Your SlideShare is downloading. ×
0
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
The bubble slideshow
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

The bubble slideshow

1,831

Published on

Published in: Technology, Art & Photos
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,831
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
30
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Atrium Renovation Area July 6, 2010
  • 2. Bird’s Eye View of Brickyard Bubble July 6, 2010
  • 3. The Bubble will be 50x80 ft. July 6, 2010
  • 4. Frame for Brickyard Bubble July 6, 2010
  • 5. The Bubble will be to the left of D.H. Library July 6, 2010
  • 6. Bubble will be Located Between Harrelson and Atrium July 6, 2010
  • 7. Crews will Lay Utility Wire Under Bricks July 6, 2010
  • 8. Outside Seating will Remain in Place July 6, 2010
  • 9. Outside Seating Area and D.H. Hill July 6, 2010
  • 10. Wall Dividing Construction Area and Temporary Serving Area July 6, 2010
  • 11. Temporary Home of Li’l Dinos and Chick-fil-A July 6, 2010
  • 12. Temporary Serving Area July 6, 2010
  • 13. New Seating Area Open Fall 2011 July 6, 2010
  • 14. Moving Along as Scheduled July 6, 2010
  • 15. Bare Floors and Walls July 6, 2010
  • 16. The 50x80 ft. Bubble Takes Shape July 13, 2010
  • 17. Monday Marked the First Day of Assembly July 13, 2010
  • 18. A View of the Bubble Including Harrelson July 6, 2010
  • 19. Looking Through towards East Campus July 6, 2010
  • 20. Overlooking the Top of the Bubble July 13, 2010
  • 21. The Bubble Takes Up Limited Space in the Brickyard July 13, 2010

×