• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Presentation - July 4, 2011
 

Presentation - July 4, 2011

on

  • 358 views

 

Statistics

Views

Total Views
358
Views on SlideShare
358
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Presentation - July 4, 2011 Presentation - July 4, 2011 Presentation Transcript

    • www.newpacificmetals.com
    • Expansion of the camp from 25 to 50 persons has been completed with the installation of services, including power, water, and communications.   Refurbishment of the 6,000 square feet geological office and core logging facility is also complete 2
    • Front and inside of the camp  3
    • Celebration of Solstice Day with Carcross/Tagish Lake First Nation  4
    • 2011 Exploration and priority drilling targets Camp  5.Chieftain Hill North 2. Goddell 4. Chieftain Hill 1. Raca3. Skukum Creek  5
    • Road Building from Raca to Chieftain Hill (Photo Taken from Skukum Creek 1300 m Level Tunnel) has been completed 6
    • Surface mapping and sampling at the Roca and Cheiftain Hill Area 7
    • Re‐interpretation of Geology at the Roca and Chieftain Hill 8
    • Surface Drilling at the Raca to test the extension of the historical discovery and four new parallel mineralized structures mapped by New Pacific Raca Skukum Creek  9
    • Drill Cross Section showing  historical drill holes and  proposed drill hole for  Section E1950 at the Raca (dashed blue lines are  planned drill holes) 3.61 m @ 2.66 g/t Au 561 g/t Ag 10
    • Surface Drilling from at the Raca has commenced on June 28, 2011 11
    • Access Road to the Chieftain Hill is completed and drilling is scheduled at mid‐August to test the soil gold anomalies that extend over 2 km long northeast of Raca Chieftain Hill  RacaSkukum Creek  12
    • Surface Mapping and sampling at the Chieftain Hill 13
    • Geological model and drill cross section showing planned drill hole to test the soil gold‐lead‐zinc anomalies (discovered in 1986 and confirmed by NUX in June 2011) for the first time at the Chieftain Hill area 14
    • Surface and Underground drilling for Skukum Creek ProjectSurface Facility at the Skukum Creek 1300m Level Adit Entrance:  Access for underground drilling and bulk sampling program and future mining new Generator settling pond Scoop First Aid trailer  15
    • Inside Skukum Creek 1300m Level: De‐icing  is completed and the Adit is at very stable conditions and is currently being prepared for underground in‐fill and step‐out drilling 16
    • Jumbo underground drill rig is on site the Skukum Creek 1300 Adit. Underground drilling is scheduled to commence on July 15, 2011  17
    • Drilling will be  carried out at the  Skukum Creek  both from  underground and  surface (blue  lines are planned  drill hole  projections) Skukum Creek  18
    • Surface and underground  Drilling Section plan at Cross Section 1400 for the SkukumCreek project.   Drilling will test the depth extension of known high grade gold‐silver mineralization and test those sections of the veins along strike that have not been drilled before  19
    • Surface and Underground Drilling for Goddell Underground drilling from the existing Goddell Decline will substantially  reduce the amount of drilling than from surface, and can been carried out  year round. Accordingly, emphasis has been placed on de‐watering the  decline to take advantage of the underground drilling strategy water settling ponds Goddell Decline First Air Trailernew generator and underground mining equipment 20
    • However, de‐watering Goddell decline has experienced delay and difficulty as gouge filled faults with widths of 2 to 3 metres have caused difficult ground conditions that have required extensive support steel frame work to be installed. 21
    • As a contingency plan, the old Goddell Gully road has been repaired and  advanced.  A surface drill rig will carry  Goddell Decline out some of the drilling that was IP Anomalies initially planned for the decline Goddell Gully road 22
    • A second Surface drill rig will arrive at the Goddell site July 6, 2011 and will carry out some of the drilling that was initially planned for the decline from the old GoddellGully road.Once de‐watering is successfully completed at the Goddell decline by the mid‐August, a second underground  rig will be brought to the site for drilling. 23
    • Surface drilling from the west of the Goddell Decline will be carried out later in the program to test the west extension of the Goddell zone, where IP geophysical anomalies have been identified by the previous owner   24