• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Lost Foam Process Steps
 

Lost Foam Process Steps

on

  • 1,045 views

Description of steps in Industrial Lost foam casting process. Presentation

Description of steps in Industrial Lost foam casting process. Presentation

Statistics

Views

Total Views
1,045
Views on SlideShare
800
Embed Views
245

Actions

Likes
0
Downloads
10
Comments
0

3 Embeds 245

http://www.cermak-lostfoam.com 128
http://cermak-lostfoam.com 79
http://localhost 38

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Lost Foam Process Steps Lost Foam Process Steps Presentation Transcript

    • LOST FOAMPROCESS CHAIN
    • Raw material with blowing agentPreexpansion Steam heat appliedMoulding EPS expanded factor ca. 30 Density control criticalStabilisationGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • EPS beads filled into Al toolPreexpansion Steam heated to expand and fuseMoulding Cooled to avoid distorsion Automatic removalStabilisationGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • Controlled shrinkagePreexpansion Accelerated processingMoulding Repeatability 0,2Stabilisation 0,1 0Glueing -0,1 0 100 200 300 400Coating -0,2 With Stabilisation Oven -0,3 Without Stabilisation OvenDrying -0,4 -0,5Cluster Insertion time (mins)Sand FillCompactionMetal PouringExtraction
    • Preexpansion Hot melt glueMoulding Short “open time” RepeatabilityStabilisation AccuracyGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • PreexpansionMoulding Coating developed for lost foam RepeatabilityStabilisation Ceramic slurryGlueing Precise viscosity/solidsCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • PreexpansionMoulding Removal of all moisture Temperature/humidity controlledStabilisationGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • PreexpansionMouldingStabilisationGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • Preexpansion Dry unbonded sandMoulding Rain-fillStabilisation Uniform Rate controllableGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • PreexpansionMouldingStabilisationGlueingCoatingDryingCluster InsertionSand Fill Vibration Analysis 5,0 5 FFT Analysis 4Compaction 2,5 3 0,0 2Metal Pouring -2,5 1 0 -5,0 -1Extraction 0 25 50 75 100 0 25 50 75 100 ms Hz
    • EPS liquified and volatisedPreexpansion Metal replaces foamMoulding All details reproducedStabilisationGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction
    • No shakeoutPreexpansion Sand dry and looseMoulding Sand easily recycledStabilisationGlueingCoatingDryingCluster InsertionSand FillCompactionMetal PouringExtraction