    Operation Mindshift Corenet 08 - Presentation Transcript

    1. CoreNet Global Summit #11 A Corporate Real Estate “mindshift”: The New Trust-Based Turnkey Approach to Building and Development Moderator: Rick Page, GVA Williams Speakers: Dean Strombom, Gensler Mark Iammarino, Turner Construction Rex Miller, mindshift
    2. A new way of thinking about an old problem.
    3. Acknowledgements/Credits is comprised of AIA, GSA, Gensler, KPMG, Metropolis Magazine, Turner Construction, Haworth, WP Moore, Acoustic Dimensions, Kyle Davy Consulting, Lucchesi Galati Architects, Transwestern, Cushman & Wakefield, Solidus, and Aardex. Our purpose is to shift the building culture toward greater collaboration and integration.
    4. Learning Objectives Explore and Explain: • Broken Buildings and Busted Budgets* - the industry today. • What is the mindshift? • 4 Principles. • 5 Keys to Alignment. *Barry LePatner
    5. Agile Race in an Institutional Buggy!
    6. Silos Adapted from: McDonough Holland & Allen PC Attorneys At Law
    7. “Buildings Leak at the Intersection of Contracts” Adapted from: Todd Zabelle, Strategic Project Solutions
    8. Hierarchal Delivery Model
    9. Fielding a New Team Every Project
    10. 80% of the Cost is Brought in Late Adapted from: McDonough Holland & Allen PC Attorneys At Law
    11. If Corollas were Design-Bid-Build? Design-Bid-Build… Integrated… It would cost: $44,000 It would cost: $16,000 and it would be • Late • Over budget • Value-engineered • Missing parts • and have No warranty
    12. Waste in the System Manufacturing Construction 57% 12%
    13. The Brutal Facts • $700 billion annual WASTE (BuildingsSmartAlliance) • 48% of GHG (Energy Info Admin Statistics and Pew Climate report) • 70% over budget and late • 10-12% Annual Cost Escalation (RS Means)
    14. Owners Demand Fundamental Change Construction Users Roundtable (CURT): “Address the perception of inadequate, poorly coordinated AE drawings and the resulting difficulties in the field. These problems are symptoms of larger industry issues.”
    15. Principle 1: Trust-Based Teams • Values • Capabilities • Play Book • Tools • Pre-Game • Measure • Improve
    16. Principle 2: Getting it Right at the Start “All the big mistakes are made in the first day.” — Paul Adams, AIA 1. The Team Aligns with the Business Plan 2. The Business Plan Drives Design 3. Design is an Early Collaborative Process 4. 80% of the Cost Lies with the Sub-trades
    17. Principle 3: Built-In Sustainability Sustainable projects at no premium using integration. • By Removing Some of the 57% Waste. • Through Good Design vs. a Check List • The 2030 Challenge demands a new approach. • Smart developers can gain a competitive advantage.
    18. Principle 4: True Improvement A common team, process plus relevant performance metrics allows continuous improvement.
    19. Alignment 1: Big BIM • Collaborative Design • Modeling is Different than Drawing • Subs Model Shop Drawings • Collision Detection • Target Costing • Full Project Simulation • Off-site Fabrication • Life Cycle testing • Built-in Sustainable
    20. Alignment 2: Toyota Style • Reduces cost by 30% • Client Defines Value • Involve Those Doing the Work • Identify Activities that Deliver Value • Identify and Measures Waste • Create a Process to Remove Waste • Continual Incremental Improvement • AIA IPD Guidelines • Lean Construction • Responsibility-based Project Delivery
    21. Alignment 3: Shared Risk/Reward • Project vs. Scope • Joint Incentive and Risk • AIA’s Integrated Project Delivery Guidelines • Egan Report • Project Alliance Guide • Sutter Health Multi-Party Agreement • Profitable Partnering
    22. Alignment 4: Off-Site Fabrication • Structure • Interior Walls • Access Floors • Mechanical • Electrical • Plumbing • Concrete • Millwork • Bathrooms
    23. Alignment 5: Performance Impact
    24. Camino Royale Results:  Multi-Party Agreement $94M budget $9M Saved  Early Business Model 6 Months Reduced 6 MEP RFIs  Little BIM 37% of Contingency  IPD/Lean • Off-Site Assembly • Workplace Improvement • Sustainability
    25. Aardex Signature Center Results: $20.5 million/$3 per sqft  Vertical less than conventional Integration 191,000 square feet  Early Business LEED Platinum Model User Effective • Little BIM 50% Lower Operations 100% Leased • IPD/Lean  Assembly  Business Enhancement  Sustainability
    26. A Prescription for Success
    27. The Mindshift Cure MindshiftWiki Resource Site Mindshift Project Assessment Mindshift Project Delivery Mindshift Consulting and Coaching
    28. The Mindshift Cure Stay Tuned for the Book The Commercial Real Estate Revolution Release August 2009 through John P. Wiley Publishing
    29. Call to Action (1) • Select teams early based on qualifications • Prepare to shift $ forward to develop business case, validation and design • 80% of the errors are made in the early stage of design • Set up tightly coordinated design through collaboration and/or BIM • The business case drives design
    30. Call to Action (2) • Be aware of the extend of waste, develop a plan to identify and eliminate • Rehearses common avoidable conflicts and errors • Pool risk and reward to incentivize project results instead of scope results • Measure performance based on commitments to costs, quality and schedule weekly • Actively improve upon the metrics developed
    31. Contact Information Rex Miller, Thought Leader rex@rexmiller.net Dean Strombom, Principal dean_strombom@gensler.com Mark Iammarino, VP/GM miammarino@tcco.com Website: www.mindshiftblog.com Resource Site: www.mindshiftwiki.com

    + rex millerrex miller, 2 years ago

    custom

    1390 views, 3 favs, 5 embeds more stats

    How trust-based teams using turnkey integrated desi more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 1390
      • 1311 on SlideShare
      • 79 from embeds
    • Comments 0
    • Favorites 3
    • Downloads 72
    Most viewed embeds
    • 44 views on http://mindshiftinnovation.blogspot.com
    • 19 views on http://omswiki.pbwiki.com
    • 14 views on http://omswiki.pbworks.com
    • 1 views on https://omswiki.pbwiki.com
    • 1 views on http://www.mindshiftinnovation.blogspot.com

    more

    All embeds
    • 44 views on http://mindshiftinnovation.blogspot.com
    • 19 views on http://omswiki.pbwiki.com
    • 14 views on http://omswiki.pbworks.com
    • 1 views on https://omswiki.pbwiki.com
    • 1 views on http://www.mindshiftinnovation.blogspot.com

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories