0
Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013Cent...
Breaking Down Existing ItemsTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centric...
Cleaning Up for DemolitionTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricde...
Temporary Mailbox WallTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesign...
Temporary Mail Box LocationTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricd...
Demolition - Breaking Through Cafe Wall - 1TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudi...
Demolition - Breaking Through Cafe Wall - 2TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudi...
Demolition - Partition RemovalTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centr...
Demolition In Full SwingTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesi...
Demolition - Removal of Existing Walls CompleteTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignS...
Opening Up The 1st Floor - 1TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centric...
Opening Up The 1st Floor - 2TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centric...
Opening Up The 1st Floor - 3TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centric...
Future Co-Working Space LocationTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.cen...
Floor Saw Cuts for Electrical - 1TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.ce...
Floor Saw Cuts for Electrical - 2TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.ce...
Future Co-working Community Kitchen AreaTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio |...
Construction - Wall Framing BeginsTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.c...
Director’s Office & TechTown Conf. Rm.TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | w...
More Stud WallsTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio....
Stud Walls Go Up for Event SpaceTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.cen...
Wall Framing + Mechanical DuctworkTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.c...
Stud Walls for Conf. Rooms 3 - 4TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.cen...
Stud Walls Along CorridorTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdes...
More Construction Progress Photos Will Be Posted Next MonthTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013Ce...
Upcoming SlideShare
Loading in...5
×

Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

198

Published on

Photos of this SlideShare are of the 1st Floor Renovation Project my firm designed for TechTown –Detroit. TechTown is a small business incubator and resource hub for start up, small and medium size businesses. TechTown will unveil this premier Co-Working Office Space in the fall of 2013. The photos posted are tracking the construction progress. Come back next month and see how far along we are. Thanks for viewing.

Published in: Design, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
198
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31"

  1. 1. Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  2. 2. Breaking Down Existing ItemsTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  3. 3. Cleaning Up for DemolitionTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  4. 4. Temporary Mailbox WallTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  5. 5. Temporary Mail Box LocationTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  6. 6. Demolition - Breaking Through Cafe Wall - 1TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  7. 7. Demolition - Breaking Through Cafe Wall - 2TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  8. 8. Demolition - Partition RemovalTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  9. 9. Demolition In Full SwingTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  10. 10. Demolition - Removal of Existing Walls CompleteTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  11. 11. Opening Up The 1st Floor - 1TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  12. 12. Opening Up The 1st Floor - 2TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  13. 13. Opening Up The 1st Floor - 3TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  14. 14. Future Co-Working Space LocationTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  15. 15. Floor Saw Cuts for Electrical - 1TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  16. 16. Floor Saw Cuts for Electrical - 2TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  17. 17. Future Co-working Community Kitchen AreaTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  18. 18. Construction - Wall Framing BeginsTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  19. 19. Director’s Office & TechTown Conf. Rm.TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  20. 20. More Stud WallsTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  21. 21. Stud Walls Go Up for Event SpaceTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  22. 22. Wall Framing + Mechanical DuctworkTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  23. 23. Stud Walls for Conf. Rooms 3 - 4TechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  24. 24. Stud Walls Along CorridorTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  25. 25. More Construction Progress Photos Will Be Posted Next MonthTechTown 1st Floor RenovationMay 1 - May 31 Construction 2013CentricdesignStudio | www.centricdesignstudio.com
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×