Manage power consumption, cooling delivery, and temperature set points at a rack level ...

Manage power consumption, cooling delivery, and temperature set points at a rack level

Reduce your cooling and electrical costs by up to 50%

Reduce the costs to plan, build, and implement your new facility by up to 80%

Grow horizontally—from 1 to 100 units—without disrupting existing operations?

Can be installed or Re-Located anywhere with the only requirements being power and network connectivity

Provide a complete turnkey solution within weeks vs. years.

Statistics

Views

Total Views
561
Views on SlideShare
555
Embed Views
6

Actions

Likes
0
Downloads
11
Comments
0

2 Embeds 6

http://www.linkedin.com 3
https://www.linkedin.com 3

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • Proprietary and Confidential Copyright Elliptical Mobile Solutions 2009

Remote Office 2010 Remote Office 2010 Presentation Transcript

  • ELLIPTICAL MOBILE SOLUTIONS The Advantages of Micro-Modular Data Centers
  • What are Micro-Modular Data Centers (MMDCs)
    • R.A.S.E.R. : 42U
    • Re-locatable Enclosure
    C³-S.P.E.A.R.: 24U Mobile, Power Assisted Enclosure Copyright Elliptical Mobile Solutions 2010, www.ellipticalmobilesolutions.com, They have all of the characteristics of a Data Center Building. They are designed specifically to support and protect High Density IT equipment.
  • EMS Produces the only Micro-Modular Data Centers in the World today!
    • S.P.E.A.R. : 22U Armored, Mobile , Power Assisted Enclosure
    • R.A.S.E.R. : 42U Re-locatable Enclosure
    C³-S.P.E.A.R.: 24U Mobile, Power Assisted Enclosure
      • Patented, On-board Cooling System - No external cooling source required
      • Standard 19” Rack Systems - Vendor and Solution Neutral
      • Mobile/ Re-locatable to easily move from location to location
      • Patented Shock and Vibration System ensures no damage to equipment occurs during move
      • Passive and Active On-Board Fire Suppression eliminates fires before damaging equipment
      • Completely Sealed Systems - equipment inside is protected from the elements
      • Fully Scalable Systems - useful in a single, remote office to a large data center
    CHARACTERISTICS AND BENEFITS
  • IT Challenges Today
    • Current Data Center Practices Out Dated
      • Large up front cost before day one of production
      • IT demand moves faster than construction
    • OPEX
      • 2 out of 3 watts wasted on cooling
      • Maintenance on under utilized infrastructure
      • Cooling Infrastructure driving total electricity usage out of proportion
      • Cost for electricity and services goes up every year
    • Limited Cooling / Electrical Capacity
      • Inflexible Infrastructure
      • (Once a raised floor always a raised floor)
      • Constant Demand for Expansion
      • Expensive Retrofit for High Density Zone
  • Industry Direction Change
    • Modular/Containerized Data Centers
    • Benefits over Traditional Data Centers Include:
      • CAPEX savings of 35-50%
      • OPEX savings of 20-30%
      • Time to Deploy from years to 6-8 months
      • Negatives
      • Still has large price tag prior to operation
    • Micro-Modular Data Centers
    • Benefits over Container Data Centers Include:
      • CAPEX Additional savings of 40-50%
      • OPEX Additional savings of 30-35%
      • Significant Flexibility
      • Time to Deploy to 2 months
    Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com There is a shift occurring in today’s Data Center Design. Why are companies like IBM, Microsoft, Sun, HP and Google all entering the Modular/Containerized Data Center Market?
    • Manage power consumption, cooling delivery, and temperature set points at a rack level
    • Reduce your cooling and electrical costs by up to 50%
    • Reduce the costs to plan, build, and implement your new facility by up to 80%
    • Grow horizontally—from 1 to 100 units—without disrupting existing operations?
    • Can be installed or Re-Located anywhere with the only requirements being power and network connectivity
    • Provide a complete turnkey solution within weeks vs. years .
    What Pre-Engineered Modular Solutions Do For You
  • Elliptical products only need Power and Connectivity. This allows for endless placement choices.
  • The Solution is Clear MICRO MODULAR
    • Save Money
      • Eliminate costly infrastructure with a self-contained, high-density, cost-effective data center.
      • Reduce the costs to plan, build and implement your data center
      • Reduce overall operating expenses
    • Save Energy
      • Closed loop cooling dramatically cuts cooling and electrical costs
      • Significantly reduce data center’s harmful carbon footprint
    • Save Time
      • Micro-Modular Data Centers can be built, fully populated and delivered in weeks vs. months or years
      • Have a fully functional data center when, where and for however long you need it
    • Save Space
      • Reduce your data center footprint by up to 70 percent
      • EMS products can be located in a warehouse, garage, office or closet
    • THE RASER & C3-SPEAR KEY COMPONENTS
    • AND
    • AVAILABLE OPTIONS
    Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
  • R.A.S.E.R. - FEATURES
    • Micro Modular Design
    • 42U NEMA 4 Enclosure
    • Vendor Neutral 19” Form Factor
    • 42,000 BTU HVAC
    • On-Board Closed Loop Cooling
    • Hot & Cold Aisle Containment
    • Pre-engineered High Density
    • Rack Level CyberLock Security
    • Mobility
    • Easy Serviceability
    Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com DATA CENTER “IN A BOX”
  • RASER – On-Board Closed Loop Cooling The True Meaning of Built to Last: The A/C “Compressors have a mean time before failure rate of 52.0 years .” “ The A/C blower has a mean time before failure rate of 228.3 years .” -McLean Cooling Technologies CLOSED LOOP COOLING REDUCES POWER REQUIRED TO COOL EQUIPMENT BY 50%+ 12 KW Air-Cooled Cold Air Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com *Best Practice for Datacenter Efficiency -LBNL 2008 Equipment Equipment Equipment Equipment Equipment
  • RASER OVERVIEW 3 “2U” bays for Switches, KVM Infini band extender or communications router. 36U of high density blade ready space 42U Total 100% Self Contained 42,000 Btu A/C, Active Fire Suppression, Security and Protection built in .
  • Patch Panel Thermostat Self-Propelled Push Button Mobility & Cyber Lock Security C³-S.P.E.A.R. FEATURES Dual Power Input & Separate Input for A/C
  • C3-SPEAR – On-Board Closed Loop Cooling
    • Modular Design
    • 24U NEMA 12 or 4 Enclosure
    • Vendor Neutral 19” Form Factor
    • 8,000-20,000 BTU HVAC
    • On-Board Closed Loop Cooling
    • Hot & Cold Aisle Containment
    • Pre-engineered High Density
    • Mobility – Self Propelled Push Button Assist
  • Push Button Power Assist The drive system allows one person to move up to 1,500 pounds of electronics and cooling up a 6% grade.* 1. Pre-Load the rack in the warehouse. 2. Ship to Location for easy set up. 3. Park and Lock for instant & Secure IT Closet!
  • NEMA RATINGS
    • Type 4 - Enclosures constructed for either Indoor or Outdoor use.
    • To provide a degree of protection of the equipment inside
    • the enclosure against ingress of solid foreign objects (falling dirt and
    • windblown dust); To provide a degree of protection with respect to harmful
    • effects on the equipment due to the ingress of (water, rain, sleet, snow,
    • splashing water, and hose directed water); and that will be undamaged by
    • the external formation of ice on the enclosure.
    • (RASER, SPEAR AND UPGRADED C3-SPEAR)
    Type 12 - Enclosures constructed for Indoor use. To provide a degree of protection of the equipment inside the enclosure against ingress of solid foreign objects (falling dirt and circulating dust, lint, fibers, and flying); and to provide a degree of protection with respect to harmful effects on the equipment due to the ingress of water (dripping and light splashing). (Base C3-SPEAR)
  • AVAILABLE OPTIONS
  • Inside View
    • Firetrace Systems provide Cost-Effective, Stand-Alone, Automatic Fire Suppression Systems for Critical Equipment
    • Novaec 1230 is a dielectric substance which is harmless to electronic equipment even during operation.
    • Novaec 1230 is a totally “clean” (non toxic) agent which eliminates permitting issues and eliminates clean up.
    • SMTP remote monitoring available with smart PDU
    Active Fire Suppression System 3M™ Novec™ 1230 Fluid 150,000 units installed worldwide
  • Fire Proofing Insulation
    • Aerogel Insulation provides thermal protection from external or internal sources
    • Air Tight RASER and C3-SPEAR environments do not support combustion.
    • Self contained modules compartmentalize damage to Data Center environment.
    Fires in the data center typically initiate through electrical equipment or component failure…”- Lance Harry, business development manager for Fenwal Protection Systems
    • Fully Customizable Encrypted Security Access
      • Limitation by time or day (9am – 5pm)
      • Limitation by personnel (Network Equipment Only or Servers Only)
      • Monthly Expiration and Renewal
    • 4,000 user event auditable trail – Track who opens what and when.
    CyberLock Multi-tier Security System Integrated electronic security Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com Field Programmable
  • Remote Office ( Example Solution)
  • C3-SPEAR Solution Laptop Power Connectivity
  • 24U ROUTER 24U 23U SWITCH 23U 22U CISCO FIBER CHANNEL 22U 21U CISCO UCS BLADES 21U 20U CISCO UCS BLADES 20U 19U CISCO UCS BLADES 19U 18U CISCO UCS BLADES 18U 17U CISCO UCS BLADES 17U 16U NET APP STORAGE 16U 15U NET APP STORAGE 15U 14U NET APP STORAGE 14U 13U NET APP STORAGE 13U 12U NET APP STORAGE 12U 11U NET APP STORAGE 11U 10U NET APP STORAGE 10U 09U NET APP STORAGE 09U 08U NET APP STORAGE 08U 07U NET APP STORAGE 07U 06U NET APP STORAGE 06U 05U UPS 05U 04U UPS 04U 03U UPS 03U 02U UPS 02U 01U UPS 01U              
  • RASER Solution Laptop Power Connectivity
  • REMOTE OFFICE DEPLOYMENT
    • Next Steps:
    • Do you have a IT Solution in mind?
      • How much storage do you need?
      • What is the rack space requirement in U
      • What is the heat output of the equipment?
    • Do you have a location picked out?
      • Can you get power and connection and ventilation to this location?
    • What is your time line to complete this project?
      • When would you like to begin?
      • When would you like to complete the project?
    • Other requirements and consideration
  • WWW.ELLIPTICALMOBILESOLUTIONS.COM ELLIPTICAL MOBILE SOLUTIONS The Leader in Mobile Data Centers