Krauck system englisch flyer

440 views

Published on

The Best projekt Managemnet Solution of BIG Construction Project .
We are stop Time and Costs Overrruns

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
440
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Krauck system englisch flyer

  1. 1. Flyer WELCOME TO CONFLICT-FREE ENGINEERING Transparency in the Interest of Builders and Investors General Contractor WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite 1
  2. 2. The Problem Skyrocketing costs for Skylink Elbphilharmonie, Hamburg Airport Berlin ThyssenKrupp-Brasilia 10,000 different plans! There is a lack of matching plans It lacks the overall organization for the planning The unsolved problem Construction cost and time overruns? WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 2 2
  3. 3. THE CENTRAL QUESTION: „Why do a lot of construction projects end up with cost explosions and time delays?“ WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 3 3
  4. 4. The Cause Despite the best planners, project managers, contractors and systems 1 - Architecture 21 - Facility-Management 20 – Renters‘ Fitout * 2 – Structural Work * 3 - Fitout * 19 – Building Site Facilities 4 - Frontage * 18 – Building Automation 5 – Structural Planning 17 - Conveyors* 6 - Formwork-/Reinforce-Planning 16 – Low Voltage Current * 7 - Slot-/Breakthrough-Planning 15 – High Voltage Current * 8 – Fire Prevention * 14 - Coldness * 9 – Outdoor Facilities * 13 - Ventilation* * Additionally 21 main trades above 50 sub-trades possible! 10 - Sanitary * 12 - Heating * WWW.KRAUCK-SYSTEMS.COM 11 – Fire-Extinguishing System* CONFLICT-FREE ENGINEERING Seite Page 4 4
  5. 5. The Solution KRAUCK-SYSTEMS takes responsibility of coordinated plans and leads all specialist planners like a navigation system through the project! 1 - Architecture 21 - Facility-Management 2 – Structural Work * 20 – Renters‘ Fitout * 3 - Fitout * 19 – Building Site Facilities 4 - Frontage * 18 – Building Automation 5 – Structural Planning 17 - Conveyors* 16 – Low Voltage Current * 6 - Formwork-/Reinforce-Planning Clearing by KRAUCK SYSTEMS 7 - Slot-/Breakthrough-Planning 15 – High Voltage Current * 8 – Fire Prevention * 14 - Coldness * 9 – Outdoor Facilities * 13 - Ventilation* • Additionally 21 main trades above 50 sub-trades possible! 10 - Sanitary * 12 - Heating * 11 – Fire-Extinguishing System* WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 5 5
  6. 6. The Invention Krauck Systems enables this by: Our in-house developed software and systems solutions for every phase of the project Our unique clearing and project coordination system KS-Systems modules for use in all project phases 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 KS-Real-Dos; Real-Data-Operating-System KS-Datawall KS-PCS; Projekt-Coordination-System KS-Building Owner-Advisor KS-Real-PM (Project-Management-Project-Controlling) KS-Legal Project-Management Claims-Management (Insurances, …) KS-Quality-Control KS-Marketing-Portal KS-Plant-Documentation KS-Logistic KS-Total-Planning KS-Construction Control KS-Production-Automization KS-Construction-Management-Prozess Optimizing KS-Real-FM; Facility Management, Virtually controlled property management and maintenance KS-Specialist City WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 6 6
  7. 7. KS-Datawall The central clearing house for data Contents - generated by all parties with mutual dependencies Basis for Planning, Construction Use and Management Planning(CAD) Set Target Simulation of Construction Building Owner ProjectControl Architect Specialist Planner Construction Company User/ Operator KS-Marketing Stock Data Sampling Construction Plans Pre-Production Facility Management Correspondence Safety Engineering Maintenance Protocols Contracts, etc. Building Automation Substantive Examination With KS Datawall WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Administration (e.g.. SAP) Geo-Information-Systems Virtual Factory Seite Page 7 7
  8. 8. KRAUCK-SYSTEMS Integration into the entire project KRAUCK-SYSTEMS – PHILOSOPHY OPTIMIZING OF BEGINNING Properly coordinated plans and marketing materials Proper tendering documents No resource requirements for disputes over incorrect uncoordinated plans Accelerated processes Result: No cost and time overruns Cheaper construction costs, because elimination of Claims Everyone benefits PLANNING PHASE CONSTRUCTION PHASE Design - Approval - Marketing – Implementation planning - Tender Advantages for the planning process Responsibility for correct contents and fulfillment of the tasks Responsibility for coordinated plans of all specialist fields KS-Project Coordination System KS-Logbook for transparent reporting of all incidents Assembly and precast plans OPERATION MAINTENANCE Facility -Management Benefits for the construction phase Benefits for the operation phase Provide timely with correct plans First correct plans with real data Accelerate all construction processes Reduction of maintenance costs Early precast production based on real data Reduce downtime by repairs Drastic reduction of resource requirements for claims Faster reconstruction during Stress-free construction progress operation Cheaper building costs Enormous increase in profits PLANNED = BUILT WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 8 8
  9. 9. KS-Datawall-Plan The central clearing house for data Original plans of all planners Analysis and set up with KS-coding Set up in the KS model 1:1 site model Automatic identification of problem areas (collisions and guardian) Send result of the problems to the planners WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 9 9
  10. 10. KS-Datawall-Document The central clearing house for data Integration of all text documents (Protocols, contracts, files / telephone notes, Beschreibugen, e-mails, letters, faxes, etc.) Protocol Analysis / evaluation of Statements and implications Text Analysis Analyze and evaluate the contents of statements about the knowledge of the contents from our KS-Model and its impact on all trades Document your findings Assignment of tasks and appointments Personalized ToDo lists Todo A Todo B Collection of tasks with deadlines to links of all associated documents Todo C Todo D Todo E E-Mail Guardian functions Findings from the KS-Model Guard functions controls the fulfillment of all requirements of the text documents in the plan documents Example: • Collisions • Compliance with required spacing (width, height) WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1010
  11. 11. Advantages by KRAUCK SYSTEMS Independence from project type: Structural and Civil Engineering Industrial-Plant Automotive Production Plant, etc. Flexibility in the selection of partners and we make sure that all required often hundreds of specialists are coordinated and all tasks to be fulfilled in a timely and correct way. WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1111
  12. 12. KS-Production Automization Especially the production and precast industry was upgraded with enormous cost with the latest computerized production machinery. The clear objective faster and cheaper pre-production with high accuracy Problem: • Late faulty un-coordinated data • Different data suppliers, CAD systems, formats, methods of operation • No reliable data for direct injection into the production machines • Stress in taking measurement on site and production until shortly before delivery and installation • Joint liability by measurements on site and unrecognized deficiencies of the plans By Krauck Systems, for the first time you have reliable plans for their preparation work and production machines. • Production on base of correct plans • No more measurements on site • Timely pre-production and logistics WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1212
  13. 13. KS-Site Management Obtain the current project data via the PCS About the KS-PCS the supervisor will directly be supplied with the actual and proofed plans in 2d and 3d during the construction progress  benefit • No tiresome search for right plans for all specialist fields for the respective construction progress • Complete visibility and no missing of components and other elements WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1313
  14. 14. KS-Site Management Obtain the current project data via the PCS Support the construction management for the process planning by simulation of real construction sequence! Avoiding surprises at the construction site! Saves time by eliminating the tedious and impossible plan checks on all trades Reduction of claims management Construction schedule as planned without the usual disabilities Complete visibility and control via the subcontractor WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1414
  15. 15. KS-References Worldwide unique References in Conflict-Free Engineering KRAUCK-SYSTEMS offers regardless of the type of project, the world's only solution, and an international reputation for Conflict-Free Engineering. Over 25 years experience Over 10 Mio. m² floor area WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1515
  16. 16. KS-References Extracts from some projects WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1616
  17. 17. KS-References Extracts from some projects WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1717
  18. 18. KS-References Extracts from some projects Opernturm Frankfurt WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1818
  19. 19. KS-References Extracts from some projects WEST GATE Center Craiova WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 1919
  20. 20. KS-References Extracts from some projects WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 2020
  21. 21. KS-References Extracts from some projects WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 2121
  22. 22. References Realisation by different companies on basis of the technologies of Krauck-Systems WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 2222
  23. 23. Transparency in the interest of Principals and Investors KRAUCK SYSTEMS World leading company in the holistic project management Thank you for your attention! WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Seite Page 2323

×