up, the product selling price is raised to reflect the higher costs and maintain the desired level of profit. Some even argues that the profit added should be large enough to cover potential losses if the product does not sell well. Toyota accepts neither this formula nor these arguments!
  • 16. Toyota’s philosophy • Selling price – Cost = Profit • Customers decide the selling price. • Profit is what remains after subtracting the cost from it. • The main way to increase profit is to reduce cost. • Consequently, cost reduction through waste elimination should have the highest priority. • Toyota’s paradox: Reducing cost (waste), will reduce lead time while increasing quality and customer satisfaction. • How? We will discuss it soon.
  • 18.
  • 19.
  • 20. • Attacks waste – Anything not adding value to the product • From the customer’s perspective • Exposes problems and bottlenecks caused by variability – Deviation from optimum • Achieves streamlined production – By reducing inventory What Does Just-in-Time Do?
  • 21. Waste (“muda” in Japanese) is ‘anything other than the minimum amount of equipment, materials, parts, space, and worker’s time, which are absolutely essential to add value to the product.’ — Shoichiro Toyoda Founder, Toyota © 1995 Corel Corp. Introductory Quotation
  • 22.
  • 23. Variability Occurs Because • Employees, machines, and suppliers produce units that do not conform to standards, are late, or are not the proper quantity • Engineering drawings or specifications are inaccurate • Production personnel try to produce before drawings or specifications are complete • Customer demands are unknown
  • 24. Continuous Flow • Producing and moving one item at a time (or a small and consistent batch of items) through a series of processing steps as continuously as possible, with each step making just what is requested by the next step. It is also called the one-piece flow, single-piece flow, and make one, move one.
  • 25.
  • 26. Continuous Flow Production Flow with JIT Traditional Flow Customers Suppliers Customers Suppliers Production Process (stream of water) Inventory (stagnant ponds) Material (water in stream)
  • 27. Push versus Pull • Push system: material is pushed into downstream workstations regardless of whether resources are available • Pull system: material is pulled to a workstation just as it is needed
  • 28. Traditional U.S. Manufacturing Firm: Push (“old style” MRP / Material Requirements Planning System) • The production of items at times required by a given schedule planned in advance Material Information (Production Schedule) Work Station 1 WS 2 WS 3
  • 29. Pull (JIT) System The production of items only as demanded for use or to replace those taken for use. Material Information (via Kanban/Card) Work Station 1 WS 2 WS 3
  • 30. • Japanese word for card – Pronounced ‘kahn-bahn’ (not ‘can-ban’) • Authorizes production from downstream operations – ‘Pulls’ material through plant • May be a card, flag, verbal signal etc. • Used often with fixed-size containers – Add or remove containers to change production rate Kanban
  • 31. Triangular Kanban Part # Trigger (Reorder) Point Part Description Location Date Triggered Lot Size Tool # Machine #
  • 34. Basic Fixed-Order Quantity Model and Reorder Point Behavior R = Reorder point Q = Economic order quantity L = Lead time L L Q QQ R Time Number of units on hand 1. You receive an order quantity Q. 2. Your start using them up over time. 3. When you reach down to a level of inventory of R, you place your next Q sized order. 4. The cycle then repeats.
  • 35. Kanban The function of Kanban ≈ The function of Inventory Reorder Point (ROP)
  • 36. Kanban System • Single card – Move only containers with C (Conveyance)- kanban) – e.g.: Kawasaki • Dual card – Move only container with C- kanban – Produce only when authorized by P (Production)- kanban – e.g.: Toyota Transparency 17.5
  • 37. • Traditional: inventory exists in case problems arise • JIT objective: Eliminate inventory • JIT requires – Small lot sizes – Low setup time – Containers for fixed number of parts • JIT inventory: Minimum inventory to keep system running Inventory
  • 38. • Reduce ripple effect of small variations in schedules (e.g., final assembly) • Production quantities evenly distributed over time (e.g., 7/day) • Build same mix of products every day – Results in many small lots – 1 month = 20 working days – Item Monthly Quantity Daily Quantity A 40 2 B 60 3 Heijunka = Leveling (Smoothing) Production Schedule using Mixed Model Sequencing
  • 39. A A A B B B C JIT Small Lots Large-Lot Approach Time Time A A B B B C A A A B B B B B B C C JIT produces same amount in same time if setup times are lowered Small versus Large Lots Small lots also increase flexibility to meet customer demands
  • 41. 40 10 4 40 10 4 10 10 1 ÷ = ÷ = ÷ = Heijunka = Leveling (Smoothing) Production Schedule using Mixed Model Sequencing = Uniform Plant Loading Product Demand Requirements Monthly Daily 800 20 40 800 20 40 200 20 10 ÷ = ÷ = ÷ = A B C Largest integer that divides into all daily requirements evenly is 10 Product Daily Requirements Divided by 10 A B C Mixed-model sequence A-B-A-B-A-B-A-B-C Repeat 10 times per day Transparency 17.7 Determining Production Sequence
  • 42. Cycle Times Working time per day = 480 minutes Daily requirements: A = 40 units; B = 40 units; C = 10 units The system cycle time = 480/(40+40+10) = 5.33 min/unit Product Requirements Cycle Time 480 40 12 480 40 12 480 10 48 ÷ = ÷ = ÷ = A 40 B 40 C 10 Transparency 17.8
  • 43. Scrap Work in process inventory level (hides problems) Unreliable Vendors Capacity Imbalances Lowering Inventory Reduces Waste
  • 44. Scrap Reducing inventory reveals problems so they can be solved. Unreliable Vendors Capacity Imbalances WIP Lowering Inventory Reduces Waste
  • 45. Scrap Reducing inventory reveals problems so they can be solved. Unreliable Vendors Capacity ImbalancesWIP Lowering Inventory Reduces Waste
  • 46. Customer orders 10 Lot size = 5 Lot 1 Lot 2 Lot size = 2 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Reducing Lot Sizes Increases the Number of Lots
  • 47. …Which Increases Inventory Costs Lot Size Cost Holding Cost Total Cost Setup Cost Optimal Lot Size Smaller Lot Size
  • 48. Unless Setup Costs are Reduced Lot Size Cost Holding CostTotal Cost Setup Cost Original optimal lot size New optimal lot size
  • 49. Quick setup = Quick changeover • Reducing setup cost ≈ reducing setup time • Setup reduction time is a prerequisite to lot size reduction • SMED (Single Minute Exchange of Dies) method • The method has been developed by Toyota and then expanded by Dr. Shigeo Shingo (a consultant to Toyota), and has proven its effectiveness in many companies by reducing changeover times (non-value added times) from hours to a less than 10 minutes
  • 50. Setup Components • Internal Setup: consists of setup activities that must be performed while the machine is stopped. • External Setup: consists of setup activities that can be carried out while the machine is still operating. It is desirable to: 1. Convert as much internal setup to external setup 2. Improve the setup procedure
  • 53. Setup Reduction: Standardizing die holder heights reduces the need to exchange fastening bolts
  • 54.
  • 56. Quality At The Source • Doing it right at the first time. • Jidoka allows workers to stop production line • Andon lights signal quality problems • Under capacity scheduling allows for planning, problem solving & maintenance • Visual control makes problems visible • Poka-yoke prevents defects
  • 58. Jidoka • Toyota Production System (TPS) is supported by two pillars: Just-in- Time and Jidoka • Jidoka = Autonomation = Automation with “human” intelligence. • Sakichi Toyoda, founder of the Toyota group of companies, invented the concept of Jidoka in the early 20th Century by incorporating a device on his automatic looms that would stop the loom from operating whenever a thread broke. Dr. Shigeo Shingo then developed his idea further. • This enabled great improvements in quality and freed people up to do more value creating work than simply monitoring machines for quality (separating people’s work and machine’s work). • Eventually, this simple concept found its way into every machine, every production line, and every Toyota operation.
  • 59. Jidoka Techniques • Poka-yoke (mistake or error proofing) – A form of device for building-in quality at each production process. – This device may take many shapes and designs. – Typical types of Pokayoke are sensors, proximity switches, stencils, light guards and alignment pins. Simple circuitry is usually used to operate these electrical error proof devices as they should be of low cost and simple design. – Goal: Finding defects before they occur = Zero Defects – Statistical Quality Control (SQC): Finding defects after they occur • Visual management including using Andon Lamp
  • 61.
  • 62.
  • 63. Visual Management Andon Lamp • Red - line stoppage • Yellow - call for help • Green - normal operation
  • 64.
  • 65.
  • 66. Kaizen • Change for better = continuous improvement • Kaizen workshop or Kaizen event: A group of Kaizen activity, commonly lasting five days, in which a team identifies and implements a significant improvement in a process, e.g., creating a manufacturing cell.
  • 67.
  • 68. GEMBA • GEMBA" is a Japanese word meaning "real place", where the real action takes place. In business, GEMBA is where the value-adding activities to satisfy the client are carried out. • Manufacturing companies have three main activities in relation to creating money: developing (designing), producing and selling products. In a broad sense, GEMBA means the sites of these three major activities. • In a narrower context, however, GEMBA means the place where the products are made. • The term is often used to stress the that real improvement can only take place when there is a shop-floor focus on direct observation of current conditions where work is done, e.g., not only in the engineering office.
  • 69. Five Golden Rules of Gemba • Masaaki Imai promoted Kaizen to people outside Japan through his two highly acclaimed books: 1. Kaizen: The Key To Japan's Competitive Success. 2. Gemba Kaizen: A Commonsense, Low-Cost Approach to Management • He preaches the Five Golden Rules of Gemba, the first of which is 'When a problem (abnormality) arises, go to gemba first'. So what's gemba? It's the shop floor, or equivalent. Once there, you apply Golden Rule Two: check with gembutsu (relevant objects). Three: take temporary counter-measures on the spot. Four: find the root cause. Five: standardize to prevent recurrence. Standardization is the managing part of getting good gemba. You also need good housekeeping (Imai is very keen on cleaning machines) and muda, the elimination of waste. But all hinges on getting away from your desk. Obey the master Imai. GO TO GEMBA!
  • 70. 5Whys: Finding the root cause of a problem. • 5 Whys analysis as an effective problem-solving technique. It is also used in Six Sigma. Example: • Why is our client, Hinson Corp., unhappy? Because we did not deliver our services when we said we would. • Why were we unable to meet the agreed-upon timeline or schedule for delivery? The job took much longer than we thought it would. • Why did it take so much longer? Because we underestimated the complexity of the job. • Why did we underestimate the complexity of the job? Because we made a quick estimate of the time needed to complete it, and did not list the individual stages needed to complete the project. • Why didn't we do this? Because we were running behind on other projects. We clearly need to review our time estimation and specification procedures.
  • 71. Plan-Do-Check-Act (PDCA/Shewart /Deming Cycle) • Plan: Go to the real place/factory flow (gemba), obverse the real thing/product (gembutsu), get the real fact (genjitsu). Focus on reducing response time, lead times, exposing wastes in your process • Do: Conduct Kaizen. Create models of excellence so others can aspire to. Flow everything: product, information material replenishment, services. • Check for direction by aligning activities with long-term business direction • Act: Take actions to sustain and accelerate improvement activities Source: www.leanbreakthru.com
  • 72. Similarity between 3 Gs and MBWA • The 3 G's (Gemba, Gembutsu, and Genjitsu, which translate into “actual place”, “actual thing”, and “actual situation”). • In the early days of Hewlett-Packard (H-P), Dave Packard and Bill Hewlett devised an active management style that they called Management By Walking Around (MBWA). Senior H-P managers were seldom at their desks. They spent most of their days visiting employees, customers, and suppliers. This direct contact with key people provided them with a solid grounding from which viable strategies could be crafted.
  • 73. 5S: Workplace organization/Housekeeping • 5s: Important part of Kaizen/Lean Manufacturing • The S's stand for: – Seiri - keep only what is absolutely necessary, get rid of things that you don't need, i.e. simplify or sort. – Seiton - create a location for everything, i.e. organize or straighten. – Seiso - clean everything and keep it clean, i.e. cleanliness or sweep. – Seiketsu - implement Seiri, Seiton and Seiso plant wide, i.e. standardize. – Shitsuke - assure that everyone continues to follow the rules of 5S, i.e. stick to it or self discipline. • 5S in the US: Sort, Straighten, Sweep, Standardize, Self Disciple • 5S + 1S (Safety) = 6S (Hytrol, etc) • 5S + 2S (Safety and Security) = 7 S (Agilent Technology that was part of Hewlett Packard)
  • 74. 5S • 5S is simple to begin and gives good benefits. • Each individual in an organization is asked to get rid of overburdening items. • Red tag attack: A red tag attack is the strategy of a group of people going through the plant and putting red tags on everything that has not been used within the last 30 days. The items that people feel are necessary to "hold on to" must be justified to their superior, or the item is taken out of the plant!
  • 75. 5S in a Factory Factory tour: Toyota vs. others.
  • 76. 5S in Office • Before 5 S • After 5 S
  • 77. Standard Work When manpower, equipment, and materials are used in the most efficient combination, this is called Standard Work. There are three elements to Standard Work: 1) Takt Time 2) Work Sequence 3) Standard Work-in-Process Once a Standard Work is set, performance is measured and continuously improved.
  • 78.
  • 79. Standard Work Sheet Scope of From Raw mat er i al Date Reviewed: Operations To Heat Tr eat ment Janary 7, 2000 Quality Safety Standard Work Standard WIP TAKT Cycle Crew Check Precaution in Process Quantity Time Time Size FG 223.4 min12.1 min10 RM
  • 80. The Importance of Standardized Work: Without it, all improvement efforts using Kaizen to eliminate waste (muda) are not sustainable. You will go back to the original position before Kaizen.
  • 82. Worker Routes Lengthened as Volume Decreases Cell 5Cell 5 WorkerWorker 22 Cell 2Cell 2 WorkerWorker 11 Cell 1Cell 1 WorkerWorker 33 Cell 3Cell 3 Cell 4Cell 4 Figure 11.4Figure 11.4
  • 83. Workload balancing • Aims at maximizing operator utilization based on the given takt time. • Is the key to adjust JIT lines to demand fluctuations • Requires flexible operators
  • 85. Improving Lead Time: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Current Situation Percent of Lead Time 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Approach # 1: Reducing Value Added (VA) Time by 50% VA Approach # 2: Reducing Non Value Added (VA) Time by 50% NVA (Non Value Added) NVA NVA VA VA
  • 86. Value Stream MappingSM What? Why? Who? When? Where? How? • A visual tool for identifying all activities of the planning, and manufacturing process to identify waste. • Provides a tool to visualize what is otherwise usually invisible. • The leaders of each product family need to have a primary role in developing the maps for their own area. • Develop a current-state map before improvements are made so that the efforts and benefits can be quantified. • On the shop floor, not from your office. You need the real information, not opinion or old data. • Next page
  • 87. Value Stream Map Symbols Spot weld ABC plating C/T = 30 sec C/O = 10 min 3 shifts 2% scrap rate Process Finished goods Vendor Data box 3,000 units = 1 day Inventory Push Supermarket: the location of a predetermined standard inventory Physical pull Mon and Wed Shipment C/T = Cycle Time C/O = Change over or setup time
  • 90. Attributes of Lean Producers - they • use JIT to eliminate inventory • build systems to help employees product a perfect part every time • reduce space requirements • develop close relationships with suppliers • educate suppliers • eliminate all but value-added activities • develop the workforce • make jobs more challenging • reduce the number of job classes and build worker flexibility • apply Total Productive Maintenance (TPM)
  • 91. The Five Steps of Lean Production/Toyota Production System Implementation • Step 1: Specify Value Define value from the perspective of the final customer. Express value in terms of a specific product, which meets the customer's needs at a specific price and at a specific time. • Step 2: Value Stream Mapping. Identify the value stream, the set of all specific actions required to bring a specific product through the three critical management tasks of any business: the problem- solving task, the information management task, and the physical transformation task. Create a map of the Current State and the Future State of the value stream. Identify and categorize waste in the Current State, and eliminate it! • Step 3: Create Continuous Flow Make the remaining steps in the value stream flow. Eliminate functional barriers and develop a product-focused organization that dramatically improves lead-time. • Step 4: Create Pull Production Let the customer pull products as needed. • Step 5: Perfection There is no end to the process of reducing effort, time, space, cost, and mistakes. Return to the first step and begin the next lean transformation, offering a product which is ever more nearly what the customer wants.
  • 92. Comparison of MRP (Material Requirements Planning), JIT, and TOC (Theory of Constraints) Loading of operations Batch sizes Importance of data accuracy Speed of scheduled development Flexibility Cost Goals Planning focus Production basis Checked by capacity requirements Planning afterward One week or more Critical Slow Lowest Highest Meet demand Have doable plan Master schedule Plan Controlled by kanban system Small as possible Unnecessary Very fast Highest Lowest Meet demand Eliminate waste Final assembly schedule Need Controlled by bottleneck operation Variable to exploit constraint Critical for bottleneck and feeder operations Fast Moderate Moderate Meet demand Maximize profits Bottleneck Need and plan MRP JIT TOC

Editor's Notes

  1. It would also be useful if you could have students develop a similar list for services.
  2. Students should be asked to draw their own connection between inventory and problems. Given that inventory exists in case of problems, if we wish to eliminate inventory, we also must eliminate problems. Again the notion that JIT is not simply an inventory methodology.
  3. In discussing this slide, it is helpful to stress the caveat that JIT works given that other problems are solved. JIT not only requires the solution of other problems, it also helps in diagnosis.
  4. The analogy presented in this and the next four slides may help to illustrate the action of inventory in hiding problems.
  5. The next several slides look at the process and consequences of reducing inventory.