BCBSFL Donation to  Jacksonville University, Davis College of Business Design, Construction Admin., Project Manager, Finis...
Before Renovation Pictures
 
 
 
 
 
JEA 5 New Branch Customer Centers Design, Construction Admin., Project Manager, Finishes & Furniture Installation (Design ...
 
 
 
 
JEA Tower 19 Whole Floor Renovation   Design, Construction Admin., Project Manager, Finishes & Furniture Installation (Flo...
During Renovation Pictures
 
 
 
 
 
 
JEA  Project Floor  “Jungle”   Design, Project Manager, Finishes & Furniture Installation (Was a warehouse area before bui...
 
 
 
 
 
 
 
 
 
 
JEA Lobby & Conference Room Renovations   Design, Project Manager, Finishes & Furniture Installation
Before Renovation Pictures
 
 
 
 
 
 
 
 
JEA Springfield Waterworks Laboratory Furniture Installation   Design layout & Furniture acquisition & installation
 
 
 
 
 
 
JEA 1 st  Floor Lobby Renovation  & Silk plant installation   Design, Construction Admin. Project Manager, Finishes & Furn...
Before Renovation Pictures
 
 
Before Renovation Pictures
 
Before Renovation Pictures
 
Before Renovation Pictures
 
Before Renovation Pictures
 
Before Renovation Pictures
 
 
JEA  Work Station Installation Design layout, furniture acquisition & Installation
 
 
 
JEA Elevator Renovation (6 cabs)   Design, Construction Admin., Finishes & Lighting
Before Renovation Pictures
 
JEA Wire Truck Design   Designed rear of flat bed trucks for wire spools and needed supplies
 
 
Upcoming SlideShare
Loading in …5
×

Presentation1 Web

298 views
246 views

Published on

Project Portfolio

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
298
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Project was budgeted for $50,000. Came in under budget at 35,000.
  • Customer centers were budgeted 40,000 for Furniture installation, Project came in under budget from 21K to 30, dependent on site.
  • Project was budgeted for $250,000. Came in at $222, 000.
  • Tower 19 During Renovation
  • Tower 19 During Renovation
  • Budgeted $350,000. Project priced out at $280,000.
  • Jungle Room – Project Area
  • Jungle Room – Project Area
  • Jungle area Phase 2 - Corridors
  • Lobby budget 12 to 15K. Conference room budgets varied depending on number on floor and size, not all were renovated.
  • Tower 15 Before Renovation
  • Tower 12 Lobby after Renovation
  • Tower 2
  • 630000 furniture purchased.
  • 100,000 Budgeted for security and ascetic improvements. 91,000 utilized.
  • Total furniture provided $106,000.
  • Presentation1 Web

    1. 1. BCBSFL Donation to Jacksonville University, Davis College of Business Design, Construction Admin., Project Manager, Finishes & Furniture Installation (Design build from existing break room)
    2. 2. Before Renovation Pictures
    3. 8. JEA 5 New Branch Customer Centers Design, Construction Admin., Project Manager, Finishes & Furniture Installation (Design build from yellow box)
    4. 13. JEA Tower 19 Whole Floor Renovation Design, Construction Admin., Project Manager, Finishes & Furniture Installation (Floor was unused prior to build out)
    5. 14. During Renovation Pictures
    6. 21. JEA Project Floor “Jungle” Design, Project Manager, Finishes & Furniture Installation (Was a warehouse area before build out)
    7. 32. JEA Lobby & Conference Room Renovations Design, Project Manager, Finishes & Furniture Installation
    8. 33. Before Renovation Pictures
    9. 42. JEA Springfield Waterworks Laboratory Furniture Installation Design layout & Furniture acquisition & installation
    10. 49. JEA 1 st Floor Lobby Renovation & Silk plant installation Design, Construction Admin. Project Manager, Finishes & Furniture Installation
    11. 50. Before Renovation Pictures
    12. 53. Before Renovation Pictures
    13. 55. Before Renovation Pictures
    14. 57. Before Renovation Pictures
    15. 59. Before Renovation Pictures
    16. 61. Before Renovation Pictures
    17. 64. JEA Work Station Installation Design layout, furniture acquisition & Installation
    18. 68. JEA Elevator Renovation (6 cabs) Design, Construction Admin., Finishes & Lighting
    19. 69. Before Renovation Pictures
    20. 71. JEA Wire Truck Design Designed rear of flat bed trucks for wire spools and needed supplies

    ×