Erp implementations in industries
Upcoming SlideShare
Loading in...5
×
 

Erp implementations in industries

on

  • 533 views

 

Statistics

Views

Total Views
533
Views on SlideShare
533
Embed Views
0

Actions

Likes
0
Downloads
7
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Erp implementations in industries Erp implementations in industries Document Transcript

  • ERP Implementations Activities - Analysis Keshav Trehan, Keyur Shah, Narayanan PalaniTools used along with ERP Applications: Category Software / Tool / Technology SAP Applications 46.c, 4.7, ECC5.0, ECC 6.0 SAP BusinessObject GRC 5.2, 5.3( AE, RAR, Firefighter, Role Expert) SAP Business Suit CRM, SRM, HR SAP Netweaver SAP IDM, EP and XI SAP Reporting Tool SAP Solution ManagerSAP Implementation at Copart U.S.A:Steps: Design, blueprint, architecture and landscape development for SAP systems for Copart SAPImplementation Program.Basis related Activities for System Landscape setup. Security and GRCconfiguration, Implement and Configuration of GRC5.3. , Designing CUA setup, Role Matrix, UserProvisioning and facing the Client challenges. Design SOD Matrix for each Component for SAP.Activities during SAP Upgrade and Support at Varian Medical Systems-UK / USA:  Client Maintenance  Transport Management  Applying Support packs through SPAM, SDM and JSPM  System Monitoring  Kernal Upgrade  System Copy  Scheduling Background Jobs  System Trouble shooting  Printer Management  User Management  Role Management  Applied the Enhancement Packages.  Creating of New User accounts and assigning roles to users in Production via VIRSA (AE 5.2 version)
  •  Checking the SOD Conflicts (Risk Violations) via SAP GRC tool (AE 5.2 version) and forwarding to IT security stage.  Mitigating the requests having SOD conflicts and approved to production  Cancelling AE requests and Re-routing AE requests to next stage  Forwarding AE requests to other role owners  Uploading newly created roles into AE request system  Uploading new company codes into AE request system  Changing the role owners for existing roles in AE request system  Creating new firefighter ids and Mapping firefighter ids to regular uid Mapping firefighter ids to Firefighter ID owner  Generating report for SOD Conflicts in Firefighter  Generating Log report for Firefighter Ids in Production systems  User Authorization & Profile Management  Role Administration and Management  Up loading and down loading the roles  Assigning Licensing type to users depending on assigned roles for dialog Users in Production systems.  Sent Users License reporting, audit and management data to SAP for all Production systems (via USMM)  Maintained the Portal user profiles  OSS Note search for system problems and coordinating with SAP support.  Retrieved the License information from Varian SAP systems and sent to SAP for License audit.Support Activities at Siemens – UK:  User Profile management  Roles Management  Handled OSS related issues((like license, keys, connections, User Creation ,Reset password, message creation ,etc.,)  Transport Management  Client Management  DB Refresh  Printer Management  Background Jobs Scheduling  Applying Support packs  Applying Kernal Upgrade  System Monitoring  Applying notes using SNOTESAP Implementation (End to End) at WIMCO- India:  Installed ECC 5.0 and Solution Manager on HP UNIX.  Applied support packages  Kernel Upgrade  Printer Management  Applying notes using SNOTE  Transport Management System across the R/3 system Landscape  Daily Check List  Database Administration using BRTOOLS  User Authorization & Profile Management  Trouble shooting System problems by analyzing system log, ABAP Dump  Client Management
  •  Analysis updates monitoring and locks entries  GUI MaintenanceActivity of SAP Basis & Security Consulting profiles at Mittal Steels- UK & Netherlands:  User Authorization & Profile Management  Roles Maintenance  Created Master and Derived Roles  Maintained Org Level for FICO and MM Modules  Maintained SAP system in support of finance and security policies.  Transport ManagementActivities of SAP Basis Associate Consultants at AP POWER GENERATION CORP:  User Authorization & Profile Management  Roles Maintenance  Scheduled Background Jobs  System Monitoring  Client Maintenance  Applying Support Packs  Transport ManagementSupport Activities at Lapp India Pvt, Bangalore:  System Refresh (Database copy from PRD to QTY)  Performed Post system installation  Upgrading Kernel for three system Landscape.  Applying Latest Support packages  Environment: SAP ECC6.0 , Database Oracle 10.2, OS Suse-LinuxUp gradation activities at Falcon Tyres Limited, Mysore:  Combined Upgrade and Unicode Conversion from 4.7 to ECC6 + EHP4 (Stack 06)  Hardware migration for Production and Development System from Windows 2003 IA64 server to Windows 2003 X64 server with Service pack 3  Database Upgradation from MS-SQL2000 to SQL2005 SP3.  Perform the System Copy of Development and Production Using Homogeneous System Copy  Performed Post system installation  Solution manager 7.0 installation and Configuration.
  • Integration Projects AnalysisSAP Integration project details at SABMiller Group:The SABMiller Group is the world’s 2nd largest brewing company with turnover of $21bn and operationsin 60 countries (30 primary markets).Businesses across in Europe, Latin-America, South Africa, Africa andAsia [specifically India]. The main reason for Project Triumph is to improve the efficiency of processesand quality of information that we have available to make the right decisions, globally, regionally andlocally. The R/3 modules being configured are SAP FI, HR, CO, Procurement and MDM .SABMiller Headquarter is located at South Africa.It has engaged With Accenture India for SAP R/3 Upgradation and ongoing support an enhancement.Responsibilities of SAP Basis Consultants during Integration Phase: Design/Development /correction of roles with appropriate authorization for the various users across SAP FI, CO, Procurement and MDM modules of SAP Run and analyze trace for missing authorization and take corrective action using tcode SU53 and ST01. Creating (Child and parent role), Adjustment, deletion and role copy based on client request are worked on Accenture SWB automation tool. Portal (NWBC) access control support for SA region and Global Template. Month-end we are doing GRC - PC Job scheduling and monitoring. Creating CHARM request and Transport change requests from the DEV server to QAS and Production Server using CHARMImplementation activities of ECC 6.0 , BI,CRM,SRM,SCM,Solution managers at JSW-Ispat Ltd during SAP Integration: System Refresh from production servers to Quality servers. EHP upgrade using SUM tool. DR Server configuration. Oracle upgrade from 10.2.0.2 to 10.2.0.5 . ADS Configuration and Digital Signature configuration. Performed the Configuration of Early Watch alerts, System Monitoring and Central System Administration in SOLUTION MANAGER 7.0. Upgrading kernels in HP-UX servers and Windows servers (Development, Quality, and Production) for ECC, CRM, BIW, SRM, SCM, and Optimizer. Applying Support packs and Add-ons, SNOTE in Development, Quality, and Production servers for ECC, CRM, BIW, SRM, SCM. Created RFC Destinations between ECC to CRM, BI, SRM, SCM (Development, Quality, Production servers). Queues Administration with using SMQS, SMQ1, SMQ2, SMQ3, and SM58. Configuring Transport Management System for ECC, CRM, BIW, SRM, and SCM. Moving request in SAP level and OS level. Scheduling and Creating Background jobs and creating variants, assigning variants to background jobs. Creating clients and Assigning logical system to clients.
  •  Client copy within the same system (local), remote systems and Client export/ client import and client deletion. Configuring the parameters in System profiles Experience in Installation of SAP dialog instances on Production servers & ECC 6.0 IDES on Windows Platform. Having the knowledge of Live Cache, TREX, and Optimizer. Maintaining and Scheduling File system backup online backups and Archive backups using Data Protector. Maintaining the Disaster Recovery Server at remote site. Maintaining backups and restoring with using Data Protector. Starting and Halting clusters, Sap Instances, HP-UX servers. Starting and stopping Java instance in EP. Maintenance of Transport Management System. Client Administration. Queues Administration. Background Job maintenance. SAP License Management. CCMS (Profiles, Operation modes, Monitoring). Spool maintenance.