Regional Land Use Planning Progress Update Tac 071907

1,152 views

Published on

Update of the Regional Land Use Planning process.

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,152
On SlideShare
0
From Embeds
0
Number of Embeds
91
Actions
Shares
0
Downloads
31
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Regional Land Use Planning Progress Update Tac 071907

  1. 1. Regional Land Use Planning Initiative Progress Update Technical Advisory Committee July 19, 2007
  2. 2. Summary of Project Preparation <ul><li>Develop Project Identity </li></ul><ul><li>Develop Project Action Strategy </li></ul><ul><ul><li>Discussed project purpose and work scope </li></ul></ul><ul><ul><li>Identified project deliverables </li></ul></ul><ul><ul><li>Discussed stakeholder outreach/engagement strategies </li></ul></ul><ul><ul><li>Discussed project marketing strategies </li></ul></ul><ul><li>Conduct Various Studies </li></ul><ul><li>Conduct preliminary research and data acquisition/development </li></ul><ul><li>Develop Committee Structure Proposal </li></ul>
  3. 3. Project Identity Development <ul><li>Project Name: Going Places: An Integrated Land Use Vision for the Miami Valley Region </li></ul><ul><li>Project Main Logo and Sub-logos </li></ul>
  4. 4. Project Purpose and Work scope <ul><li>Project Purpose </li></ul><ul><ul><li>Develop a shared land use vision for the future </li></ul></ul><ul><ul><li>Provide a resource to local jurisdictions for their land use plans </li></ul></ul><ul><li>Work scope </li></ul><ul><ul><li>Project Area: MVRPC MPO Planning Boundary </li></ul></ul><ul><ul><li>Project Timeline: July 2007 - June 2011 </li></ul></ul><ul><ul><li>Project Cost: $1 million </li></ul></ul>
  5. 5. Project Deliverables <ul><li>Every study conducted as part of the Regional Land Use Planning Initiative will have a separate study report. Examples include the Miami Valley Housing Assessment Study report and the Miami Valley Land Suitability Assessment – Natural Environmental Factors report </li></ul><ul><li>At the conclusion of each phase, an executive summary report highlighting findings from all the study reports will be assembled </li></ul><ul><li>All of the data generated as part of the study will be made available using: </li></ul><ul><ul><li>MVRPC Website </li></ul></ul><ul><ul><li>GIS Online Planning Support System </li></ul></ul>
  6. 6. Stakeholder Outreach/Engagement Strategies <ul><li>Make presentations to share the 4-year process with various organizations </li></ul><ul><ul><li>Government and Non-Government agencies </li></ul></ul><ul><li>Provide an E-Forum on the web site </li></ul><ul><li>Design and host stakeholder engagement workshops during Phases I and II </li></ul><ul><ul><li>Workshops will be topic-based and the preferred format is similar to the safety and open space workshops, where a formal presentation is given by staff and is followed by an interactive session </li></ul></ul><ul><li>Host public participation meetings during Phase II </li></ul><ul><li>Upon completion of each phase, staff will make presentations to various organizations and seek endorsements </li></ul><ul><li>Further stakeholder outreach/engagement strategies need to be developed </li></ul>
  7. 7. Sharing Planning Process <ul><li>Presentations on 4-year process outlined in the proposal were made to: </li></ul><ul><ul><li>Dayton Regional Network </li></ul></ul><ul><ul><li>Dayton Area Home Builders Association </li></ul></ul><ul><ul><li>Montgomery County Board of Commissioners </li></ul></ul><ul><ul><li>City of Xenia Planning and Zoning Commission </li></ul></ul><ul><ul><li>Greater Dayton Regional Transit Authority </li></ul></ul><ul><ul><li>City of Riverside City Council </li></ul></ul><ul><ul><li>Miami Conservancy District </li></ul></ul><ul><ul><li>City of Piqua Planning Commission </li></ul></ul><ul><ul><li>Village of Yellow Spring Planning Commission </li></ul></ul><ul><ul><li>City of Beavercreek Planning Commission </li></ul></ul><ul><ul><li>Dayton Daily News Editorial Board </li></ul></ul>
  8. 8. Sharing Planning Process <ul><li>Presentations are scheduled with following organizations </li></ul><ul><ul><li>City of West Carrollton Planning Commission </li></ul></ul><ul><ul><li>City of Oakwood Planning Commission and Council </li></ul></ul><ul><ul><li>Miami County Board of Commissioners </li></ul></ul><ul><ul><li>City of Dayton Plan Board </li></ul></ul><ul><ul><li>City of Tipp City Planning Commission </li></ul></ul><ul><ul><li>City of Miamisburg Planning Commission </li></ul></ul><ul><li>Staff will be contacting more organizations to continue this outreach efforts </li></ul>
  9. 9. Project Marketing Strategies <ul><li>Web site – Regional Land Use Planning web page under MVRPC web site </li></ul><ul><li>Project Business Card </li></ul><ul><li>Further Marketing Strategies need to be developed </li></ul>
  10. 10. Update on Various Studies <ul><li>Finalizing two studies under Phase I Existing Condition Assessment </li></ul><ul><ul><li>Miami Valley Housing Assessment Study </li></ul></ul><ul><ul><li>Miami Valley Land Suitability Assessment - Natural Environment Factors </li></ul></ul><ul><li>The final report will be made available on the website by end of July </li></ul><ul><li>Presentation will be made at the next August/September TAC/Board meeting </li></ul>
  11. 11. Preliminary Research and Database Development <ul><li>Conduct preliminary research for Phase I </li></ul><ul><ul><li>Commercial Market Assessment Study and Miami Valley Land Suitability Assessment – Built Environment Factors </li></ul></ul><ul><li>Conduct a local jurisdiction comprehensive planning survey </li></ul><ul><ul><li>Obtain the most current planning related documents and data to incorporate individual community’s recent efforts and vision </li></ul></ul><ul><ul><li>May 18 2007 – June 15, 2007 </li></ul></ul><ul><ul><li>75% response rate (62 out of 83 jurisdictions) </li></ul></ul><ul><li>Developing and/or acquiring various datasets including GIS data </li></ul><ul><ul><li>Acquired Water and Sewer GIS data Adopted Land Use maps and GIS data from local jurisdictions </li></ul></ul><ul><ul><li>In the process of developing regional dataset for water and sewer </li></ul></ul><ul><ul><li>In the process of updating MVRPC Adopted Land Use GIS dataset based on local jurisdictions data </li></ul></ul>
  12. 12. For More Information <ul><li>Visit MVRPC’s Regional Land Use Planning website at www.mvrpc.org/rlu/ </li></ul><ul><li>Contact </li></ul><ul><ul><li>Donald R. Spang, Executive Director, at dspang@mvrpc.org </li></ul></ul><ul><ul><li>Martin Kim, Director of Regional Planning, at mkim@mvrpc.org </li></ul></ul>

×