<ul><li>Street Improvements </li></ul><ul><li>Bike Lane Installations </li></ul><ul><li>3 rd  Court Water Main </li></ul><...
<ul><li>Current Street Resurfacing Program </li></ul>
<ul><li>www.SMConstruct.org </li></ul>Street Paving and Bicycle Network Striping
Construction of New Gutters
Construction of New Gutter
Preparing Streets for Paving
Street Grinding
Asphalt Paving in Progress
Asphalt Paving
Bike Lane Striping
<ul><li>Complete  Green Street Project   </li></ul><ul><li>Construction In Progress </li></ul>Ocean Park Blvd
 
Ocean Park Blvd  Getting ready for Excavation
Ocean Park Blvd – Traffic Control
Ocean Park Blvd – New Curbs
Ocean Park Blvd BioSwale  Construction
Ocean Park Blvd - Sidewalk widening
Ocean Park Blvd – Sidewalk widening
Ocean Park Blvd – New Curb construction
<ul><li>Construction In Progress </li></ul><ul><li>3 rd  Court - from Arizona to Wilshire  is Complete </li></ul>3rd Court...
Water Main at 3 rd  and Arizona
3 rd  Court – New Water Main
3 rd  Court – Water Valve Installation
3 rd  Court Trenching for New Water Main
3 rd  Court – New Water Main
<ul><li>20 TH   and  Cloverfield Improvements </li></ul><ul><li>Pier Improvements </li></ul><ul><li>California Incline </l...
Upcoming SlideShare
Loading in …5
×

Infrastructure improvements

283 views
216 views

Published on

Various Infrastructure Construction Projects

Published in: Education, Business, Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
283
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Infrastructure improvements

  1. 1. <ul><li>Street Improvements </li></ul><ul><li>Bike Lane Installations </li></ul><ul><li>3 rd Court Water Main </li></ul><ul><li>Water Main Replacement (Various Locations) </li></ul><ul><li>Ocean Park Green Street Improvements </li></ul>Infrastructure Improvements www.SMConstruct.org
  2. 2. <ul><li>Current Street Resurfacing Program </li></ul>
  3. 3. <ul><li>www.SMConstruct.org </li></ul>Street Paving and Bicycle Network Striping
  4. 4. Construction of New Gutters
  5. 5. Construction of New Gutter
  6. 6. Preparing Streets for Paving
  7. 7. Street Grinding
  8. 8. Asphalt Paving in Progress
  9. 9. Asphalt Paving
  10. 10. Bike Lane Striping
  11. 11. <ul><li>Complete Green Street Project </li></ul><ul><li>Construction In Progress </li></ul>Ocean Park Blvd
  12. 13. Ocean Park Blvd Getting ready for Excavation
  13. 14. Ocean Park Blvd – Traffic Control
  14. 15. Ocean Park Blvd – New Curbs
  15. 16. Ocean Park Blvd BioSwale Construction
  16. 17. Ocean Park Blvd - Sidewalk widening
  17. 18. Ocean Park Blvd – Sidewalk widening
  18. 19. Ocean Park Blvd – New Curb construction
  19. 20. <ul><li>Construction In Progress </li></ul><ul><li>3 rd Court - from Arizona to Wilshire is Complete </li></ul>3rd Court Water Main Replacement
  20. 21. Water Main at 3 rd and Arizona
  21. 22. 3 rd Court – New Water Main
  22. 23. 3 rd Court – Water Valve Installation
  23. 24. 3 rd Court Trenching for New Water Main
  24. 25. 3 rd Court – New Water Main
  25. 26. <ul><li>20 TH and Cloverfield Improvements </li></ul><ul><li>Pier Improvements </li></ul><ul><li>California Incline </li></ul><ul><li>Pico Library </li></ul>www.SMConstruct.org

×