Bryan dairy progress 6-13-11

  • 188 views
Uploaded on

Bryan dairy progress 6-13-11

Bryan dairy progress 6-13-11

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
188
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. March 1, 2011 Future Corporate Office & Production Facility For PrimeNet Direct Marketing Solutions 7320 Bryan Dairy Road, Largo, FL 33777
  • 2. March 9, 2011 Future Data Production Future Production Floor Future Home of Account Management Cubicles Future Production Floor Future Production Floor Future Data Center & Hand Assembly Areas
  • 3. March 29, 2011 Future Front Entrance Front Office’s Have All Been Framed Break Room Parking Lot Break Room Front Office’s Have All Been Framed
  • 4. March 29, 2011 Production Floor Secure Storage Area/Fulfillment/Machine Shop Fire Alarms – Have Been Installed Production Floor Production Floor Secure Storage Area/Fulfillment/Machine Shop
  • 5. March 29, 2011 Demolition Begins Future Home of Receptionist Office Future Home of Training Room – Front Office Future Home of Prepress Department Front Office Corridor – Seen From Lobby Conference Room – Front Office
  • 6. March 29, 2011 Demolition Continues Future Home of Data Processing & Laser Setup Future Home of Art Department Future Home of Account Management Cubicles Front Lobby Future Home of Art Department
  • 7. April 4, 2011 Future Home of Client Conference Room Production Floor BuildBlocks for Data Center Break Room Hallway leading to Prepress, Art Department, Laser Offices & Production Production Floor – Future home of Heidelberg's
  • 8. April 4, 2011 The new building is hurricane category 3 (CAT 3) certified. Inside of the building, we are using BuildBlock insulating concrete forms to build the data center, which will also be Cat 3 certified. It’s an enclosed structure within the Brian Dairy facility. The cement block walls and ceiling are reinforced by rebar and filled with a special waterproof material. Our state of the art Data Center will be made with
  • 9. April 6, 2011 Future home of Heidelberg's BuildBlocks for Data Center New Heidelberg Offset Press Production Floor Production Floor BuildBlocks for Data Center
  • 10. April 6, 2011 Future Home of Laser Production – 4 HLC Lasers Future Home of Data Processing & Laser Setup Marking The Locations Of The New Heidelberg Presses Future Home of Heidelberg Presses Production Floor Production Floor
  • 11. April 13, 2011 Double Checking The Location Of The Two Heidelberg Presses The Cement Is Going To Be Cut To Put In Steel Rebar Footings To With Stand The Weight Of The Presses
  • 12. April 13, 2011 Beginning To Cut The Cement For The New Presses Wetting The Cement For The Cut! The First Cut Has been Made!
  • 13. April 19, 2011 The Cement Has Been Cut For The Future Home Of Our New Presses
  • 14. April 19, 2011 Data Center Walls Have Arrived Lots Of BuildBlock For The Walls Of The Data Center Unpacking Of The Walls 1 st Five Feet Of Data Center Walls Are Going Up!
  • 15. April 19, 2011 Account Management Cubicles New Heidelberg Press Steel Rebar Is In Place For The Footings Of The Cement For The Heidelberg Press Entrance to Offices From Production Floor
  • 16. April 27, 2011 Future home for 2 Xerox iGen, 4 Xerox HLC printers Steel Rebar Is In Place To Secure The BuildBlocks Used To Build The Walls Of The Data Center Future Home of Data Center Offices The Cement Has Been Poured For The Heidelberg Presses.
  • 17. April 27, 2011 Entrance To The Data Center Receiving Dock The 1 st Five Feet Of The Data Center Walls Are Stabilized Until The Cement Is Dry Laser
  • 18. April 29, 2011 Old Data Center – Future Storage Inside Of The Data Center, The 2 nd 5 Feet of BuildBlocks Have Been Installed And Are Stabilized Until The Cement Is Dry. Account Management Data Center Offices
  • 19. April 29, 2011 See The Cement IN The Walls Of The Data Center? Data Center Walls Data Processing & Laser Setup Data Center Walls Are Stabilized Until Cement Is Dry Laser Production – location of future HLC Printers
  • 20. May 3, 2011 Data Center Interior 1 st Shift Production Supervisor Office Future Home of Hand Assembly Area USPS & Production Offices Data Center Interior Future Home of Hand Assembly Area
  • 21. May 4, 2011 Heidelberg Slabs waiting for cement pour for wiring
  • 22. May 11, 2011 View Of The Cement Data Center Walls USPS & Production Offices Getting The Ceiling Rods In Place To Finalized The Data Center Data Center
  • 23. May 13, 2011 Account Management Cubicles Future home of Account Management Laser Department Production Looking At Hand Assembly Area Future Home of Training Room Outside of Data Center
  • 24. May 13, 2011 Future Offices of Purchasing and Accounting Roof of Data Center
  • 25. May 16, 2011 Data Production & Laser Setup Wood for Machine Shop Tables Hand Assembly Area Production Area Production Area Hand Assembly & Staging Areas
  • 26. May 16, 2011 Outside of Data Room Next to Account Management Air Conditioning Duct Installation? Future Home of Account Management Data Center Construction Data Center Construction Entrance To Data Center
  • 27. May 16, 2011 From Offices Corridor Flooring Tiles
  • 28. May 17, 2011 Inside of Hand Assembly Area Account Management Hand Assembly Area Outside of Data Room before Hand Assembly Built Outside of Data Room before Hand Assembly Built Data Center Interior w/cuts for the UPC’s
  • 29. May 20, 2011 Building Supplies Going Into Lettershop From Account Managers Area Hand Fulfillment Area Walls & Floor In Process Future Warehouse Area More Building Supplies Heidelberg Press Slab before concrete pour for wiring
  • 30. May 20, 2011 Handroom Old Server Room Being Converted to Storage Data Center Data Center Account Management
  • 31. May 24, 2011 Break Room Training Room Hand Assembly Looking into the training room and IT Installation of New Heidelberg Presses
  • 32. May 24, 2011 Pipe Drain For Presses Data Center Training Room
  • 33. May 27, 2011 Laser Room
  • 34. June 1, 2011 New Heidelberg Press Air Pump For Press Secured Storage Area Wiring For Our House Compressed Air Air Distribution In Room Hallway Looking Into Laser
  • 35. June 3, 2011 Break Room Front Entrance Accounting Office Getting Carpet Account Services Installation Sound Proofing The Ceiling Data Center Account Services
  • 36. June 3, 2011 Voltage converter for new Heidelberg press Production Hand Room Hand Room Air Conditioning Into Data Center High Ceiling In Hand Room
  • 37. June 3, 2011 Creative Services Pffice Laser Room Pre Press Production Floor Production Floor Data Production
  • 38. June 3, 2011 Visitor Entrance Front Office Hallway Sales Conference Room Board Room Looking Into Visitor Lobby Board Room Data Production
  • 39. June 3, 2011 Data Production Heidelberg Press Ready To Go President’s Office Laser Room Training Room Break Room