Your SlideShare is downloading. ×
Sims schedule completed
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Sims schedule completed

225
views

Published on

Published in: Entertainment & Humor

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
225
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. L3 CMP Games Design – Group 2SIMS Concept Schedule Monday Tuesday Wednesday Thursday Friday Saturday Sunday AM PM EVE AM PM E AM P EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE V M Ew/b LightBot HA4 – Tutorial 07 Task 130.01.12 (finish) LightBot Walkabout Tutorial 08 LightBot and (finish) Tutorial 08 choose (start) areas.w/b LightBot HA4 – Task 2 Tutorial 09 Foyer – Begin06.02.12 (start) Tutorial measuring HA4 – Task 1 Complete 09 and schedule (Finish) photography and start Study area, production Front log. Entrance HA4 – Task 1 Begin schedule.w/b HA4 – Task 2 Foyer and13.02.12 HA4 – Task 3 HA4 – study area – Scale template Task 2 HA4 – Task Measured footprints and Foyer and 3 diagrams check study area Build basic proportions. – shell for Update Measured both areas. production log. diagrams Update production log.w/b20.02.12H/Tw/b HA4 – Task 3 HA4 – Task 3 Foyer and study Additional27.02.12 area detail measuring and HA4 – HA4 – Task Task 3 3 added – diagrams. Additional Screenshots furniture, Update measuring of work to plants, production log. and date. Email mouldings etc. diagrams. home. Update
  • 2. production log.w/b HA4 – HA4 – DL Task 4 Task 4 0105.03.12 HA4 – Task HA4 – Task Final Evaluat Evaluat 3 3 checks and ion. ion. Foyer and Foyer and renders. Upload Upload study area Front Update produc produc surfaces Entrance production tion tion confirmed. models log and log to log to rendered blog. blog. Final checks and renders. Upload Update HA4 production log front and sheet to Moodle. Harry’s Sessions Self-Directed Other SessionsTask 1 - OutlineChoose and commit to model two areasProduce Schedule – include LightBot overrun and new Deadline.List any problems you might have that you need to take into account – Modeller skills, time management etc.Start production log.Task 2 - PlanShoot reference imagery and textures, make measurements and draw diagrams – Include this in your production log – either directly blogged or within a PowerPoint presentation / Worddocument.Schedule in review sessions.Task3 - RespondBuild the two objects in stages – be careful not to focus on just one or parts of one.Plan out the production carefully – break it up into chunks.Task 4 - ReviewWrite an evaluation of your project. Leave enough time for this before the deadline.You can’t fully evaluate the work until the project is finished and presented.
  • 3. L3 CMP Games Design – Group 2SIMS Concept Schedule Monday Tuesday Wednesday Thursday Friday Saturday Sunday AM PM EVE AM PM E AM P EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE V M Ew/b LightBot HA4 – Tutorial 07 Task 130.01.12 LightBot (finish) Walkabout Tutorial 08 LightBot and (finish) Tutorial 08 choose (start) areas.w/b LightBot LightBot Tutorial 09 Tutorial 0906.02.12 (start) (Finish) HA4 – Task 1 Complete Study area, schedule Front and start Entrance production HA4 – Task log. 1 Begin schedule.w/b13.02.12 HA4 – Task HA4 – Task HA4 – 2 Foyer – 3 Task 2 Begin Scale Foyer and measuring template study area and footprints – photography and check Measured proportions. diagrams Update production log.w/b20.02.12H/Tw/b27.02.12 HA4 – Task HA4 – Task HA4 – HA4 – Task 3 3 Task 3 3 Build basic Build basic Additional Screenshots shell for shell for measuring of work to both areas. both areas. and date. Email Update Update diagrams. home. production production Update log. log. production log.
  • 4. w/b DL 0105.03.12 Task 3 HA4 – Task Update Build basic 3 production shell for Foyer and log. both areas. study area Update detail production added – log. furniture, plants, mouldings etc.w/b HA4 – Task 3 Update Foyer and production log.12.03.12 HA4 – Task study area 3 detail added – Additional furniture, measuring plants, and mouldings etc. diagrams. Update production log.w/b HA4 – Task 3 Foyer and study19.03.12 area detail HA4 – Task HA4 – Task 3 4 added – Foyer and Begin furniture, student evaluation. plants, area Review mouldings etc. surfaces production confirmed. log. .w/b HA4 – HA4 – DL Task 4 Task 4 0226.03.12 HA4 – Task HA4 – Task Final Evaluat Evaluat 3 3 checks and ion. ion. Foyer and Foyer and renders. Upload Upload study area Front Update produc produc surfaces Entrance production tion tion confirmed. models log and log to log to rendered blog. blog. Final checks and renders. Upload Update HA4 production log front and sheet to Moodle. Harry’s Sessions Self-Directed
  • 5. Other Sessions

×