Your SlideShare is downloading. ×
Infrastructure improvements
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Infrastructure improvements

180

Published on

Various Infrastructure Construction Projects

Various Infrastructure Construction Projects

Published in: Education, Business, Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
180
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1.
    • Street Improvements
    • Bike Lane Installations
    • 3 rd Court Water Main
    • Water Main Replacement (Various Locations)
    • Ocean Park Green Street Improvements
    Infrastructure Improvements www.SMConstruct.org
  • 2.
    • Current Street Resurfacing Program
  • 3.
    • www.SMConstruct.org
    Street Paving and Bicycle Network Striping
  • 4. Construction of New Gutters
  • 5. Construction of New Gutter
  • 6. Preparing Streets for Paving
  • 7. Street Grinding
  • 8. Asphalt Paving in Progress
  • 9. Asphalt Paving
  • 10. Bike Lane Striping
  • 11.
    • Complete Green Street Project
    • Construction In Progress
    Ocean Park Blvd
  • 12.  
  • 13. Ocean Park Blvd Getting ready for Excavation
  • 14. Ocean Park Blvd – Traffic Control
  • 15. Ocean Park Blvd – New Curbs
  • 16. Ocean Park Blvd BioSwale Construction
  • 17. Ocean Park Blvd - Sidewalk widening
  • 18. Ocean Park Blvd – Sidewalk widening
  • 19. Ocean Park Blvd – New Curb construction
  • 20.
    • Construction In Progress
    • 3 rd Court - from Arizona to Wilshire is Complete
    3rd Court Water Main Replacement
  • 21. Water Main at 3 rd and Arizona
  • 22. 3 rd Court – New Water Main
  • 23. 3 rd Court – Water Valve Installation
  • 24. 3 rd Court Trenching for New Water Main
  • 25. 3 rd Court – New Water Main
  • 26.
    • 20 TH and Cloverfield Improvements
    • Pier Improvements
    • California Incline
    • Pico Library
    www.SMConstruct.org

×