
BURJ DUBAI
Civil Engineer
Adrian Smith Bill Baker
Architect
Construction of Burj Dubai
2004 2005
200
Going to be finished
2006 2008
Opening
Ceremony
On
4 January
2010
Inside The Burj Dubai
Records:
1.Tallest existing structure
2.Highest elevator system
3.Most floors:163
4.Highest Restaurant :122th floor
5.High...
Burj Dubai
Burj Dubai
Burj Dubai
Burj Dubai
Upcoming SlideShare
Loading in …5
×

Burj Dubai

1,499 views

Published on

Structural engineering

Published in: Engineering, Travel, Business
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,499
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
105
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

Burj Dubai

  1. 1. 
  2. 2. BURJ DUBAI
  3. 3. Civil Engineer Adrian Smith Bill Baker Architect
  4. 4. Construction of Burj Dubai 2004 2005
  5. 5. 200 Going to be finished 2006 2008
  6. 6. Opening Ceremony On 4 January 2010
  7. 7. Inside The Burj Dubai
  8. 8. Records: 1.Tallest existing structure 2.Highest elevator system 3.Most floors:163 4.Highest Restaurant :122th floor 5.Highest new-year display on fireworks 6.Second highest swimming pool :76th floor

×