• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Avance Marzo 2007
 

Avance Marzo 2007

on

  • 596 views

Avance Marzo 2007

Avance Marzo 2007
Ing. Mario Pavón Lemarroy
9221157464

Statistics

Views

Total Views
596
Views on SlideShare
596
Embed Views
0

Actions

Likes
0
Downloads
13
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Avance Marzo 2007 Avance Marzo 2007 Presentation Transcript

    • Dirección Corporativa de Ingeniería y Desarrollo de Proyectos Reconfiguración de la Refinería “Gral. Lázaro Cárdenas” Minatitlán, Veracruz Minatitlán, Ver. Minatitlá abril 2007
    • Programa de Ejecución del Proyecto Ejecución 2
    • Avance del Proyecto de Reconfiguración (marzo 07) (incluye desfogues, oleoducto y gasoducto) 100% contractual recuperacion real financiero real fisico 90% contractual 83.9% 80% 76.7% recuperación 70% 63.2% real fisico 60% avance 53.8% real financiero 50% 40% 30% 20% 10% 0% di 4 di 5 di 7 di 6 fe 3 fe 4 fe 5 fe 6 fe 7 ab 4 ag 04 ab 5 ag 5 ab 6 ag 06 ab 7 ag 07 ab 8 oc 4 oc 5 oc 6 oc 7 ju 4 ju 5 ju 6 ju 7 08 t -0 t -0 t -0 t -0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c- c- c- c- c- b- n- b- n- b- n- b- n- b- o- o- o- o- r- r- r- r- r- di 3
    • Avance del Proyecto de Reconfiguración (marzo 07) Monto % Avance Marzo 2007 Inicio de Operación Operació No. Descripción Descripció Contrato Real Real Reprogram. Pronóstico Pronó IPC Contrato Reprog. Contrato mmusd Financiero Físico Contratista DCIDP Acondicionamiento 1 Sitio y Camino de 41.9 100.0 100.0 100.0 100.0 Oct 05 Sep 05 Acceso (Real) Servicios Auxiliares 95.2 95.2 79.4 80.2 May 07 Dic 07 Dic 07 Aguas Amargas 94.4 94.4 75.7 76.1 May 07 Ene 08 Ene 08 2 Integración Integració 680.5 Abr 08 Abr 08 Jul 08 83.1 83.1 67.7 71.6 Total 86.0 86.0 71.8 73.4 Combinada Maya 94.4 84.3 46.7 67.3 Sep 07 Mar 08 May 08 Catalítica FCC-II Catalí FCC- 93.0 81.0 44.1 63.0 Nov 07 Mar 08 Jun 08 3 HDS Diesel 534.0 Nov 07 Abr 08 Abr 08 85.7 85.7 39.2 60.8 Total 91.7 83.6 43.9 64.2 HDS Gasóleos Gasó 74.7 55.3 33.1 43.5 Ene 08 Abr 08 Oct 08 Hidrógeno Hidró 84.9 73.4 49.7 55.7 Ago 07 Mar 08 Mar 08 4 Azufre 317.0 May 07 Mar 08 May 08 90.7 75.9 36.6 47.6 Total 81.8 65.3 37.4 47.3 Regeneradora Amina 66.2 55.7 35.2 44.9 Feb 08 Mar 08 Mar 08 Coquizadora 78.0 58.5 36.1 46.9 Feb 08 Mar 08 Oct 08 5 317.9 HDS Naftas Coquiz. Coquiz. 85.2 80.1 37.7 48.1 May 07 Abr 08 Abr 08 Total 78.7 62.5 36.3 47.0 Alquilación U-18000 Alquilació U- 77.3 77.3 82.2 86.1 Nov 07 Oct 07 Oct 07 6 Alquilación U-19000 Alquilació U- 154.0 82.1 82.1 83.2 85.5 Nov 07 Oct 07 Oct 07 Total 79.4 79.4 82.7 85.7 Obras Adicionales 54.4 - 16.6 24.8 28.0 Oct-07 Oct- Oct 07 (Desfogues / Ductos) Proyecto Integral 2,098.0 85.6 76.7 53.8 63.2 4
    • Diagrama de Terminación de las Plantas 2007 2008 ABR MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT Gasolina Alquilación Alquilació Alquilado alto Isobutano 1 octano Alquilación Alquilació Propano/propileno Esferas de 2 Propano Olefinas Propileno Gasolina Catalítica Catalí Catalítica Catalí Gas combustible Pool de Gasolinas Gasóleo Gasóleos ligero Crudo Nafta Turbosina y Kerosina Amargas Plantas Combinada Combinada Maya Existentes Gasóleo de vacío Diesel Aceite Cíclico Amargo Ligero Diesel (HDS) Gasóleo Tanques HDS diesel ligero existentes H2 de Diesel Prepara- H2S dora de Gasóleo de vacío HDS HDS Naftas carga (existente) Residuo de vacío H2 H2S gasóleos gasó gasóleos gasó Gas combustible Gasóleo pesado Gas Natural Hidró geno Hidró Hidró Hidrógeno Gas Residual H2S Manejo de Azufre Azufre Azufre H2S Coquiza- Coquiza- Coquiza- Coquiza- Manejo de coque Manejo de Gas ácido H2S dora dora coque amoniacal Gas combustible Aguas Aguas DEA Amargas Rica Plantas Amargas Nuevas DEA Naftas Pobre Regene. Regene. de DEA Tanque Nafta H2 HDS Naftas Pentanos/ Hexanos Servicios Auxiliares 5 IPC-2 IPC-3 IPC-4 IPC-5 IPC-6 Parte derecha del cuadro indica cuando concluye la planta.
    • Proyección Ejecución 4 meses Proyección Ejecución 6
    • PROYECCION EJECUCION 4 MESES (IPC 2) mmusd abril-07 mayo-07 junio-07 julio-07 programa proyección programa proyección programa proyección programa proyección SERVICIOS AUXILIARES 0.1 3.2 0.1 3.1 0.0 2.3 0.0 2.1 AGUAS AMARGAS 0.0 0.7 0.0 0.8 0.0 0.9 0.0 0.8 INTEGRACION 21.5 25.3 26.7 23.0 27.1 26.6 28.7 26.2 TOTAL IPC 2 21.6 29.1 26.8 26.9 27.1 29.8 28.7 29.0 Actividades relevantes: Prefabricación de tuberías de Servicios Auxiliares 100% Terminación de montaje de equipos en Servicios Auxiliares y Aguas Amargas Terminación de subestaciones principales de toda la reconfiguración incluyendo alimentadores Finalización de pruebas hidrostáticas de tanques de almacenamiento y equipos de S. Auxiliares y A. Amargas. 7
    • IPC 2 Avance Real Certificado al 31 de Marzo 2007 100 Reprogramado 2 90 80 74.4% 70 Avance % 60 Reprogramado 3 50 Real Físico 62.6% (No certificado) 40 Reprogramado 2 30 Reprogramado 3 20 Real Financiero Real Financiero 60.9% 10 0 Oct- Nov- Dic- Ene- Feb- Mar- Abr- May- Jun- Jul- Ago- Sep- Oct- Nov- Dic- Ene- Feb- Mar- Abr- May- Jun- Jul- Ago- Sep- Oct- Nov- Dic- Ene- Feb- Mar- Abr- May- Jun- Jul- Ago- Sep- Oct- Nov- Dic- Ene- Feb- Mar- Abr- 04 04 04 05 05 05 05 05 05 05 05 05 05 05 05 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 08 08 08 08 Reprogramado 2 0.1 0.5 0.8 1.2 1.6 2.1 2.8 3.5 4.3 5 5.9 7.5 9.5 11.6 14.8 18.5 22.2 29.5 36.4 44.7 50.7 57.3 62.3 66.9 70.3 73.7 76.7 80.1 82.9 85.8 87.8 89.5 90.8 91.1 91.2 91.4 92.1 92.3 92.4 92.9 94.7 97.6 100. Reprogramado 3 0.04 0.42 0.65 0.97 1.29 1.76 2.31 2.97 3.84 4.79 6.02 7.56 9.65 11.7 14 16.6 19.3 25.2 29.7 35.5 39.8 45.1 48.2 51.4 53.7 56.1 58 60.4 63.3 66.5 69.2 72.7 76.3 79.8 83.1 86.2 89.6 92.6 95 96.9 98.1 99.1 100 Real Financiero 0.35 0.44 0.75 1.15 1.66 2.61 3.43 4.06 5.05 6.08 8.05 10.1 12.1 14 17.1 19.5 22.3 25.8 28.6 31.8 34.7 38.3 41 44.1 47.1 49.6 51.8 55 57.6 61 64.0 67.3 70.9 74.4 8
    • PROYECCION EJECUCION 4 MESES (IPC 3) mmusd abril-07 mayo-07 junio-07 julio-07 programa proyección programa proyección programa proyección programa proyección COMBINADA 100% MAYA 3.8 6.4 4.0 7.5 7.3 19.7 7.8 9.4 CATALITICA FCC-II 6.2 7.2 8.6 6.2 4.1 15.3 3.4 11.2 HDS DIESEL PROFUNDO 5.0 4.3 2.3 7.9 3.0 6.1 1.2 6.4 TOTAL IPC 3 15.1 17.9 14.9 21.6 14.4 41.0 12.4 27.1 Actividades relevantes: Llegada a sitio de los materiales habilitados para el montaje de las torres atmosférica, de agotadores y parcialmente la de vacío en Combinada. Montaje del splitter, torres debutanizadora, depropanizadora y absorbedores de Catalítica. Montaje de los reactores, calentadores, tanques y aeroenfriadores de HDS Diesel 9
    • IPC 3 Avance Real Certificado al 31 de(porcentajes acumulados) CURVA GENERAL DEL PROYECTO Marzo 2007 100% 90% CONTRACTUAL PROGRAMA DE 80% RECUPERACION RECUPERACIÓN 83.6% REAL FISICO 64.3% AVANCE REAL FINANCIERO 70% AVANCE REAL FISICO 60% 64.0% 50% 40% 30% 20% 10% REAL FINANC. 43.9% 0% No Ma No Ma No Ma No Dic- Ene- Feb- Mar- Abr- Jun- Jul- Ago- Sep- Oct- Dic- Ene- Feb- Mar- Abr- Jun- Jul- Ago- Sep- Oct- Dic- Ene- Feb- Mar- Abr- Jun- Jul- Ago- Sep- Oct- v- y- v- y- v- y- v- 04 05 05 05 05 05 05 05 05 05 05 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 04 05 05 06 06 07 07 CONTRACTUAL 0.12 0.18 0.36 1.38 2.84 4.55 6.78 8.78 12.0 13.7 15.1 17.4 19.4 21.9 26.6 32.6 36.8 43.1 47.9 52.9 59.3 65.9 71.0 76.2 81.0 84.7 88.2 90.0 91.7 93.0 93.8 94.7 95.3 95.7 96.1 97.6 100. RECUPERACION 0.00 0.00 0.00 0.27 0.31 0.52 1.27 2.25 2.96 3.25 4.01 4.60 5.51 7.44 9.65 11.4 14.3 16.5 19.6 22.4 26.8 32.2 38.4 45.7 56.2 65.2 74.8 80.0 83.6 86.4 89.2 91.9 94.4 95.1 95.8 97.6 100. AVANCE REAL FINANCIERO 0.00 0.00 0.00 0.33 0.38 0.59 1.57 2.66 3.50 3.99 4.71 5.06 6.80 7.22 8.36 10.2 12.3 13.9 15.6 19.2 21.7 23.8 27.3 30.6 33.2 37.3 39.1 41.7 43.9 47.2 51.3 58.9 63.9 AVANCE REAL FISICO 0.00 0.00 0.02 0.04 0.06 0.09 1.20 1.50 1.90 2.20 2.60 6.70 7.80 9.60 12.0 14.6 19.9 24.9 29.1 31.7 36.7 42.5 48.5 54.7 57.1 59.0 61.0 61.3 64.3 10
    • PROYECCION EJECUCION 4 MESES (IPC 4) mmusd abril-07 mayo-07 junio-07 julio-07 programa proyección programa proyección programa proyección programa proyección HDS GASOLEOS 9.4 6.1 3.2 8.7 8.1 9.3 8.4 10.0 HIDROGENO 6.2 1.8 1.4 2.8 1.1 3.0 0.9 3.4 AZUFRE 5.0 3.6 3.6 6.7 3.2 6.1 0.7 5.8 TOTAL IPC 4 20.6 11.5 8.2 18.2 12.4 18.3 10.0 19.1 Actividades relevantes: En mayo 07 se termina la Ingeniería de la disciplina Civil y en julio la de Tuberías para las tres unidades, así como la culminación del Modelo Electrónico al 90% (METI “C”). Los Compresores de proceso de las plantas HDS de Gasóleos e Hidrógeno se encuentran en la Aduana Portuaria de Coatzacoalcos y se trasladarán al Sitio en mayo 07. La fabricación de los Reactores (R-11001/2) de la planta HDS de Gasóleos se termina en mayo 07, se embarcan en junio 07 y llegan a Sitio en julio 07 con un peso de 1200 y 300 ton. Para la planta HDS de Gasóleos en mayo 07 se embarcan la Adsorvedora de Amina (V- 11051), la Fraccionadora de Gasóleos (V-11052) y la Regeneradora de Amina (V-11055) con un peso de 290 ton., 201 ton. y 149 ton. respectivamente. El Paquete de Purificación de la planta de Hidrógeno (PSA) llega a Sitio en mayo 07. En mayo 07 para la planta de Azufre llega a Sitio el paquete LURGI LTGT que consiste en 4 torres y 2 columnas. 11
    • IPC 4 Avance Real Certificado al 31 de Marzo 2007 100 C ON T R A C T UA L 90 SEGUIM IEN T O R EA L 80 A VA N C E F Í S IC O 70 PROGRAMA DE RECUPERACION: 65.29% 60 58.7% % 50 40 AVANCE FÍSICO REAL FINANCIERO (no certificado) 30 37.53% 47.28 % 20 10 0 Feb- M ar - A br - M ay- Jun- Jul - A go- Sep- Oct - Nov- Di c- E ne- Feb- M ar - A br - M ay- Jun- Jul - A go- Sep- Oct - Nov- Di c- E ne- Feb- M ar - A br - M ay- Jun- Jul - A go- Sep- Oct - Nov- Di c- E ne- Feb- M ar - A br - 05 05 05 05 05 05 05 05 05 05 05 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 08 08 08 08 Feb- M a r - A br - M ay- Jun- J ul - A go- Se p - Oct- N ov- Di c- E ne- Feb- M a r - A br - M ay- J un- Jul - A go- Se p - Oct- N ov - Di c- E ne- Fe b- M ar - A br - M ay- Jun- J ul - A go- Se p- Oct - N ov- Dic- E ne- Feb- M a r - A br - 05 05 05 05 05 05 05 05 05 05 05 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 08 08 08 08 CON T RA CT U AL 0. 011 0. 234 0. 285 0. 412 1 1. 914 3. 829 5. 184 8. 255 10. 3 13. 29 15. 82 19. 03 23. 13 26. 85 30. 99 35. 18 39. 09 43. 79 48. 34 53. 41 60. 01 67. 45 72. 94 78. 56 81. 79 84. 23 88. 96 90. 37 91. 27 95. 44 95. 77 95. 87 98. 41 99. 6 100 SE G U I M I E N T O 0 0. 165 0. 256 0. 362 0. 378 0. 415 0. 875 1. 078 1. 361 2. 761 3. 846 5. 32 5. 94 7. 885 9. 094 10. 12 11. 37 14. 05 18. 31 22. 2 27. 88 33. 31 39. 29 47. 16 54. 36 65. 29 70. 43 75. 65 79. 68 82. 91 87. 77 91. 46 92. 53 94. 34 95. 57 95. 86 96. 06 99. 12 100 REAL 0 0. 165 0. 256 0. 362 0. 378 0. 415 0. 875 1. 078 1. 361 2. 761 3. 846 5. 32 5. 94 7. 885 9. 094 10. 12 11. 73 13. 81 17. 05 19. 44 21. 15 23. 13 23. 63 29. 57 34. 15 37. 53 41. 16 46. 89 52. 66 58. 68 A V A N C E FÍ SI C O 0 0. 165 0. 256 0. 362 0. 638 0. 945 1. 525 1. 878 2. 251 2. 761 3. 846 7. 23 7. 94 10. 48 11. 09 11. 72 12. 13 13. 81 17. 05 20. 94 27. 65 30. 04 34. 66 38. 04 42. 67 47. 28 12
    • PROYECCION EJECUCION 4 MESES (IPC 5) mmusd abril-07 mayo-07 junio-07 julio-07 programa proyección programa proyección programa proyección programa proyección COQUIZADORA 13.5 8.9 17.8 14.1 14.2 14.6 8.7 13.6 REGENERADOR AMINA 0.6 0.5 1.1 1.0 0.5 0.7 0.5 0.8 HDS NAFTAS 2.5 1.1 2.8 2.0 3.4 4.3 0.6 4.5 TOTAL IPC 5 16.6 10.6 21.7 17.1 18.0 19.6 9.7 18.9 Actividades relevantes: Isométricos de tuberías al 100% Terminación de 2 tambores de Coque y Sistema de corte de Coque en sitio Llegada a sitio de las torres de DEA Llegada a sitio de 2 reactores, compresores y torres de proceso de HDS de Naftas 13
    • IPC 5 Avance Real Certificado al 31 de Marzo 2007 PROYECTO TOTAL PAQUETE V 100 AVANCE FISICO (NO CERTIFICADO) 90 47% 80 70 V N E C ML D AA C A U UA 60 57.4% 50 PROGRAMA DE 40 RECUPERACIÓN 30 20 REAL MARZO 10 36.3% % 0 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 38 41 44 47 50 53 56 59 62 65 68 71 74 77 80 83 86 89 93 96 99 02 05 08 11 14 17 20 23 26 29 32 35 38 41 44 47 50 4 2 3 3 4 4 5 6 6 7 7 8 9 7 8 8 9 9 0 1 1 2 2 3 4 2 3 3 4 4 5 6 6 7 7 8 9 8 PROGRAMADO 0 0 0 0 0 2 2 2 3 5 7 9 10 12 14 16 17 19 21 24 29 35 42 47 56 63 68 75 80 84 86 88 90 91 92 95 99 10 REAL 0 0 0 0 0 2 2 2 3 5 7 9 10 12 14 16 17 19 20 23 25 27 29 30 33 36 40 45 52 57 CONTRACTUAL 0 0 0 0 1 1 2 3 6 8 12 14 18 22 25 28 31 35 41 46 51 60 67 72 76 79 83 85 86 88 89 90 91 95 95 96 10 10 14
    • PROYECCION EJECUCION 4 MESES (IPC 6) mmusd abril-07 mayo-07 junio-07 julio-07 programa proyección programa proyección programa proyección programa proyección ALQUILACION U- 18000 5.9 1.8 3.8 1.7 2.0 0.8 1.4 0.9 ALQUILACION U- 19000 2.4 1.3 2.1 1.1 1.6 0.6 1.4 0.9 TOTAL IPC 6 8.3 3.1 5.8 2.9 3.6 1.4 2.8 1.7 Actividades relevantes: Terminación de la ingeniería con planos revisión 0 Se hará la revisión de la construcción por el licenciador UOP 15
    • IPC 6 Avance Real Certificado al 31 de Marzo 2007 PERIODO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 05 06 07 MES MAR APR MAY JUN JUL AUG SEP OCT NOV DEC FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC FEB MAR APR MAY JUN JUL AUG SEP OCT NOV FEB JAN JAN 100.0% 90.0% Real 82.7% 88.5% 80.0% 70.0% AVANCE ACUMULADO Programa 60.0% objetivo Samsung 50.0% 40.0% Programa 30.0% contractual 20.0% 10.0% 0.0% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Programa 0.1% 0.2% 0.4% 0.5% 0.7% 1.6% 3.0% 4.6% 5.7% 7.9% 9.6% 12.4% 15.7% 19.0% 22.6% 27.0% 32.1% 36.5% 40.6% 46.5% 53.9% 60.2% 65.7% 71.1% 75.1% 79.4% 85.0% 89.3% 92.3% 94.6% 95.8% 96.7% 97.1% 100.0% Contractual Programa 0.3% 0.6% 0.8% 2.1% 3.6% 5.3% 7.3% 10.1% 12.9% 16.2% 18.9% 22.4% 25.8% 31.1% 36.6% 42.4% 50.1% 58.1% 65.6% 72.7% 78.6% 83.9% 88.4% 91.5% 94.0% 96.0% 97.1% 98.2% 99.4% 100.0% 100.0% 100.0% 100.0% Objetivo Real 0.3% 0.6% 0.7% 1.4% 3.1% 4.7% 6.9% 9.6% 12.1% 14.6% 16.9% 20.5% 24.3% 28.8% 34.9% 40.5% 46.1% 53.8% 60.1% 63.3% 67.9% 74.1% 78.3% 81.0% 82.7% 84.7% 86.6% 87.5% 88.5% 16
    • PROYECCION EJECUCION 4 MESES CURVA TOTAL PROYECTO (incluye desfogues, oleoducto y gasoducto) MARZO JULIO 100% contractual recuperacion real financiero real fisico 90% contractual 83.9% 80% recuperación 76.7% 70% 71.1% real fisico 63.2% 60% avance 53.8% real financiero 50% 40% 30% proyección proyección 20% 10% 0% di 4 di 5 di 7 di 6 fe 3 fe 4 fe 5 fe 6 fe 7 ab 4 ag 04 ab 5 ag 5 ab 6 ag 06 ab 7 ag 07 ab 8 oc 4 oc 5 oc 6 oc 7 ju 4 ju 5 ju 6 ju 7 08 t -0 t -0 t -0 t -0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c- c- c- c- c- b- n- b- n- b- n- b- n- b- o- o- o- o- r- r- r- r- r- di 17
    • Estado Actual de la Procura de Equipos marzo-07 EQUIPOS EQUIPOS CON TOTAL EQUIPOS EQUIPOS EQUIPOS EN PENDIENTES EQUIPOS 100% 85% DE UNIDAD EQUIPOS RECIBIDOS EN POR EN FABRICADOS FABRICACION PROCESO DE MECANICOS OBRA TRANSITO FABRICACION EMBARCAR ó MAS IPC 2 * 490 319 4 5 328 64 62 IPC 3 752 319 13 6 338 18 396 IPC 4 ** 484 148 17 59 224 42 208 IPC 5 444 93 40 18 151 195 98 IPC 6 329 243 41 2 286 29 14 GRAN TOTAL 2499 1122 115 90 1327 348 778 * Se tienen 36 equipos pendientes de colocar para Obras de Integración, los cuales no son críticos y están de acuerdo a programa. ** 10 equipos sin colocar 18
    • Cantidad de Personal oc t- - 2,000 4,000 6,000 8,000 10,000 12,000 04 di c- 04 fe b- 0 5 ab r- 05 ju n- 05 ag o- 05 oc t- 05 di c- 05 fe b- 0 6 ab r- 06 ju n- 06 ag o- 06 oc t- 06 di c- 06 fe b- 0 11,000 7 ab r- 07 ju n- 07 10,328 ag o- 07 oc t- 07 di c- 07 pronostico fe b- 0 8 Fuerza Hombre de Construcción (marzo 07) ab real r- 08 19
    • Problemática y Acciones Problemática 20
    • Pendientes de Definición Liberación de terrenos para Oleoducto y Gasoducto. Pendiente regularizar 4 predios, 2 de ellos próximos a liberarse Elaboración de especificaciones para el Sistema de Mezclado de Gasolinas 21
    • Problemática Administrativa (Reclamos) IPC III (Dragados Industriales) Procedentes En Revisión Asunto Monto (Millones USD) Asunto Monto (Millones USD) Contratista Pemex Mejoramiento masivo de suelos 13.5 8.7 Arreglo en dos niveles del tren 4.13 de cambiadores de calor de Planta Combinada Cambio de especificaciones del 1.9 1.5 Modificación de tubería de 0.17 Paquete de Desalado succión de bombas. Modificaciones ingeniería básica de 25.1 23.7 Total 4.30 HDD para producir Diesel de Ultra bajo Azufre - - - No Procedentes - - - Orden de compra de 6.41 compresores de Planta Catalítica - - - Cambio de Convenio Sindical 5.75 Total 40.5 33.9 Total 12.16 22
    • Problemática Administrativa (Reclamos) IPC IV (Minatrico) Procedentes No Procedentes Asunto Monto (Millones USD) Asunto Monto (Millones USD) Contratista Pemex Mejoramiento masivo de suelos 2.15 1.7 Eficiencia de horno de Planta 0.3 de Gasóleos Instalación de cabezal independiente 0.26 0.15 Rediseño de líneas de gas de 0.2 de desfogues de los PSV de la proceso Planta de Azufre Planta de Gasóleos Convenio modificatorio por 105 días En revisión Ampliación de edificio 0.1 respuestas tardías en aclaraciones (89 días) eléctrico Planta de Hidrógeno de ingeniería básica - - - Modificación de tubería de 0.17 succión de bombas. Total 2.41 1.85 Total 2.62 IPC VI (Samsung) Incremento de precios de los 1.0 1.0 Sistema de Mitigación 3.0 catalizadores 23
    • Problemática Administrativa (Reclamos) Art. 59 (Circunstancias Económicas de Tipo General) Monto (Millones de USD) IPC Contratista Contratista •Lineamientosemitidos por la SEFUPU (Acero, Cobre, Aluminio) (Estimado DCIDP) II ICA - Fluor - 0.6 III Dragados Industrial 104.8 11.3 IV Minatrico 48.8 7.2 V Ebramex 34.3 7.3 VI Samsung 30.0 2.8 Total : 217.9 29.2 * No considera metales como: Titanio, Níquel y Molibdeno 24
    • Problemática en la Ejecución de los Proyectos Retrasos en el desarrollo de la ingeniería Colocación tardía de pedidos de equipo y materiales Lluvias mayores al promedio anual durante el 2006 Condiciones de las cimentaciones diferentes a las estimadas originalmente. Insuficiente personal calificado disponible en la región Bajo desempeño de algunos fabricantes nacionales, principalmente Consorcio Industrial Equipos Monto Fabricante Totales Entregados (Millones USD) Consorcio Industrial 88 38 69.3 INDESIN 202 72 14.0 EFERCO 49 4 2.9 BIMSA 192 47 11.2 25
    • Acciones Se tienen reuniones semanales en campo y por video- conferencia con personal de Ingeniería de los IPC- III, IV y V con el propósito de resolver la mayor cantidad de problemas de campo. Se realizan visitas periódicas a los talleres de fabricación de los fabricantes nacionales en especial con Consorcio Industrial que tiene los principales equipos del Paquete III y V. Se revisan semanalmente con los contratistas las actividades de construcción. 26
    • Estrategia de Ejecución Hidrogenoducto Contratación de Universidad Autónoma de Puebla para el desarrollo de la Ingeniería Legal. Compra de tubería con aplicación de recubrimiento tricapa y lastrada. * Licitación de IPC * Se requiere modificar Convenio Específico entre Pemex-Refinación y DCIDP para poder comprar 27
    • Actualización de Estimado de Costo La DCIDP está llevando a cabo una actualización del costo del Proyecto en donde se incluye lo siguiente: Volúmenes adicionales y extraordinarios Mejoras operativas y de seguridad Actualización de factores inflacionarios Reclamos de contratistas 28
    • Fotografías del Proyecto Fotografías 29
    • Planta de Servicios Auxiliares PLANTA DE SERVICIOS AUXILIARES RACK PRINCIPAL 30
    • Planta de Aguas Amargas 31
    • Planta Combinada 32
    • Planta Catalítica FCC 2 33
    • Planta Catalítica FCC 2 34
    • Planta HDD 35
    • Planta HDD 36
    • Planta Hidrodesulfuradora de Gasóleos 37
    • Planta de Hidrógeno 38
    • Planta Recuperadora de Azufre 39
    • Planta de Coquización Retardada y Gas Asociada PROGRESO DE CONSTRUCCION DEL EDIFICIO DE TAMBORES DE COKE 40
    • Planta de Coquización Retardada y Gas Asociada PROGRESO DE CONSTRUCCION DE TAMBORES DE COKE 41
    • Planta de Coquización Retardada y Gas Asociada PROGRESO DE MONTAJE DE CALENTADOR H-31001 42
    • Planta HDS Naftas de Coquización PROGRESO DE MONTAJE DE EQUIPOS 43
    • Planta Regeneradora de Amina CIMENTACIONES DE EQUIPOS Y RACKS TUBERIAS 44
    • Plantas de Alquilación 45
    • Planta de Alquilación I (U-18000) 46
    • Planta de Alquilación I (U-18000) 47
    • Planta de Alquilación I (U-18000) CUARTO DE CONTROL SATELITE 48
    • Dirección Corporativa de Ingeniería y Desarrollo de Proyectos Reconfiguración de la Refinería “Gral. Lázaro Cárdenas” Minatitlán, Veracruz Minatitlán, Ver. Minatitlá abril 2007 49