• Save
09 Oxxigeno SFIC 2009
Upcoming SlideShare
Loading in...5
×
 

09 Oxxigeno SFIC 2009

on

  • 337 views

Presentación de Oxxigeno en el SFIC 2009

Presentación de Oxxigeno en el SFIC 2009

Statistics

Views

Total Views
337
Views on SlideShare
337
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

09 Oxxigeno SFIC 2009 09 Oxxigeno SFIC 2009 Presentation Transcript

  • Adoption of CMMI by Oxxigeno 22 nd of September
  • Index About Oxxigeno Introduction Objectives Why did we choose CMMI? WorkPlan Questions i
  • Index About Oxxigeno Introduction Objectives Why did we choose CMMI? WorkPlan Questions i
  • Our company
    • Oxxigeno is a technological boutique specialized in project development and integral management : from its technological and strategic conceptualization to maintenance and support
    Our areas are: Design Technology Consultancy
  • Our Services Design Technology Consultancy
    • Visual Design
    • Interaction Design
    • Technological Consultancy
    • Application Development and Maintenance
    • Technological and systems architecture
    • Business Intelligence
    • Strategic consultancy
  • Technology Application Development and Maintenance
    • In Oxxigeno, we understand application development as an evolutive process, so we work in analysis, design, development and corrective and evolutive maintenance.
    • Our development team creates solutions for electronic commerce, management or industrial applications, all of them based on the latest generation technology.
    • Java, .NET, PHP
    • MySQL, SQL Server, Postgres, Oracle (OPN Member)‏
    • XHTML, Javascript, CSS, Flash, ActionScript
  • Our clients Tourism NH Hoteles, Iberostar, Rumbo Banking BBVA, Banco Popular, Groupe Berri Health Capio Sanidad, Nycomed, Adeslas Management and organizations ICM, APD, Cedro Distribution Roberto Verino, Casbega Coca-Cola, Lo Mónaco, Venca, Shiito.com Other areas SAC-Iberdrola, Sidsa
  • Our Team
    • We are a team of people focused on providing a high-quality level to our projects
      • An involved multidisciplinary team
        • Several specialized profiles
        • Cross-team skill
        • Clearly defined teams, low turnover
      • High Quality
        • Previous experience in product development
        • Without outsourcing: creative work environment
        • High technological experience: Official certificates Java y .NET
      • Passion and commitment
        • Focus on detail
  • Index About Oxxigeno Introduction Objectives Why did we choose CMMI? WorkPlan Questions i
  • Introduction: Needs
      • Enhance the success in our projects
      • Keep our customer fidelity
      • Improve our methodology
      • Define our processes with the guarantee of one recognized agency or institution
  • Introduction: Needs
    • INCREASING AND STRENGTHENING OUR QUALITY WORKING IN A CONTINUOUS IMPROVEMENT ENVIRONMENT
  • Index About Oxxigeno Introduction Objectives Why did we choose CMMI? WorkPlan Questions i
  • Objectives
      • Achieve a low-cost development process
      • Use a common development methodology including the use of common tools
      • Develop with high-quality vision
      • Improve our customer fidelity
      • Increase the efficiency
  • Index About Oxxigeno Introduction Objectives Why did we choose CMMI? WorkPlan Questions i
  • Why did we choose CMMI?
      • Quality and continuous improvement model
      • Created and maintained by SEI (Software Engineering Institute)‏
      • CMMI is being adopted worldwide
      • With Plan Avanza benefits
  • Index About Oxxigeno Introduction Objectives Why did we choose CMMI? WorkPlan Questions i
  • Initial appraisal Improvement Project Plan Process development WorkPlan Process implementation SCAMPI B Resolution of detected noncompliances SCAMPI A C O N S U L T A N C Y
  • Implementation: Keys to Success (I)‏
      • Strong Management Support
      • Involvement of all Oxxigeno members
      • Planning and risk analysis of the improvement project
      • Good attitude for change
      • Implementation of a common methodology based on the processes already in use
  • Implementation: Keys to Success (II)‏
      • Quality Orientation
      • High motivation to improve
      • Adaptation of tools known by our team to reach the objectives of each process area
      • Previous Experience: ITIL Institucionalization in Oxxigeno
      • Strategic project
  • References
      • http :// www.oxxigeno.com /
      • http :// www.oxxigeno.com / blog /
      • http :// www.sei.cmu.edu /
      • http :// www.sei.cmu.edu / cmmi /
      • http :// www.calidaddelsoftware.com /
  • Index About Oxxigeno Introduction Objectives Why did we choose CMMI? WorkPlan Questions i
  • i Thanks, let´s talk? Oxxigeno España C/Luchana, 23. 28010 – Madrid Phone: +34 91 144 12 00 Fax: +34 91 144 12 01 Email: [email_address] www.oxxigeno.com