Your SlideShare is downloading. ×
0
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Pikoo Project - Diamond Results Companion Presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Pikoo Project - Diamond Results Companion Presentation

208

Published on

Presentation put together for a webcast to help explain the preliminary diamond results from the PK 150 kimberlite at the Pikoo Diamond Project in Saskatchewan, announced November 5, 2013.

Presentation put together for a webcast to help explain the preliminary diamond results from the PK 150 kimberlite at the Pikoo Diamond Project in Saskatchewan, announced November 5, 2013.

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
208
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Pikoo Project Preliminary Diamond Results November 5, 2013 TSX-V: NAR
  • 2. Cautionary Statement This presentation contains projections and forward looking information that involve various risks and uncertainties, including, without limitation, statements regarding the potential extent of mineralization and reserves, exploration results and plans and objectives of North Arrow Minerals Inc. These risks and uncertainties include, but are not restricted to, the amount of geological data available, the uncertain reliability of drilling results and geophysical and geological data and the interpretation thereof and the need for adequate financing for future exploration and development efforts. There can be no assurance that such statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. These and all subsequent written and oral forward-looking statements are based on the estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward looking statements should circumstances or management's estimates or opinions change. TSXV:NAR
  • 3. Pikoo Project – East Central SK  Identified through regional targeting and sampling of the Sask Craton by Stornoway  Located between La Ronge, SK & Flin Flon, MB – more than 200km from nearest kimberlite field (FALC)  Good local power and transportation infrastructure; within 10 km of SK Hwy 911.  Multiple KIM trains on 33,000ha property - chemistry suggestive of derivation from well within the diamond stability field.  North Arrow can earn an 80% from Stornoway by completing 2,000 m drill program and testing kimberlite for diamonds [now complete]  Kimberlite was discovered in nine of ten drill holes completed in 2013 (including PK150)
  • 4. Pikoo Project – PK150 Diamond Results  209.7 kg sample from drill core  745 diamonds > 0.106 mm  23 diamonds > 0.85 mm  Total Carats >+0.85mm = 0.2815  > 95% of diamonds are intact, white octahedrons or aggregates Number of Diamonds per Sieve Size (mm Square Mesh Sieve) Sample Weight Dry Kg +0.106 -0.150 +0.150 -0.212 +0.212 -0.300 +0.300 -0.425 +0.425 -0.600 +0.600 -0.850 +0.850 -1.18 +1.18 -1.70 +1.70 -2.36 Total Stones Total Carats +0.85mm 209.7 392 199 65 27 19 20 21 1 1 745 0.2815
  • 5. PK150 Microdiamond Comparison CH6, Chidliak, NU 9/09; VK; 399kg Kelvin, Kennady North, NWT 10/12; HK; 394 kg PK150, Pikoo, SK 11/13; HK; 210 kg
  • 6. PK150 Aerial View
  • 7. PK150 Aerial View PK 151 PK 150
  • 8. PK150 Drilling Pattern 13PK10 PK151 PK150 13PK09 13PK06 13PK08 Pikoo Project PK150 and PK151 Drilling Date: Oct 2013 Author: JP Drawing: PI040 120 m Scale: 1:3,000 0 30 60 Projection: UTM NAD83 Zone 13 120 m
  • 9. PK150 Drilling Pattern 13PK10 PK151 PK150 13PK09 13PK06 13PK08 Pikoo Project PK150 and PK151 Drilling Date: Oct 2013 Author: JP Drawing: PI040 120 m Scale: 1:3,000 0 30 60 Projection: UTM NAD83 Zone 13 120 m
  • 10. PK150 Drilling Pattern 13PK10 PK151 PK150 ? 13PK09 13PK06 ? ? ? 13PK08 Pikoo Project PK150 and PK151 Drilling Date: Oct 2013 Author: JP Drawing: PI040 120 m Scale: 1:3,000 0 30 60 Projection: UTM NAD83 Zone 13 120 m
  • 11. Pikoo Project – KIM sampling North Pikoo 2013 kimberlite discoveries South Pikoo 10 km PK 150 Excellent Chemistry Slave Pikoo
  • 12. Pikoo – FALC Comparison 10 km “To-scale” comparison of the Pikoo property outline with the distribution of kimberlites at Fort a la Corne
  • 13. Principal Diamond Projects Victoria Island Qilalugaq (NU) Redemption (NT) • • • • • • 28,400 acres Near Diavik & Ekati mines Unexplained KIM trains >$12M dataset Work underway Earning a 55% from Arctic Star • • • • Large tonnage resource Potential for high value stones Bulk sample required Doris Under option from Stornoway Mel (NU) • • • Luxx (NU) Lac de Gras (NT) • • • • >300,000 acres Near Diavik & Ekati mines 1st $5M funded by Dominion Diamonds ~$3M 2013 program Pikoo (SK) in progress • Diamondiferous Kimberlite field discovered in 2013 • 80/20 JV pending notice to Stornoway Grassroots, KIM targets Work underway 100% NAR • • • Grassroots, KIM targets Work underway 100% NAR Timiskaming (ON/QC) • • • Six kimberlites Additional targets 80/20 JV with Stornoway
  • 14. Way Forward – 2013/14 Project Location Interest Comment Qilalugaq Nunavut 80% (60%) Pikoo Lac de Gras Saskatchewan NWT 80% (60%) 45% Redemption NWT 55% Luxx Mel Timiskaming Nunavut Nunavut Ontario 100% 100% 80% Mob/planning underway for 2014 program ~1,500t sample in July 2014 Q1-4 diamond valuation Q4/14 or Q1/15 Follow up exploration 2014 Results for ~$3M exploration program Q4 2013 >750 o/b drill holes, >1,200 samples 2013 results – Falcon gravity; 350 till samples; dbase compilation; target definition 2013 results – airborne geophysics,; till sampling 2013 results – airborne geophysics,; till sampling Database compilation
  • 15. Corporate Information  Capitalization (October 31, 2013) Contact: TSX Venture - NAR Issued: 42.1 M Options & Warrants 3.6 M Fully diluted: 45.7 Cash: Ken Armstrong President & CEO 604-668-8354 604-889-5252 Listing: >$6.0M Nick Thomas Manager Investor and Community Relations 604-668-8355 www.northarrowminerals.com nthomas@northarrowminerals.com TSXV:NAR

×