0
Slide Show of Construction Progress at TechTown - Detroit
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013...
Rear Accent Wall At Conference Room 4
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio...
Painted Entry Wall At Conference Room 4
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStud...
Ceiling Cloud Framing At Future Copy Center
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centricdesign...
Ceiling Cloud Grid + Lighting At Conference Room 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centri...
Exterior View Of Conference Room 2 Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centricdesign...
Retrofitting Of Existing Light Fixtures (Recycling)
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centr...
Installation Of Retrofitted Light Fixtures (Reuse)
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centri...
Aluminum Storefront System Ready For Installation
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centric...
Storefront System Installed At Future Video Conf. Room
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Ce...
Storefront System Installed At Conf. Rooms 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centricd...
Storefront Glazing Ready For Installation
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignSt...
Storefront Glazing Installed At Conf. Rooms 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centric...
Storefront Glazing Installed Inside Conf. Room 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centricd...
Construction Progress At Corridor 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio |...
Ceiling + Lighting Installation At Future Video Conf. Room
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 201...
Construction Progress At Event Spaces 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centricdesign...
Construction Progress At Event Spaces 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centricdesign...
Wall Panel Finish Mock-Up Outside Of Event + Conf. Room Area
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2...
Co-Working Kitchen Construction Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStu...
Co-Working Kitchen Construction Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStu...
Co-Working Kitchen Construction Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStu...
Construction Progress At TechTown Management Suite
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centri...
Construction Progress At TechTown Management Suite
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
Centri...
More Construction Progress Photos Will Be Posted Next Month
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 20...
Upcoming SlideShare
Loading in...5
×

Construction Progress for TechTown 1st Floor Renovation | Aug 1 - Aug 31

209

Published on

Please check out the latest slideshare of the 1st floor renovation project at TechTown - Detroit. This slideshare marks month no. 4 of the construction progress on this project designed by Centric Design Studio. You can view the previous three slide share months of progress (starting in May 2013) to see how far we have come. Come back next month and see the progress. Thanks for viewing.

Published in: Business, Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
209
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Construction Progress for TechTown 1st Floor Renovation | Aug 1 - Aug 31"

  1. 1. Slide Show of Construction Progress at TechTown - Detroit TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  2. 2. Rear Accent Wall At Conference Room 4 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  3. 3. Painted Entry Wall At Conference Room 4 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  4. 4. Ceiling Cloud Framing At Future Copy Center TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com Ceiling Cloud Framing At Future Copy Center
  5. 5. Ceiling Cloud Grid + Lighting At Conference Room 2 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  6. 6. Exterior View Of Conference Room 2 Progress TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  7. 7. Retrofitting Of Existing Light Fixtures (Recycling) TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  8. 8. Installation Of Retrofitted Light Fixtures (Reuse) TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  9. 9. Aluminum Storefront System Ready For Installation TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  10. 10. Storefront System Installed At Future Video Conf. Room TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  11. 11. Storefront System Installed At Conf. Rooms 1 + 2 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  12. 12. Storefront Glazing Ready For Installation TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  13. 13. Storefront Glazing Installed At Conf. Rooms 1 + 2 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  14. 14. Storefront Glazing Installed Inside Conf. Room 2 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  15. 15. Construction Progress At Corridor 2 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  16. 16. Ceiling + Lighting Installation At Future Video Conf. Room TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  17. 17. Construction Progress At Event Spaces 1 + 2 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com Construction Progress At Event Spaces 1 + 2
  18. 18. Construction Progress At Event Spaces 1 + 2 TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com Construction Progress At Event Spaces 1 + 2
  19. 19. Wall Panel Finish Mock-Up Outside Of Event + Conf. Room Area TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  20. 20. Co-Working Kitchen Construction Progress TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  21. 21. Co-Working Kitchen Construction Progress TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  22. 22. Co-Working Kitchen Construction Progress TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  23. 23. Construction Progress At TechTown Management Suite TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  24. 24. Construction Progress At TechTown Management Suite TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  25. 25. More Construction Progress Photos Will Be Posted Next Month TechTown 1st Floor Renovation Aug. 1 - Aug. 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×