The document provides details for the construction of a 350 KLD sewage treatment plant for a CAPFs hospital in Greater Noida. It will use SBR technology and require 250 square meters of area. The process flow involves screening and grinding of inlet sewage, treatment in an equalization tank, SBR tank, and chlorine contact tank, with solid handling and disposal or treated water reuse. Design parameters include a 350 cubic meter per day design flow, BOD and COD removal to less than 10 and 50 mg/L respectively, and pH of 6.5-8 for treated water. Drawings show the layout and dimensions of tanks, pumps, and other equipment.