Your SlideShare is downloading. ×
Construction independant tied_scaffold
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Construction independant tied_scaffold

253

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
253
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. END OF SCAFFOLD Sole Plates Base Plates Standard Transom Ledger Ledger Brace Facade Brace Scaffolding Planks (Deck area min of 600 mm wide) Toe Board (Min 150 mm high) Intermediate guard rail (Max gap of 470 mm) Brick Guard Guard Rail (Approx 1.0 m high) Through Tie Reveal Tie Large Eye Bolt Eye Bolt and Strap Independent Tied Scaffold Couplers at joints

×