4.2 production schedule
Upcoming SlideShare
Loading in...5
×
 

4.2 production schedule

on

  • 310 views

 

Statistics

Views

Total Views
310
Views on SlideShare
308
Embed Views
2

Actions

Likes
0
Downloads
0
Comments
0

2 Embeds 2

http://www.slideshare.net 1
http://cfgscmmoushomi-record.blogspot.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

4.2 production schedule 4.2 production schedule Document Transcript

  • 4143375-381000<br />Production Schedule <br />WhatWhoWhereWhenProps/ Material/ Equipment neededTICK once completedMeeting (7 meetings in total)(meeting discussions in production meeting schedule)BRiiNK ProductionCFGS Library Harley Grove05/11/1008/11/1005/12/1005/01/1120/01/1110/02/1127/04/11Computer, notepadBook Venues(12 Johnson House)BRiiNK Production and owner of the venue12 Johnson House10/04/11Location ContractPermission slip Deadline for volunteersBRiiNK Production, actors, volunteers and helpersSchool Atrium02/03/11Permission Contract & Job DescriptionHealth and SafetyBRiiNK Production12 Johnson House, Shopping mall10/04/11Health and Safety List First Shooting BRiiNK Production and actors including volunteers and helpers12 Johnson House 15/04/11Cameras, Tripod, Costumes, & Storyboard Second ShootingBRiiNK Production and actors including volunteers and helpersShopping mall20/04/11Cameras, Tripod, Costumes, & StoryboardThird ShootingBRiiNK Production and volunteers and helpersOutside own house23/04/11Cameras, Tripod, Costumes, & Storyboard<br />