Your SlideShare is downloading. ×
2011 08 02 nux presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

2011 08 02 nux presentation

399
views

Published on

Published in: Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
399
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. www.newpacificmetals.com
  • 2. PRESENTATION IS ONLY A SERVICEThis presentation is not intended as a solicitation or offering of securities in any jurisdiction and the information contained herein in no way should be construed or interpreted as such. No securities commission or other regulatory authority in Canada or any other country or jurisdiction has in any way passed upon this information and no representation or warranty is made by New Pacific Metals Corp. (“New Pacific”) to that effect.  The information in this presentation is not intended to modify, qualify, supplement or amend information disclosed under corporate and securities legislation of any jurisdiction applicable to New Pacific and should not be used for the purpose of making investment decisions concerning New Pacific securities.  CAUTIONARY NOTE REGARDING FORWARD‐LOOKING STATEMENTSThis presentation contains “forward‐looking statements”, within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of New Pacific. Forward‐looking statements include, but are not limited to, statements with respect to the future price of gold and silver, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of exploration activities, requirements for additional capital, government regulation of mining operations, environmental risks, title disputes or claims and limitations on insurance coverage. Generally, these forward‐looking statements can be identified by the use of forward‐looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof.Forward‐looking statements are subject to known and unknown risks, uncertainties and other important factors that may cause the actual results, level of activity, performance or achievements of New Pacific to be materially different from those expressed or implied by such forward‐looking statements; see a list of risk factors in the section titled “Description of the Business – Risk Factors” in New Pacific’s annual information form available at www.sedar.com. Although New Pacific has attempted to identify important factors that could cause actual results to differ materially from those contained in forward‐looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward‐looking statements.Albert Siega, P.Eng, Vice‐President Mining is a “Qualified Person” within the meaning of National Instrument 43‐101 ‐ Standards of Disclosure for Mineral Projects (“NI 43‐101”) who supervised the preparation of the scientific and technical information of NUX included in this presentation. 2
  • 3. Board of Directors and Key ManagementDr. Rui Feng – CEO & DirectorA diversified background in of mineral exploration in Canada and abroad, including extensive experience in exploration and development of high‐grade underground mines, also Chairman & CEO of Silvercorp Metals Inc. (SVM: TSX/NYSE).The Honourable Jack Austin – ChairmanJack Austin has over 40 years of experience in law, business, public service and politics. Mr. Austin has had a diversified career and has expertise in cross‐cultural communications and business development.Greg Hawkins – DirectorGreg Hawkins has been involved in the mining exploration and investment industry since 1969. He has contributed to the identification and/or delineation of 10 mineral deposits. He has been the founding project consultant and/or founding director of seven public and private exploration/development ventures.  David Kong – DirectorMr. Kong earned his Chartered Accountant designation in British Columbia and was a partner of Ellis Foster Chartered Accountants, between 1981 and 2004, and a partner of Ernst & Young LLP from 2005 to 2010.Dr. Robert Kerrich– DirectorDr. Kerrich has 30 years consulting experience in the mineral industry on gold and base metals and has been the George McLeod research chair at the Department of Geological Sciences of the University of Saskatchewan.  3
  • 4. New Pacific Metals Corp. – Building the Next Silvercorp • Dr. Rui Feng, CEO of New Pacific, built Silvercorp from a market capitalization of  $14 million in 2005 to more than $2‐billion in 6 years by focusing on bringing  projects into profitable production before their potential is drilled off, thereby  using cash flow to fund growth and expansion • New Pacific will follow a similar approach of developing projects with potential to  generate early cash flow, then using cash flow to finance resource addition and  production growth • Tagish Lake Gold Property fits into this strategy in the following ways: 1) Known zones of high grade gold‐silver resources 2) Existing infrastructure, mill and underground development 3) Easy access and mining friendly Yukon 4) Sufficient funds on hand 5) A strong team of North American professionals 4
  • 5. NUX Share Structure NUX shares issued & outstanding: 67.3 million Warrants @ $2.00 9.0 million Options 3.4 million Fully diluted 79.7 millionNUX Financial Position Cash & short term investments  $42.5 million No long term debt 5
  • 6. Cost FY2012 Capital Program ($million) Drilling Exploration program:  (metre) Goddell 23,000 $4.4  Underground drilling: Skukum Creek  13,000 $3.1  Surface drilling &   Raca 5,500 $4.6  geophysics*:  Other areas 18,500 Total 60,000 $12.1 Permitting  $0.85 Surface Infrastructure  $0.68 Equipment  $1.4 General operations $1.5 Total $16.5 *Includes airborne geophysical survey of 1,000 line km and ground survey of 40 line km 6
  • 7. Tagish Lake Gold Property • District scale 178 km2 mineral claims located  ~80 km from Whitehorse,  Yukon (a one hour drive) • Two advanced‐stage gold  (±silver) deposits and past‐ producing Mt. Skukum  Mine • MOU in place with  Carcross/Tagish First  Nation 7
  • 8. Tagish Lake Gold Property History • Mt. Skukum Mine operated from 1986 to 1988 producing 77,796 oz gold • 129,059 m of surface & underground diamond drilling  • 4,830 m of tunnels completed, providing access to ore bodies • Resources open in all directions, plus other identified targets to be drilled • 300 t/d mill plus tailing reclamation site on the property NI 43‐101 Resources, Tagish Lake Gold Property (2007) Resource  Tonnes Gold (g/t) Silver (g/t) Au Equivalent  Category (oz) Measured 195,000 5.8 240.0 66,000 Indicated 1,240,000 7.6 123.5 402,000 Measured +  1,435,000 7.4 139.3 468,000 Indicated Inferred 516,000 8.0 61.9 153,000 Au:Ag ratio 50:1, cut‐off grade Au > 4g/t 8
  • 9. 9
  • 10. Skukum Creek Project • 1300 Level Portal provides access to high  grade starter pockets of gold‐silver  resources that can be mined with  minimum development requirement 11
  • 11. NI 43‐101 Resources of Skukum Creek Project (2007) Resource  Tonnes Gold  Silver  Gold Equivalent  Category (g/t) (g/t) (oz) Measured 195,000 5.8 240 66,000 Indicated 880,000 6.5 174 282,000 Measured +  1,075,000 6.4 186 349,000 Indicated Inferred 206,000 6.8 155 66,000 Au:Ag ratio 50:1, cut‐off grade Au > 4g/t 12
  • 12. 13
  • 13. 14
  • 14. Skukum Creek Project • Gold‐Silver mineralization is  related to the pyrite‐galena‐ sphalerite‐quartz breccia  zones developed in granite• High grade gold‐silver ore  bodies pinch‐swell in the  breccia zone down dip and  along strike• Mineralization extends over  400 m down dip and is open  at depth 15
  • 15. Surface Drilling at Skukum Creek Goddell Portal 16
  • 16. 17
  • 17. 18
  • 18. Goddell Project  • Gold mineralization formed along two  rhyolite dykes (G.G. Zone and P.D.  Zone) • New interpretation of drill hole cross  sections suggests that the P.D. Zone  and G.G. Zone merge at depth • Gold mineralization intensifies in the  “Merged Zone”, yielding a thicker  mineralized interval • Both the upper P.D. Zone (above G.G.  Zone) and the “Merged Zone” remain  largely untested and open in all  directionsNEW PACIFIC METALS CORP.TAGISH LAKE GOLD PROPERTY YUKON, CANADA 19
  • 19. Drill Interval Comparison, P.D. Zone CME Results  Re‐Calculated Results  CME Results  Re‐Calculated Results  Hole  From  To  Interval  Gold  From  To  Interval  True  Gold  Hole  From  To  Interval  Gold  From  To  Interval  True  Gold  (m)  (m)  (m)  (g/t)  (m)  (m)  (m)  Thckness  (g/t)  (m)  (m)  (m)  (g/t)  (m)  (m)  (m)  Thckness  (g/t)  483.20  486.20  3.00  11.59  218.95  219.66  0.71  5.93  97‐40  215.64  232.50  16.86  9.95  3.08  88‐PG2  489.30  490.80  1.50  9.98  480.20  516.80  36.60  20.74  5.20  225.33  228.99  3.66  10.03  498.40  515.30  16.90  8.35  152.76  153.93  1.17  8.81  463.80  464.00  0.20  23.45  97‐41  156.91  158.28  1.37  8.57  125.14  189.83  64.69  38.42  5.75  88‐PG3  463.80  506.20  42.40  26.13  6.23  493.50  504.80  11.30  20.80  170.65  185.32  14.67  20.35  97‐43 173.77  176.38  2.61  7.35  165.34 182.70 17.36 13.00 2.84 95‐24  452.58  459.50  6.92  13.70  446.88  460.50  13.62  6.43  7.39  128.90  130.70  1.80  13.16  97‐46  125.70  151.80  26.10  21.76  1.84  144.45  145.70  1.25  5.18  94.39  95.63  1.24  13.65  133.60  139.10  5.50  16.72  97‐47  124.35  143.10  18.75  13.60  5.52  101.53  102.80  1.27  22.80  97‐50  208.50  216.10  7.60  8.04  203.90  216.10  12.20  9.14  5.51  96‐29  94.39  134.68  40.29  36.37  3.84  105.91  107.28  1.37  18.21  185.45  187.23  1.78  15.28  127.39  134.68  7.29  9.97  192.42  193.29  0.87  5.73  97‐51  184.37  221.89  37.52  20.99  4.16  147.38  171.41  24.03  5.84  195.51  217.95  22.44  5.16  97‐32  132.28  180.87  48.59  35.63  3.81  220.05  220.79  0.74  7.89  177.16  178.27  1.11  10.15  97‐56  272.49  275.40  2.91  8.49  260.29  280.11  19.82  17.74  2.37  97‐33B  151.24  174.52  23.28  5.42  145.46  175.99  30.53  21.14  4.45  138.70  143.25  4.55  9.81  165.16  168.36  3.20  5.92  97‐57  128.00  150.70  22.70  22.16  3.89  148.40  149.05  0.65  7.95  97‐34  180.44  181.11  0.67  6.86  161.75  196.29  34.54  22.70  2.25  183.25  184.75  1.50  16.77  190.95  195.14  4.19  8.49  97‐58  183.25  194.25  11.00  9.07  7.03  187.85  194.25  6.40  7.27  129.90  130.90  1.00  5.55  146.20  147.25  1.05  13.44  97‐35  141.90  149.90  8.00  18.15  128.90  160.60  31.70  27.89  5.59  97‐59  133.15  165.95  32.80  28.83  7.94  158.90  162.50  3.60  62.98  159.50  160.60  1.10  7.37  181.75  182.50  0.75  11.18  163.50  176.50  13.00  11.07  97‐60  152.58  188.78  36.20  30.53  1.23  187.20  188.78  1.58  7.41  97‐36  190.93  192.32  1.39  11.76  162.28  200.86  38.58  28.35  4.89  97‐61 152.40  158.50 6.10 9.12 128.90 172.80 43.94 39.98 2.42 197.50  198.20  0.70  12.79  97‐63  156.10  159.90  3.80  11.15  156.10  164.63  8.53  8.29  5.17  104.85  105.37  0.52  6.79  133.50  135.20  1.70  6.38  97‐37  104.85  140.74  35.89  32.99  1.41  138.00  140.17  2.17  7.13  140.90  141.75  0.85  5.14  150.91  152.32  1.41  37.90  97‐64  131.75  170.15  38.40  36.62  1.29  161.90  162.70  0.80  5.66  157.90  158.90  1.00  9.81  97‐38  148.18  179.22  31.04  24.47  6.34  165.40  166.70  1.30  8.26  162.15  168.50  6.35  15.74  174.01  175.02  1.01  12.38  97‐65  188.70  189.90  1.20  10.73  174.10  191.30  17.20  14.51  1.94  225.37  226.25  0.88  18.55  97‐67  191.90  195.45  3.55  11.41  174.05  196.65  22.60  17.03  2.34  97‐39  234.63  235.58  0.95  27.91  223.32  240.01  16.69  10.66  3.09  338.27  338.88  0.61  8.88  238.14  238.53  0.39  6.62  90‐GT6  337.23  341.62  4.39  2.84  2.16  341.32  341.62 0.30 11.18   
  • 20. Goddell Project Drill Interval Re‐Calculation • New interpretation indicates that: – only three surface holes and 26 underground holes intercepted the  “Merged Zone” – only one surface drill hole (90‐GT6) intercepted the up‐dip extension  of the P.D. Zone • The assay intervals for the 30 holes were re‐calculated and the most  significant intercepts for the “Merged Zone” or P.D. Zone are: – Hole 97‐41 intercepted 64.7 m grading 5.75 g/t gold – Hole 88‐PG3 intercepted 42.4 m grading 6.23 g/t gold – Hole 97‐59 intercepted 32.8 m grading 7.94 g/t gold – Hole 97‐35 intercepted 31.7 m grading 5.59 g/t gold 21
  • 21. Lake Zone 22
  • 22. 23
  • 23. 24
  • 24. LEGEND Charleston Vein Tertiary Rhyolite dyke Andesite dyke Cretaceous Granodiorite Proterozoic‐Paleozoic(?) SchistSYMBOLS Vein ‐ defined, approximate Rock sample (in situ)  Rock sample (float)  25
  • 25. Tagish Lake Gold Property, 2011 Plans 1. Apply for new Yukon exploration permits for 2011 to 2016. 2. Carry out 60,000 metre underground and surface drilling program: Goddell: 23,000 m underground drilling  Skukum Creek: 13,000 m underground drilling Raca: 5,500 surface drilling other areas: 18,500 m surface drilling 3. Initiate Environmental Assessment Study to support a Quartz Mining   License application for a 300 t/d operation with possible expansion to  450 t/d and then 600 t/d in 2 successive phases.  4. Consultations leading to a Development Agreement with Carcross/  Tagish First Nation. 26
  • 26. Update on 2011 drilling program: ‐ Currently, one surface drill rig is drilling at the Raca & Chieftain Hill areas, a  second surface drill rig is at the Goddell area, and an underground drill rig is  operating at the Skukum Creek underground tunnel. ‐ First step out surface drill‐hole (Raca 11‐01) at Raca site intercepted 1,280 g/t  Ag, 1.9 g/t Au over 1.58 m. (See August 2, 2011 press release for details.) ‐ Once de‐watering is successfully completed at Goddell (mid‐August) a second  underground rig will be brought to the site for drilling. 27
  • 27. Contact Information:Investor Relations Tel: 604‐633‐1368 Fax: 604‐669‐9387 E‐mail: info@newpacificmetals.com  Visit our website at: www.newpacificmetals.com