nearmap Rail

11,534
-1

Published on

nearmap rail launch presentation

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
11,534
On Slideshare
0
From Embeds
0
Number of Embeds
18
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

nearmap Rail

  1. 1. Insert title
  2. 2. Insert title nearmap Rail Simon Crowther, CEO 2
  3. 3. Insert title nearmap Rail Paul Peterson Senior VP Product & Engineering 3
  4. 4. nearmap Insert title 4
  5. 5. Current : Clear : Change Insert title  Current – What’s on the ground now  Clear – Unrivalled clarity  Change – Monitor change over time 5
  6. 6. Current : Clear : Change Insert title Images published in days Publishing time Traditional 3mo 6mo 9mo 1yr Wagga Wagga floods (7th March 2013) – nearmap was the only company to capture the flooded areas and publish within days 6
  7. 7. Current : Clear : Change Insert title High resolution enables • close inspection • accurate digital measurements • decision making 7
  8. 8. Terrigal NSW Insert title 8
  9. 9. Insert title
  10. 10. Insert title
  11. 11. Insert title
  12. 12. Insert title
  13. 13. Insert title
  14. 14. Insert title
  15. 15. Insert title
  16. 16. Insert title
  17. 17. Insert title
  18. 18. Insert title
  19. 19. Current : Clear : Change Insert title Accurate digital measurements reduce site visits 19
  20. 20. Insert title Measure areas Measure lengths Measure radius Distance between
  21. 21. Current : Clear : Change Insert title Track changes over time with nearmap’s Timeline 21
  22. 22. Insert title Survey date selected Timeline: rich archive Historic survey markers Currently selected survey
  23. 23. Current : Clear : Change Insert title Visually analyse the impact of environmental events 23
  24. 24. Insert title Bundaberg pre-floods November 2012
  25. 25. Insert title Bundaberg Floods January 2013
  26. 26. Insert title Blue Mountains – pre bush fire Aug 2013
  27. 27. Insert title Blue Mountains – post bush fire Nov 2013
  28. 28. Coverage Insert title We now capture over 85% of Australia’s population 28
  29. 29. Reliable, Fast Insert title World-class uptime World-class performance 29
  30. 30. Insert title 30
  31. 31. nearmap Rail Insert title Reliable and timely visual analytics for the ports, mining and rail industries Port Rail Mine 31
  32. 32. Current : Clear : Change Insert title  Current – What’s on the ground now  Clear – Unrivalled clarity  Change – Monitor change over time 32
  33. 33. Current : Clear : Change Insert title Port Hedland captured 3rd January 2014 33
  34. 34. Insert title Port Hedland 3 Jan 2014
  35. 35. Current : Clear : Change Insert title Fremantle to Kalgoorlie captured 20th January 2014 35
  36. 36. Insert title FremantleKalgoorlie 20 Jan 2014
  37. 37. Current : Clear : Change Insert title Nov 28 - Port Hedland to Yarrie Mine (Goldsworthy Railway) November Dec 23 Fremantle to Bunbury Jan 20 – Fremantle to Kalgoorlie Cyclone Christine December January Dec 4 - Port Hedland towards Newman (Mount Newman Railway) Jan 3 - Port Hedland to Yarrie Mine (Goldsworthy Railway) 37
  38. 38. Current : Clear : Change Insert title High resolution allows for close inspection and timely, informed decision making 38
  39. 39. Insert title
  40. 40. Insert title
  41. 41. Insert title
  42. 42. Insert title
  43. 43. Insert title
  44. 44. Insert title
  45. 45. Insert title
  46. 46. Insert title
  47. 47. Insert title Dampier
  48. 48. Insert title
  49. 49. Insert title
  50. 50. Insert title
  51. 51. Insert title Port Hedland 3 Jan 2014
  52. 52. Insert title Newman Mine Sep 2013
  53. 53. Insert title Newman Mine Sep 2013
  54. 54. Insert title Newman Mine Sep 2013
  55. 55. Insert title Newman Mine Sep 2013
  56. 56. Insert title Newman Mine Sep 2013
  57. 57. Insert title Newman Mine Sep 2013
  58. 58. Insert title Newman Mine Sep 2013
  59. 59. Current : Clear : Change Insert title Inspect damage after environmental events such as Cyclone Christine 59
  60. 60. Insert title Goldsworthy Line (Port Hedland to Yarrie Mine) – pre Cyclone Christine
  61. 61. Insert title Goldsworthy Line (Port Hedland to Yarrie Mine) – post Cyclone Christine
  62. 62. Coverage Insert title • Committed to being the most comprehensive and frequently updated mapping solution for rail infrastructure connecting mines and ports
  63. 63. Coverage Insert title 2,000 km of rail in just 2 months Date 28 Nov 2013 4 Dec 2013 Rail line Corridor length (kms) Operator Port Hedland to Yarrie Mine (Goldsworthy Railway) 198 BHP Billiton Port Hedland towards Newman (Mount Newman Railway) 128 Aurizon 160 Brookfield 23 Dec 2013 Fremantle to Bunbury 3 Jan 2014 Port Hedland to Yarrie Mine (Goldsworthy Railway) 198 BHP Billiton 3 Jan 2014 Port Hedland to Cloud Break Mine (Fortescue Railway) 292 Fortescue Metals Group 958 Brookfield 20 Jan 2014 Fremantle to Kalgoorlie 63
  64. 64. Features Insert title Exciting features for Rail 64
  65. 65. Source Photos Insert title New for nearmap Rail • Access to source photos 65
  66. 66. Insert title
  67. 67. Insert title Goldsworthy Line (Port Hedland to Yarrie Mine) – post Cyclone Christine
  68. 68. Insert title
  69. 69. Data Layers Insert title New for nearmap Rail • “Land Features” data layers 69
  70. 70. Insert title
  71. 71. Insert title
  72. 72. Insert title
  73. 73. Insert title
  74. 74. Insert title
  75. 75. Elevation Profile Insert title New for nearmap Rail • Elevation profile 75
  76. 76. Elevation profile tool Insert title 76
  77. 77. Rail List Insert title New for nearmap Rail • Easy access to Rail captures 77
  78. 78. AutoTrack Insert title New for nearmap Rail • AutoTrack 78
  79. 79. Insert title
  80. 80. nearmap Rail Insert title • • • • • • • • • Ultra-high resolution imagery Accurate measurements View change over time Coverage commitment Access source photos New data layers Elevation profile Rail list AutoTrack
  81. 81. nearmap Rail Insert title Available now nearmap.com/rail 81
  82. 82. Additional Insert title Applications Technology extends to other corridors • Highways • Pipelines • Transmission lines
  83. 83. Insert title
  84. 84. Insert title
  85. 85. Insert title
  86. 86. Insert title
  87. 87. Insert title
  88. 88. Disclaimer Insert title Some of the information contained in this presentation contains “forward-looking statements” which may not directly or exclusively relate to historical facts. These forwardlooking statements reflect nearmap limited’s current intentions, plans, expectations, assumptions and beliefs about future events and are subject to risks, uncertainties and other factors, many of which are outside the control of nearmap limited. Important factors that could cause actual results to differ materially from the expectations expressed or implied in the forward-looking statements include known and unknown risks. Because actual results could differ materially from nearmap limited’s current intentions, plans, expectations, assumptions and beliefs about the future, you are urged to view all forward-looking statements contained herein with caution. 88
  89. 89. Thank you Insert title 89

×