0
888-320-8050www.MBSI.com
Key ContactPatricia Berk - President & Owner of MBSI• Patricia Berk incorporated MBSI in April of 2000.• MBSI has become t...
About MBSI• MBSI is a solely owned corporation based in theState of Florida, United States.• MBSI is a certified general c...
MBSI’s Mission• To exceed client expectations throughhonest communication, quality constructionand sensitivity for the env...
MBSI Business Philosophy• To attain successful long-term relationshipsthrough truthful and honest businessprocedures.- Uti...
Environmental Focus• Provider of the first platinum-levelLeadership, Energy and EnvironmentalDesign (LEED) Certified modul...
Market Sectors• Commercial Housing- Group treatment homes, Dormitories, Military Housing,Worker Camps• Schools- Charter, P...
Types of Products Provided• Factory Built Modular Structures• Pre-engineered Steel Buildings• Turn Key Site Services• Buil...
Recent Completed Projects• Shands Hospital MRI/CT Scan ModularFacility• Learning Gate Community School, PlatinumLevel LEED...
Jacksonville Medical Center• MRI/CT can, type II noncombustible modularmedical facility.• 5000 Square feet.• Contracted No...
Learning Gate School• 9 Classrooms, 8000Sq. Feet• First Platinum LEEDCertified ModularSchool in U.S.• Receiving NationalAt...
Terrace CommunityCharter School• Built in 2007• Two Buildingstotaling 36,000 sq.feet.• AdministrativeOffices• Gymnasium• 3...
An Overview of thePermanent/Relocatable Modular ConstructionEngineering & SubmittalsSite DevelopmentModular ConstructionSt...
Design Engineering• Unlimited Design Assistance• FL Engineered Blueprints• PE /Architect Coordination• Local Permitting Ad...
Site Development• Site preparation• Foundations• Logistics and receiving for stagingDesign Site DevelopmentModular Constru...
Modular Construction Process• Begin Manufacturing Modules• Quality control/Documentation• State of FL building approval• D...
Staging & Installation• Foundation Development prior toDelivery• Staging on or near existing site• Set-up and installation...
Begin On Site Finishes• As modular building is installed, on site Interior &Exterior finishes Begin• Full Time Constructio...
Interior Finishes• Interior finishes are completed• Full Time Construction Management and Coordination ofInterior Contract...
Finish Out•Exterior finishes completed:•Exterior siding, sidewalks, canopies, etcDesign Site DevelopmentModular Constructi...
Completion• Final walkthrough of building• Test HVAC, Electrical & Plumbing• Substantial Completion Signed OffDesign Site ...
Project CompletedDesign Site DevelopmentModular ConstructionStaging and InstallationBegin Finishout2000 Modular Building S...
Upcoming SlideShare
Loading in...5
×

Modular building systems international (mbsi) modular buildings and construction

1,024

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,024
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
64
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Modular building systems international (mbsi) modular buildings and construction"

  1. 1. 888-320-8050www.MBSI.com
  2. 2. Key ContactPatricia Berk - President & Owner of MBSI• Patricia Berk incorporated MBSI in April of 2000.• MBSI has become the leading environmentally consciousmodular company in the State of Florida.• Prior to MBSI, Ms. Berk held positions as Executive VicePresident and was a shareholder of ASAP Office Buildingsin Orlando, Florida, 1996-1999.• Branch Manager for the Central Florida branch of SpaceMaster International, 1993-1996.• Account Executive for Diamond Engineered Space, 1989-1993.• Phone 888-320-8050GUATEMALA HOUSING REVITALIZATION
  3. 3. About MBSI• MBSI is a solely owned corporation based in theState of Florida, United States.• MBSI is a certified general contracting firm,specializing in modular construction with Turn KeyServices.• The Company was established April 10, 2000 withit’s primary business in the South East, USA.• MBSI has established themselves in the alternativebuilding marketplace as a leader with energyefficient and environmentally friendly buildings.GUATEMALA HOUSING REVITALIZATION
  4. 4. MBSI’s Mission• To exceed client expectations throughhonest communication, quality constructionand sensitivity for the environment, whilefostering a safe, creative and ethicalworkplace that provides unlimitedopportunities.• To be major contributor to the developmentand quality of modular construction whileproviding impeccable customer service andcommunication.GUATEMALA HOUSING REVITALIZATION
  5. 5. MBSI Business Philosophy• To attain successful long-term relationshipsthrough truthful and honest businessprocedures.- Utilize proven manufacturers, qualitymaterials, and provide cost effectiveconstruction.- Committed to meeting all clientrequirements, for total customer satisfaction.GUATEMALA HOUSING REVITALIZATION
  6. 6. Environmental Focus• Provider of the first platinum-levelLeadership, Energy and EnvironmentalDesign (LEED) Certified modular school inthe State of Florida• Introduced green building practices in allaspects of MBSI as standard practices.• We use use certified green products in ourmodular buildings in order to minimize offgassing and conserve energyGUATEMALA HOUSING REVITALIZATION
  7. 7. Market Sectors• Commercial Housing- Group treatment homes, Dormitories, Military Housing,Worker Camps• Schools- Charter, Public and Private, Gymnasiums, Classrooms,Auditoriums• Medical- CT/MRI Buildings, X-Ray Storage, AdministrativeBuildings, Doctors Offices, Hospitals, Laboratories• Churches/Places of Worship- Daycare & Child Care, Offices, Fellowship Halls,Sanctuarys, Business Offices• Government- Administrative Offices, dormitories, fieldstations,
  8. 8. Types of Products Provided• Factory Built Modular Structures• Pre-engineered Steel Buildings• Turn Key Site Services• Building AccessoriesGUATEMALA HOUSING REVITALIZATION
  9. 9. Recent Completed Projects• Shands Hospital MRI/CT Scan ModularFacility• Learning Gate Community School, PlatinumLevel LEED Certified Hillsboro CountyPublic Charter School.www.learninggate.org• Terrace Community Charter Middle School-Hillsboro County Public Charter School• 50,000 sq. ft. classroom space EmbryRiddle Aeronautical UniversityGUATEMALA HOUSING REVITALIZATION
  10. 10. Jacksonville Medical Center• MRI/CT can, type II noncombustible modularmedical facility.• 5000 Square feet.• Contracted November2007• Finished March 2008To know about MBSI’s other medical buildings and projects,visit http://mbsi.com/building-types/medical.html
  11. 11. Learning Gate School• 9 Classrooms, 8000Sq. Feet• First Platinum LEEDCertified ModularSchool in U.S.• Receiving NationalAttention• www.learninggate.orgTo know about MBSI’s other educational buildings and projects,visit http://mbsi.com/building-types/education.html
  12. 12. Terrace CommunityCharter School• Built in 2007• Two Buildingstotaling 36,000 sq.feet.• AdministrativeOffices• Gymnasium• 30 Classrooms• Cafeteria
  13. 13. An Overview of thePermanent/Relocatable Modular ConstructionEngineering & SubmittalsSite DevelopmentModular ConstructionStaging & InstallationInterior & Exterior FinishesProject Completion2000 Modular Building Systems Intl.
  14. 14. Design Engineering• Unlimited Design Assistance• FL Engineered Blueprints• PE /Architect Coordination• Local Permitting AdministrationDesign Site DevelopmentModular ConstructionStaging and Installation Finishout Completion2000 Modular Building Systems Intl.
  15. 15. Site Development• Site preparation• Foundations• Logistics and receiving for stagingDesign Site DevelopmentModular ConstructionStaging and Installation Finishout Completion2000 Modular Building Systems Intl.
  16. 16. Modular Construction Process• Begin Manufacturing Modules• Quality control/Documentation• State of FL building approval• Delivery to SiteDesign Site DevelopmentModular ConstructionStaging and Installation2000 Modular Building Systems Intl.Finishout Completion
  17. 17. Staging & Installation• Foundation Development prior toDelivery• Staging on or near existing site• Set-up and installation• Begin on-site finishesDesign Site DevelopmentModular ConstructionGUATEMALAStaging and InstallationBegin Finishout2000 Modular Building Systems Intl.Finishout Completion
  18. 18. Begin On Site Finishes• As modular building is installed, on site Interior &Exterior finishes Begin• Full Time Construction ManagementDesign Site DevelopmentModular ConstructionStaging and InstallationBegin Finishout2000 Modular Building Systems Intl.On Site CompletionFinishes
  19. 19. Interior Finishes• Interior finishes are completed• Full Time Construction Management and Coordination ofInterior ContractorsDesign Site DevelopmentModular ConstructionStaging and InstallationBegin Finishout2000 Modular Building Systems Intl.Interior CompletionFinishes
  20. 20. Finish Out•Exterior finishes completed:•Exterior siding, sidewalks, canopies, etcDesign Site DevelopmentModular ConstructionStaging and InstallationBegin Finishout2000 Modular Building Systems Intl.Exterior CompletionFinishes
  21. 21. Completion• Final walkthrough of building• Test HVAC, Electrical & Plumbing• Substantial Completion Signed OffDesign Site DevelopmentModular ConstructionStaging and InstallationBegin Finishout2000 Modular Building Systems Intl.Finishout Completion
  22. 22. Project CompletedDesign Site DevelopmentModular ConstructionStaging and InstallationBegin Finishout2000 Modular Building Systems Intl.Finishout Completion
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×